REE mineralization in first hole at Pomme Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
6th June, 2023
ASX: MTM
OVER 500 METRES OF REE MINERALISATION
INTERSECTED IN FIRST DIAMOND DRILL HOLE AT THE
POMME PROJECT
Highlights:
Visible rare earth element (REE) mineralisation identified in drill core
Mineralisation verified using handheld XRF
500+ metre intersection of variably mineralised carbonatite, open at depth
Sampling for detailed assays in progress, with results expected within 4 to
6 weeks
First of a 10 hole, 5,000 metres first-pass program to test the Pomme
carbonatite complex and the known REE-niobium mineralisation.
MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) is very pleased to report that
over 500 metres of visible REE mineralisation has been intersected in the first diamond drill
hole completed at the Pomme REE-Nb project in Québec, Canada (Pomme or the Project).
Assay results are pending and expected within approximately 4 to 6 weeks.
Commenting on the completion of the first drill hole, MTM Managing Director Lachlan
Reynolds said:
“We are extremely excited by the results of this first diamond drill hole. Not only has it
intersected prospective carbonatite rocks but it also appears to be continuously
mineralised over a 500+ metre interval and based on the visual estimates may contain a
number of zones containing significant REE grade.
This hole is a vindication of our confidence that this drilling campaign at the Pomme
project could have potential for making a major new rare earth element and niobium
deposit discovery. We are now eagerly waiting in the results of assays and getting
samples to the laboratory in Canada is a high priority. Drilling is ongoing and the second
hole is underway.
The Kintavar Exploration team managing the exploration program on-site are
congratulated for delivering this excellent result, which comes only 3 months after signing
the option agreement over the project.”
DIAMOND DRILLING PROGRAM
A program of diamond drilling was recently commenced at Pomme (see MTM ASX
announcement dated 26 May 2023). The first drill hole of that program, POM-23-01 (Figure
2), was subsequently completed at a depth of 558 metres downhole (Appendix I). This hole
was collared approximately 100 metres to the north of a historical drill hole MVX-12-01 that
also intersected in excess of 500 metres of REE-Nb mineralisation.
P: +61 (0)8 6391 0112
MTM Critical Metals Limited (ABN 27 645 885 463)
E: info@mtmcriticalmetals.com.au
W: www.mtmcriticalmetals.com.au
Suite 2, 38 Colin Street, West Perth, 6005, Australia
@MTM Critical
@MTM Critical Metals
Figure 1: Diamond drill rig operational on hole POM-23-001 at the Pomme project, May 2023.
Figure 2: Diamond drilling status at the Pomme project showing historical and current diamond
drill hole collar locations.
Page 2
POM-23-01 intersected 31.75 metres of unconsolidated glacial sediments (till) at the top of
the hole and then cored carbonatite rocks to the end of hole (EOH). The carbonatites show
significant variation in lithology, including calciocarbonatite, ferrocarbonatite and
silicocarbonatite (Appendix II). The carbonatites are open to depth beyond the EOH.
VISIBLE REE MINERALISATION
Visible REE mineralisation was observed in all rock types, in varying abundance, over the full
length of carbonatite intersected in hole POM-23-01 to EOH (Appendix II).
The REE mineralisation has been identified by the geologists on-site, who have extensive
prior experience with the geology of the Montviel REE-Nb deposit located approximately 7 km
south of Pomme. Their observations have been routinely cross-checked using a hand-held
pXRF device, which has confirmed the presence of REE’s.
The mineralisation, which is tentatively identified as the fluoro-carbonate minerals cebaite
(Ba3(Nd,Ce)2(CO3)5F2) and/or bastnaesite ((La,Ce,Y)CO3F), has a very distinct red colour and
is easily distinguished in the drill core (see Figures 3 to 5). Monazite ((La,Ce,Nd)PO4), a
brownish phosphate REE mineral, also occurs frequently in the first hole and apatite enriched
in REE was locally logged within specific carbonatite layers. The mineralisation occurs as
medium to coarse-grained disseminations and blebs allowing the geologists to make a
subjective estimate of the REE grade (Appendix II).
Figure 3: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within ferrocarbonatite/calciocarbonatite host rock. Hole POM23-01, Box 15, 91.1 – 95.5 metres downhole depth.
Mineralisation was locally logged with up to 20% visual abundance in the drill core, though
typically ranged from 1% to 5% abundance over decimetre to metre scales. A number of
zones from 10 metres to 20 metres thickness (downhole length) were estimated to contain
“medium grade” REE oxide, considered to be approximately 0.5% to 1% total rare earth
element (TREO) content (Appendix II).
Page 3
Figure 4: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within silicocarbonatite host rock. Hole POM-23-01, Box 3, 39.0
– 43.5 metres downhole depth.
Figure 5: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within ferrocarbonatite host rock. Hole POM-23-01, Box 104,
475.6 – 479.9 metres downhole depth.
Page 4
FURTHER WORK
Drilling is continuing at Pomme and the drill rig has mobilised to the second hole of the
program, located approximately 500 metres to the north of POM-23-01 (Figure 2).
Geological logging and sampling of the drill core from POM-23-01 is currently underway.
Samples will be transferred to a sample preparation facility in the city of Val d’Or in due course.
Detailed assay results are expected to be available in 4 to 6 weeks depending on laboratory
turnaround times.
A total of 10 holes for approximately 5,000 metres of drilling are planned as a first-pass test of
the Pomme carbonatite complex and the REE-Nb mineralisation (see MTM ASX
announcement dated 29 March 2023).
POMME REE-Nb PROJECT
Pomme is a known carbonatite intrusion with exceptional results from limited historical drilling,
showing enrichment in rare earth elements (REE) and niobium (Nb) and is considered to be
an extremely prospective exploration target. Pomme is located adjacent to the world-class
Montviel REE-Nb deposit (owned by Geomega Resources Inc), that has a defined total
indicated and inferred resource of 266 Mt @ 1.45% TREO & 0.14% Nb2O5.
MTM has entered into a binding option agreement with Geomega Resources to acquire a
100% interest in the Pomme claims and is now advancing exploration at Pomme to discover
a REE-Nb resource (see MTM ASX announcement dated 23 February 2023).
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Lachlan Reynolds
Managing Director
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: lachlan.reynolds@mtmmetals.com.au
Simon Adams
Company Secretary
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: simon.adams@mtmmetals.com.au
Page 5
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for rare earth elements
(REE), gold, lithium, nickel, and base metals in the Goldfields and Ravensthorpe districts of Western Australia and
in the Abitibi region of the Province of Québec. The Company holds over 4,500km2 of tenements in three prolific
and highly prospective mineral regions in Western Australia and has an option to acquire, through an earn-in
arrangement, a 100% interest in 2,400 ha of exploration rights in Québec, Canada. The East Laverton Projects is
made up of a regionally extensive package of underexplored tenements prospective for REE, gold and base metals.
The Mt Monger Gold Project comprises an area containing known gold deposits and occurrences in the Mt Monger
area, located ~70km SE of Kalgoorlie and immediately adjacent to the Randalls gold mill operated by Silver Lake
Resources Limited. The Ravensthorpe Project contains a package of tenements in the southern part of Western
Australia between Esperance and Bremer Bay which are prospective for a range of minerals including REE, lithium,
nickel and graphite. The Pomme project in Québec is a known carbonatite intrusion that is enriched in REE and
niobium and is considered to be an extremely prospective exploration target adjacent to a world class REE resource
(Montviel deposit). Priority drilling targets have been identified in all project areas and the Company is well funded
to undertake effective exploration programs. The Company has an experienced Board and management team
which is focused on discovery to increase value for Shareholders.
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents
information compiled by Mr Lachlan Reynolds. Mr Reynolds is the Managing Director of Mt Monger Resources
Limited and is a member of both the Australasian Institute of Mining and Metallurgy and the Australasian Institute
of Geoscientists. Mr Reynolds has sufficient experience of relevance to the styles of mineralisation and types of
deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Reynolds consents to the inclusion in this announcement of the matters
based on information in the form and context in which they appear.
Previous Disclosure
The information in this announcement is based on the following MTM Critical Metals Limited (formerly Mt Monger
Resources Limited) ASX announcements, which are all available from the MTM Critical Metals Limited website
www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
23 February 2023, “Mt Monger to Acquire Advanced Carbonatite REE-Nb Project in Canada”
29 March 2023, “Countdown to Diamond Drilling Program at Pomme REE-Nb Project”
26 May 2023, “Drilling Commences at the Pomme REE-Nb Project, Quebec”
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original ASX announcements and that all material assumptions and technical parameters
underpinning the relevant ASX announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are represented have not been
materially modified from the original ASX announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of
subjective judgment and analysis and assumption. MTM Critical Metals does not accept any liability in relation to
any such matters, or to inform the Recipient of any matter arising or coming to the company’s notice after the date
of this document which may affect any matter referred to herein. Any opinions expressed in this material are subject
to change without notice, including as a result of using different assumptions and criteria. This document may
contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of
words such as “seek”, “anticipate”, “believe”, “plan”, “expect”, and “intend” and statements than an event or result
“may”, “will”, “should”, “could”, or “might” occur or be achieved and other similar expressions. Forward-looking
information is subject to business, legal and economic risks and uncertainties and other factors that could cause
actual results to differ materially from those contained in forward-looking statements. Such factors include, among
other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal
risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the
statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements
for events or circumstances that occur subsequent to such dates or to update or keep current any of the information
contained herein. The Recipient should not place undue reliance upon forward-looking statements. Any estimates
or projections as to events that may occur in the future (including projections of revenue, expense, net income and
performance) are based upon the best judgment of MTM Critical Metals from information available as of the date
of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results
will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied
upon as, a promise or representation as to the past or future. MTM Critical Metals, its affiliates, directors, employees
and/or agents expressly disclaim any and all liability relating or resulting from the use of all or any part of this
document or any of the information contained herein.
Page 6
APPENDIX I - Drill Hole Collar Details
Hole ID
East
North
POM-23-01
POM-23-02
Prop-1
Prop-4
Prop-5
Prop-6
Prop-7
Prop-8
Prop-9
Prop-10
389,105
389,105
389,230
389,580
389,600
389,600
389,615
390,120
390,120
390,120
5,526,967
5,527,467
5,527,965
5,528,235
5,527,685
5,527,185
5,526,760
5,528,110
5,527,610
5,527,110
Dip
( o)
-50
-50
-50
-50
-50
-50
-50
-50
-50
-50
Azimuth
( o)
000
000
000
000
000
000
000
000
000
000
Depth
(m)
558 (EOH)
-
Status
Completed
In progress
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Coordinate system North American Datum 1983 (NAD 83), UTM Zone 18
Page 7
APPENDIX II – Drill Hole Summary Log
From
(m)
0.0
To
(m)
31.7
31.7
54
54
151
Main lithology
Glacial till
Silicocarbonatite with ferrocarbonatite
(25%), calciocarbonatite (15%) and
ultramafic silicocarbonatite dykes (10%)
Silicocarbonatite matrix breccia with
calciocarbonatite (25%), ferrocarbonatite
(15%) and ultramafic silicocarbonatite
dykes (5%)
Ultramafic silicocarbonatite dykes with
local calciocarbonatite
Silicocarbonatite with ferrocarbonatite
(15%), calciocarbonatite (10%) and
ultramafic silicocarbonatite dykes (5%)
Ferrocarbonatite with silicocarbonatite
(20%) and calciocarbonatite (5%)
Mineralization
Summary
None
REE MX up to 5% in calciocarbonatite and
ferrocarbonatite,
in silicocarbonatite 1-2% PY-PO and <1% REE MX
REE MX generally 1-2%, up to 20% over dm segments,
associated with calciocarbonatite and ferrocarbonatite,
tr PY-PO in silicocarbonatite
2% local REE MX associated with calciocarbonatite
Comments
From (m)
Overburden
Dominance of calciocarbonatite clasts
151
175
175
228.5
Kimberlitic/breccia texture
228.5
246
246
265
Mixed zone of silico, ferro and
calciocarbonatite
265
335
Silicocarbonatite
REE MX 1-3% more finely disseminated
More homogeneous with some dm-m
intervals with breccia texture
335
357
Silicocarbonatite matrix breccia with
calciocarbonatite (30%) and
ferrocarbonatite (5%)
3-5% REE MX well distributed and strongly associated
with calcio and ferrocarbonatite
Up to 20% REE MX over dm intervals
Breccia seems to be only associated with
the silicocarbonatite
357
409
Ultramafic silicocarbonatite dykes with
ferrocarbonatite (30%) and
calciocarbonatite (5%)
REE MX included in the three types of carbonatite,
tr PY, up to 10% locally (dm intervals)
Strongly altered calciocarbonatite
between 374 and 374.3m with low grade
REE MX and automorph calcite grains
409
426
Silicocarbonatite matrix breccia and
ferrocarbonatite in equal proportions
(45%) and calciocarbonatite (10%)
426
473
Silicocarbonatite with calciocarbonatite
and ferrocarbonatite
Up to 5-20% REE MX associated with ferrocarbonatite
and calciocarbonatite, <1% in silicocarbonatite
Up to 5-20% REE MX associated with ferrocarbonatite
and calciocarbonatite, <1% in silicocarbonatite
REE MX up to 5% in calciocarbonatite and
ferrocarbonatite,
in silicocarbonatite 1-2% PY-PO and <1% REE MX
Up to 20% REE MX in dm and m intervals strongly
associated with the ferrocarbonatite,
Up to 5% in dm intervals within calciocarbonatite and
<1% in the silicocarbonatite
Local REE MX, up to 5% in calciocarbonatite and
ferrocarbonatite,
<1% in silicocarbonatite,
Up to 5% PY at the end of the interval in local fractures
Visual REE Grade
To (m)
Estimate
Becomes a stockwork near the end of the
section
Low grade, locally
enriched
31.7
73
73
94
94
123
123
126
126
151
151
175
Trace REE
175
228.5
Mainly Low grade,
several dm-m Mid grade
intervals
228.5
246
Mid grade
246
265
Mainly Low grade,
several dm-m Mid grade
intervals
265
335
Low grade
335
346
346
357
Mid grade
Mainly Low grade,
several dm-m Mid grade
intervals
357
409
Mainly Low grade, with a
dm Mid grade interval
406
411
Mid grade
426
453
Mainly Trace REE and
low grade in dm intervals
Mid grade
Low grade, locally
enriched
Local dm Mid grade zone
Low grade, locally
enriched
Page 8
From
(m)
473
To
(m)
480
480
514
514
528
528
542
542
558(EOH)
Main lithology
Ferrocarbonatite
Ferrocarbonatite with silicocarbonatite
(45%) and calciocarbonatite (5%)
Silicocarbonatite with dm intervals of
ferrocarbonatite (10%) and
calciocarbonatite (5%)
Silicocarbonatite matrix breccia with
ferrocarbonatite and calciocarbonatite
clasts
Massive ultramafic silicocarbonatite
Mineralization
Summary
5-10% REE MX
<3% REE MX in ferrocarbonatite,
Up to 10% locally in the silicocarbonatite and up to 1%
in the calciocarbonatite
<1% REE MX in silicocarbonatite, up to 2% in
ferrocarbonatite and <1% in calciocarbonatite,
tr PY disseminated and PO up to 5% locally in veinlets
Comments
Well distributed low grade mineralization
over the interval
480
514
Low grade
Breccia texture
Presence of dm graphite lense at 518m
514
528
Low grade
<1% REE MX
tr PO-PY
Fault from 533 to 537.5m with CNR
528
558
Trace REE
From (m)
473
Visual REE Grade
To (m)
Estimate
480
Mid grade
tr REE MX, tr PY-PO
Notes:
Preliminary drill hole log only and subject to change. Detailed logging is in progress.
The geometry and orientation of the REE mineralised structures has not been determined and its relationship to the angle of the drill hole is unknown. Intervals are shown
as downhole lengths only, the true width is not yet known.
Visual REE grade is a subjective assessment of mineralisation based on the estimated abundance of REE minerals in the drill core. The presence of REE’s within the
mineralisation has been verified using a handheld portable X-Ray Fluorescence machine (pXRF). Detailed assays are required to determine the true REE grade.
Absolute percentages of the lithologies and mineralisation abundance are shown,
Actual TREO grade has not been reported and will require verification from detailed assays. Sampling is in progress and detailed assays are expected to be available in
4 – 6 weeks.
Nb mineralisation grade has not been visually estimated. Detailed assays will be required to determine the Nb content of the drill core samples.
Abbreviations:
CNR – core not recovered
PO – pyrrhotite
PY – pyrite
REE MX – rare earth element mineralisation
dm – decimetre (10 centimetres)
m - metre
Trace REE – < 0.1 % TREO
Low Grade – 0.1 to 0.5% TREO
Mid Grade – 0.5 to 1.0% TREO
High Grade - >1.0% TREO
Page 9
APPENDIX III - JORC Compliance Tables
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Sampling techniques
Drilling techniques
Drill sample recovery
Logging
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Commentary
Not applicable, no sampling completed.
Detailed sampling of half-core cut with a diamond core saw is in progress to
provide detailed assays.
Diamond drilling
NQ core size (core diameter 47.6 mm)
Standard inner tube core recovery method
Core is routinely measured and compared with drilling depth to assess recovery.
Recovery is excellent, typically 100%.
There is no available data to assess if there is a relationship between recovery
and grade.
Drill core has been geologically logged to a level of detail to support appropriate
future Mineral Resource estimation.
Logging is qualitative in nature. pXRF readings have been routinely taken to
confirm REE mineralisation is present and calibrate visual mineralisation
estimates.
Core photography is being routinely undertaken.
100% of the drill core and the relevant mineralisation intersections have been
logged.
Page 10
Criteria
JORC Code Explanation
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Quality of assay data
and laboratory tests
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Commentary
Not applicable, no sampling completed.
Not applicable, no assays completed.
Not applicable, no sampling or assaying completed.
Drill hole collar locations have been surveyed using handheld GPS with an
accuracy of approximately ±3 metres.
Downhole surveys have been completed using REFLEX EZ-TRAC device.
The grid system used for is North American Datum 1983 (NAD 83), UTM Zone
18.
Topographic control is based on existing topographic maps and is not well
constrained but this is not material at the current stage of exploration.
Visual grade estimates are reported for one drill hole only.
Data spacing is not suitable to establish geological and grade continuity.
Visual grade estimates as reported are subjective and are not suitable for the
Mineral Resource and Ore Reserve estimation procedure.
Page 11
Criteria
Orientation of data in
relation to geological
structure
Sample security
Audits or reviews
JORC Code Explanation
Commentary
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques and data.
Visual estimates have been made over broad zones of similar geology and
mineralisation in the drill hole. Detailed sampling for assay is in progress.
No sample compositing has been applied.
Information is not yet available to determine if the orientation of the drill hole
could potentially introduce a sampling bias.
Not applicable, no sampling completed.
Not applicable, no sampling completed.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other parties.
The tenements relevant to this announcement are 24 claims located in Québec,
Canada.
The claims are held 100% by Geomega Resources Inc.
A net smelter royalty of 2% is payable to Niogold Mining Corp.
MTM Critical Metals Ltd has executed an option agreement to acquire a 100%
interest in the claims subject to cash and share based payments and exploration
expenditure requirements.
The tenements are located on Category II Lands of the Cree First Nation of
Waswanipi. Mining, exploration and geoscientific works must be carried out in
such a manner as to avoid unreasonable conflict with the rights of the First
Nation people.
16 claims are located wholly or in part within restricted areas associated with
government hydro-electric schemes but this is not considered to be an
impediment to exploration or future development.
The tenements are secure and there are no known impediments to obtaining a
licence to operate in the area.
Previous exploration of the project area is limited.
In the early 1990’s airborne magnetic surveys identified a circular magnetic
anomaly that was considered as a potential kimberlite-hosted diamond target.
No drilling was completed.
Detailed geological mapping of the area was undertaken in 2005 but carbonatite
was not identified, probably due to limited bedrock exposures.
Page 12
Criteria
JORC Code Explanation
Geology
Deposit type, geological setting and style of mineralisation.
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes, including Easting and northing of the drill hole
collar, Elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar, dip and azimuth of the hole, down hole
length and interception depth plus hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high grades)
and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should