Highlights
During the September 2024 quarter, MTM made significant advancements in the commercialisation and application of Flash
Joule Heating (FJH) technology, positioning it as a disruptive force in the sustainable recovery of critical metals from highvalue waste streams and mineral ores.
KEY HIGHLIGHTS AND ACHIEVEMENTS
E-Waste Metal Recovery:
o Achieved high recovery of Gold, Silver and Copper from printed circuit boards (PCBs) without the use of
harmful chemicals.
o
o
Marked an 80% reduction in calcination time compared to traditional methods, with potential for a
dramatic reduction in energy use and CO₂ emissions.
1-Ton Per Day (TPD) Demonstration Plant Progress:
o Advanced design work is on track for completion by the end of Q4 2024, with construction to begin in
Q1 2025.
o
Reported successful recovery of ultra-high value gallium from semiconductor waste.
Commercial Lithium Calcination:
o FJH achieved over 90% conversion of spodumene from the alpha to beta form, exceeding the industry’s
commercial yield threshold.
o
Demonstrated FJH’s capacity for multi-metal extraction, reinforcing the process's efficiency in recovering
precious and base metals from electronic waste.
The demonstration plant will be able to process multiple feedstocks, including e-waste, lithium, rare earths,
and battery waste, establishing MTM’s capacity for commercial-scale operations by Q2 2025.
Strategic Partnerships and Market Opportunities:
o Ongoing discussions with international partners and industry leaders to secure strategic collaborations and
non-dilutive funding.
INNOVATING, DISRUPTING, AND DECARBONISING CRITICAL METAL SUPPLY
For the quarter ending 30 June 2024
2
Flash Joule Heating Technology
Flash Joule Heating (FJH) is a technique that utilises an intense short burst electrical current to generate high levels of heat
within a sample medium. The technology can be adapted to extract different types of metals by adjusting the heating
parameters, making it a versatile tool for various metal recovery processes.
Flash Joule Licencing with Rice University
Flash Metals Pty Ltd has executed a licence agreement with Rice University (Rice) to secure the exclusive global rights to FJH
technology for the processing of a broad range of materials. The license agreement gives MTM the global rights to the
proprietary technology under the associated patents for recovery of rare earth elements (REE) and other critical metals and
metallic compounds from industrial waste (including coal fly ash and bauxite residue), ores, electronic waste (e-Waste) and
end-of-life batteries (Black Mass). The licensed technology has the potential to disrupt traditional treatment processes for a
range of materials which could significantly enhance recovery rates and the economics of metal extraction.
Lithium Recovery
MTM achieved a significant breakthrough with its Flash Joule Heating (FJH) technology by demonstrating a 90% lithium
conversion yield from spodumene ore. The successful transformation from the refractory alpha (α) phase to the beta (β)
phase, essential for lithium extraction, was accomplished with 80% less processing time compared to conventional kiln
methods. These results position the technology as a highly efficient, lower-emission alternative to traditional calcination
processes, which typically consume significant energy and rely on fossil fuels.
Building on these successes, MTM also completed promising testwork converting spodumene concentrate directly into
lithium chloride using the FJH process. This achievement could streamline lithium refining by bypassing multiple processing
steps, leading to lower operating costs and faster production timelines. The ability to produce lithium chloride, which is highly
sought after for downstream battery manufacturing, significantly enhances the commercial viability of MTM’s technology.
Figure 1: FJH – “Game changer” potential for the lithium industry - 3 distinct opportunities
A key advantage of the FJH process is its potential to treat fines, the ultra-fine spodumene particles that are typically
discarded as waste in traditional processing methods. Recovering lithium from these fines represents a major opportunity to
reduce waste, improve resource efficiency, and enhance the sustainability of lithium production. This capability
addresses a critical pain point for the lithium industry, where fines management has long been a challenge, and offers a path
to maximise the value extracted from each tonne of ore.
For the quarter ending 30 June 2024
3
Ongoing discussions with top-tier industrial firms in Australia and the US underscore the commercial potential of this
technology. MTM’s innovations in lithium recovery align with the growing market demand for sustainable, energy-efficient
production methods, driven by the rapid expansion of electric vehicles and energy storage solutions.
Gallium Recovery from Semiconductor Waste
During the quarter, MTM reported the successful recovery of gallium from semiconductor waste using FJH technology by Rice
University researchers. This achievement reflects the versatility of FJH in extracting valuable metals from diverse feedstocks
beyond traditional ore bodies. Gallium, a critical component in semiconductors and high-performance electronics, has
increasingly strategic importance given the global drive toward advanced technologies, including 5G and solar cells.
The recovery of gallium aligns with MTM’s strategic focus on urban mining—capitalising on above-ground resources to meet
critical metal demand without the environmental and logistical challenges associated with mining. The ability to efficiently
extract gallium from e-waste and scrap materials further strengthens MTM’s proposition for the circular economy, where
waste materials are turned into valuable resources. Further optimisation is underway to increase yields, with MTM actively
pursuing partnerships with technology manufacturers interested in sustainable materials sourcing.
Figure 2: Schematic representation of Ga recovery from semiconductor scrap using FJH in a chlorinated atmosphere.
E-Waste Metal Recovery
MTM’s Flash Joule Heating technology continues to deliver promising results in e-waste recycling, achieving 67% silver and
48% copper recovery from printed circuit boards (PCBs) during the September quarter. These developments build on earlier
successes, including 70% gold recovery, and further demonstrate the multi-metal potential of FJH. Importantly, these results
were achieved without the use of harmful acids or incineration, highlighting the environmental benefits of the technology
compared to pyrometallurgical and hydrometallurgical processes. Subsequent to this, palladium & tin were also successfully
recovered with very high yields.
The FJH technology offers a sustainable and efficient solution ‒ by applying direct electrical energy under a chlorine gas
atmosphere, FJH can vaporize metals from e-waste and recover them in a 2-step procedure without using toxic acids or nonselective incineration. The FJH process works by 'flash' heating e-waste in a chlorine gas atmosphere, vaporizing the target
metals like gold for efficient separation and collection via metal chlorides.
For the quarter ending 30 June 2024
4
Challenges with Current Methods: Metal recovery from PCBs primarily uses pyrometallurgy and hydrometallurgy.
Pyrometallurgy involves high-temperature smelting, which releases toxic dioxins and furans, especially when burning e-waste
containing flame retardants, while hydrometallurgy relies on harmful acids that generate substantial toxic waste. Both
processes have high energy consumption, produce harmful emissions, and often struggle with low recovery rates for certain
metals, particularly silver.
E-waste, a growing global problem with over 60 million metric tonnes generated annually, contains high concentrations of
precious metals. The scalability of FJH technology offers a new path to efficiently recover these metals, turning discarded
electronics into valuable assets. MTM’s advancements in e-waste recycling respond to market demands for sustainable
recycling methods that reduce carbon emissions, prevent hazardous waste, and minimise resource extraction. Further
testing is planned to refine the process for additional metals, such as palladium and platinum, as MTM aims to capitalise on
the estimated US$70 billion of recoverable metals locked in global e-waste.
Figure 3: Schematical overview of FJH recovery of metals from e-waste
1-Ton Per Day Demonstration Plant
Significant progress was made during the quarter on the design and development of MTM’s 1-Ton Per Day (TPD) demonstration
plant, with detailed mechanical and process designs on track for completion by the end of Q4 2024. This facility will be a key
milestone in the commercialisation of FJH technology, demonstrating the viability of the process at scale. Construction is
scheduled to commence in Q1 2025, with the plant expected to be in commissioning by Q3 2025.
The demonstration plant is designed to process multiple feedstocks, including e-waste, lithium spodumene, rare earths, and
battery waste (‘black mass’). This versatility makes the facility attractive to strategic partners and potential clients focused
on critical metals recovery and supply security. MTM’s collaboration with KnightHawk Engineering, a leader in innovative
process engineering, ensures the rapid scale-up and optimisation of the plant. The 1-TPD plant will play a crucial role in
validating the technology's economic and environmental benefits, positioning MTM as a leader in sustainable metal recovery
and processing.
For the quarter ending 30 June 2024
5
Figure 4: Conceptual artist impression of FJH 1 TPD Demonstration Plant.
Figure 5: Indicative strategy for FJH TPD Demonstration Plant
Mineral Exploration
West Arunta Niobium & Rare Earths Project
Western Australia, Australia
The West Arunta Nb-REE Project comprises three exploration licences totalling 140km2 immediately adjacent to
tenements held by WA1 Resources Ltd (ASX:WA1) near the Luni Carbonatite Discovery and the P2 Carbonatite
Discovery; and Encounter Resources Ltd (ASX:ENR) where Nb-REE mineralised carbonatites have recently been
discovered.
During the quarter MTM continued with its negotiation efforts with Native Title holders for access to the tenements. The
Company’s West Arunta tenements lie with an Aboriginal Reserve and the Native Title and Heritage approvals for these areas
follow a very prescribed process. All on-ground exploration activities (including airborne surveys) and access to the tenements
For the quarter ending 30 June 2024
6
are prohibited unless heritage agreements are completed and statutory approvals are granted. The Company and its consultants
are working to progress these agreements and approvals as swiftly as possible.
Figure 6. The West Arunta Nb-REE Project location.
Pomme Rare Earths-Niobium Project
Québec, Canada
The Pomme REE-Nb Project is a known mineralised carbonatite intrusion located in south-western Québec, Canada
(Figure 3). The Project has exceptional results from a maiden diamond drilling program that was completed in 2023,
which has confirmed the widespread presence of carbonatite-hosted REE and Nb mineralisation, locally extending
to 500 metres below surface and open at depth.
MTM entered into a binding option agreement with Geomega Resources, Inc. (Geomega) to acquire a 100% interest in the
Pomme claims located in Québec, Canada in February 2023. The Pomme Project is located adjacent to the world-class Montviel
REE-Nb deposit (owned by Geomega), that has a defined total indicated and inferred resource of 266 million tonnes (Mt) @
1.45% TREO & 0.14% Nb2O5.
The diamond drilling program previously completed on the Pomme Project has met the current exploration expenditure
requirements of the option agreement with Geomega. Statutory reports on the drilling and associated activities were completed
and submitted to the Quebec Ministère des Ressources naturelles et des Forêts (MRNF) during the reporting period.
The Company is currently assessing strategic options for this project.
For the quarter ending 30 June 2024
7
Figure 8. Pomme REE-Nb Project location.
Montviel South Project
Québec, Canada
The Montviel South REE-Nb project is located 10km south of MTM’s Pomme REE-Nb project. The area is
prospective for discovery of additional carbonatite-hosted mineralisation, though is at an earlier stage of
development than Pomme.
MTM entered into an option agreement with Geomega to acquire a 100% interest in the Montviel South claims in August 2023.
The project area is also located adjacent to the Montviel REE-Nb deposit. During the quarter, the Company advised that it
would not proceed with the payment of the second tranche of Shares due and would withdraw from the Farm-in arrangement.
The Company does not retain any ownership in these claims following withdrawal from the Farm-in.
Mukinbudin Niobium & Rare Earths Project
Western Australia, Australia
The Mukinbudin Nb-REE Project comprises two exploration licences (E70/6048 and E70/6359) located 250km
northeast of Perth in the South West Mineral Field of Western Australia.
The Company did not undertake any activities on the project during the quarter. The Company is currently assessing strategic
options for this project.
For the quarter ending 30 June 2024
8
East Laverton Rare Earths Project
Western Australia, Australia
The East Laverton Project covers 1,900km2 in the prolific Eastern Goldfields region of Western Australia and hosts
an emerging district-scale REE mineralisation opportunity at Point Kidman in the north of the project as well as gold
and base metals anomalies at Seahorse in the south.
During the quarter, drill hole rehab was carried out at the East Laverton project and this work is ongoing. The Company is
currently assessing strategic options for this project and reviewing historical data with regards to the previous gold discoveries.
Mt Monger Project
Western Australia, Australia
The Mt Monger Gold Project is centred approximately 45km east-northeast of Kambalda and 70km to the southeast
of Kalgoorlie-Boulder, within the Goldfields Region of Western Australia. The project comprises seven granted
exploration licences and three granted prospecting licences, covering an area of about 80km2.
No fieldwork was completed at the Mt Monger project during the quarter. The Company is currently assessing strategic
options for this project.
Corporate
Cash Position
At 30 September 2024, cash at bank totalled ~$0.53 million. During the quarter $612,000 was spent on Operating Activities
which included $307,000 relating to staff costs. $1,355,000 was spent on Investing Activities of which included $1,217,000
of expenditure on the FJH project. $619,000 was spent on engineering costs associated with testing of metal extraction from
various feed stock and design work for the FJH demonstration plant and $513,000 to Rice University for license and research
fees relating to the FJH license acquisition.
Equity
As at 30 September 2024, the Company had on issue 281,106,850 Ordinary Shares, 153,893,291 quoted options (MTMO)
(Exercise price - $0.25, Expiry date - 26 Nov 2024), 9,500,000 unlisted options and 37,500,000 unlisted performance rights.
In October 2024, the Company finalised a placement to raise $8 million (before costs) at a price of $0.065 per share. Tranche
1 which raised $4.2 million (before costs) was completed on 21 October 2024 with an allotment of 64.72 million shares.
Management Change
Michael Walshe was appointed as Chief Executive Officer of the Company effective from 9 August 2024. Mr Walshe has over
15 years of international experience in engineering, operations, technology commercialisation, and project development roles
across the minerals, chemicals, and renewable energy sectors with substantial expertise in the design and scale-up of heat
For the quarter ending 30 June 2024
9
transfer equipment. He brings over a decade of experience with industry leader Metso Outotec, in various technical and senior
management roles, covering all major commodities including lithium, rare earths, gold, and base metals. Mr Walshe has
extensive expertise in process design, metallurgical flowsheet development, and structuring project finance packages for junior
miners via export credit funding. Before joining MTM, he served as CEO of the ASX listed mineral explorer Voltaic Strategic
Resources Ltd from October 2022 until assuming his current role.
Mr Walshe holds a Bachelor of Chemical and Process Engineering (Hons.) from University College Dublin, Ireland, and a Master
of Business Administration (Finance) from the Australian Institute of Business (AIB). He is a chartered professional engineer
with both Engineers Australia and the Institution of Chemical Engineers (IChemE) and is a member of the Australasian Institute
of Mining and Metallurgy (AusIMM).
Lachlan Reynolds resigned as CEO on 2 July 2024 after serving as CEO and MD since the Company was founded in July 2021.
ASX Additional Information
Exploration Activities ASX Listing Rule 5.3.1:
Total exploration expenditure for the June 2024 quarter was $104k (refer Item 2.1(d) of the accompanying Appendix 5B),
which predominantly comprised of tenement costs in Australia ($74k) and exploration activities in Canada ($30k).
Mine Production Activities ASX Listing Rule 5.3.2:
There were no mine production or development activities conducted during the Quarter.
Payments to Related Parties ASX Listing Rule 5.3.5:
The aggregate amount of payments to related parties and their associates for the June quarter of $155k (refer Item 6 of the
accompanying Appendix 5B) related to director fees, consulting services and salaries ($113k) and office and storage rental and
administration services ($42k).
For the quarter ending 30 June 2024
10
Tenement Interests
Project location
Tenement
Reference
Status
Equity at
31 March 2024
Equity at
30 June 2024
E 25/525
Live
100%
100%
E 25/531
Live
100%
100%
E 25/532
Live
100%
100%
E 25/536
Live
100%
100%
E 25/562
Live
80%
80%
E 25/565
Live
100%
100%
E 25/603
Live
100%
100%
P 25/2489
Live
100%
100%
P 25/2490
Live
100%
100%
P 25/2568
Dead
80%
0%
E 38/3302
Live
100%
100%
E 38/34621
Live
51%
51%
E 38/3466
1
Live
51%
51%
E 38/34991
Live
51%
51%
E 38/3506
Live
100%
100%
E 38/3507
Live
100%
100%
E 38/3510
Live
100%
100%
E 38/3511
Live
100%
100%
E 38/3765
Live
100%
100%
E 74/723
Dead
100%
0%
E 74/725
Dead
-
0%
E 74/726
Dead
100%
0%
Surrendered
E 74/727
Dead
100%
0%
Surrendered
E 80/5858
Live
100%
100%
E 80/5874
Live
100%
100%
E 80/5875
Live
100%
100%
E 70/6048
Live
100%
100%
E 70/6359
Live
100%
100%
Changes during the quarter
AUSTRALIA
Western Australia
Mt Monger Project
East Laverton Project
Ravensthorpe Project
West Arunta Project
Mukinbudin Project
Surrendered
Surrendered
1
Tevel Pty Ltd (Tevel) is the registered holder of E38/3462, E38/3466 and E38/3499; MTM has entered into a Farm-In agreement
with Tevel to earn up to a 75% interest in the tenements.
Project location
Claim Title #
Status
Equity at
31 March 2024
Equity at
30 June 2024
CDC121
CDC122
CDC1005980
CDC1005982
CDC1005983
CDC2234423
Live
Live
Live
Live
Live
Live
-
-
CANADA
Quebec
Pomme Project
Changes during the quarter
For the quarter ending 30 June 2024
Project location
11
Claim Title #
Status
CDC2234424
CDC2234425
CDC2234426
CDC2234427
CDC2234428
CDC2234429
CDC2234430
CDC2234431
CDC2234432
CDC2234433
CDC2240300
CDC2240301
CDC2240302
CDC2240303
CDC2240304
CDC2240305
CDC2240306
CDC2240307
CDC2240309
CDC2240310
CDC2240311
CDC2240312
CDC2240313
CDC2458316
CDC2458327
CDC2458328
CDC2458329
CDC2458330
CDC2458331
CDC2458332
CDC2458333
CDC2458334
CDC2458345
CDC2458346
CDC2458349
CDC2522460
CDC2598360
CDC2754413
CDC2754414
CDC2757444
CDC2757445
CDC2757446
CDC2784081
CDC2784082
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Equity at
31 March 2024
100%
100%
100%
100%
100%
100%
100%
Equity at
30 June 2024
100%
100%
100%
100%
100%
100%
100%
Changes during the quarter
Geomega Resources Inc is the registered holder of the Pomme claims that are not held by MTM. MTM has entered into
option agreements with Geomega to earn up to a 100% interest in these claims.
For the quarter ending 30 June 2024
12
Company Profile
MTM Critical Metals Limited is a dynamic company with a dual focus on mineral exploration and metal recovery technology
development. We hold exploration assets prospective for niobium (Nb), rare earth elements (REE), and gold, strategically located
in Western Australia and Québec. Additionally, we possess exclusive licensing rights to the innovative Flash Joule Heating
technology, a cutting-edge metal recovery and mineral processing method developed by esteemed researchers at Rice University,
USA.
Flash Joule Heating (FJH) is an advanced electrothermal process that enhances metal recovery and mineral processing compared
to traditional methods. By rapidly heating materials in a controlled atmosphere, FJH efficiently extracts metals like lithium from
spodumene, gallium from scrap, and gold from e-waste, among others. This technology has the potential to revolutionise metal
recovery by reducing energy consumption, reagent use, and waste, offering a more economical and environmentally friendly
alternative.
MTM’s West Arunta Nb-REE exploration assets are situated in one of Australia’s premier exploration hotspots, where over $60
million has been invested by ASX-listed companies such as WA1 Resources, Encounter Resources, Rio Tinto (in JV with Tali
Resources), and IGO Limited. MTM also holds tenements in other key mineral regions across Western Australia, including the
Mukinbudin Nb-REE Project, East Laverton Gold & Base Metals Project, and Mt Monger Gold Project. In Québec, the Pomme
Project is a highly promising carbonatite intrusion rich in REE and niobium, located near the world-class Montviel deposit.
Important Notices
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents information compiled by Mr Lachlan Reynolds.
Mr Reynolds was the Chief Executive Officer of MTM Critical Metals Limited and is a member of both the Australasian Institute of Mining and Metallurgy
and the Australasian Institute of Geoscientists. Mr Reynolds has sufficient experience of relevance to the styles of mineralisation and types of deposits
under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves
Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reynolds consents to the inclusion
in this announcement of the matters based on information in the form and context in which they appear.
Previous Disclosure
The information in this announcement is based on the following MTM Critical Metals Limited (formerly Mt Monger Resources Limited) ASX
announcements, which are all available from the MTM Critical Metals Limited website www.mtmcriticalmetals.com.au and the ASX website
www.asx.com.au.
The following announcements were lodged on the ASX Market Announcements Platform during the quarter:
Date
Description
02/07/2024
Resignation of CEO
03/07/2024
Presentation Deck & Investor Webinar
09/07/2024
Positive Lithium Extraction Results from Flash Joule Heating
30/07/2024
Change in Directors Interest – J Hannaford
31/07/2024
Quarterly Report and Appendix 5B
02/08/2024
Release of shares from escrow
09/08/2024
Appointment of new CEO
13/08/2024
Addition of Chlorination enhancement to FJH Licence
13/08/2024
Proposed issue of securities
21/08/2024
Flash Joule Heating converts Spodumene to Lithium Chloride
22/08/2024
Investor webinar – Flash Joule Heating
27/08/2024
Gallium Recovered from Semiconductor Waste Using FJH Tech
For the quarter ending 30 June 2024
13
Date
Description
06/09/2024
MTM Advances FJH Commercialisation with 1 TPD Demo Plant
12/09/2024
High Gold Recovery from E-Waste using FJH Technology
18/09/2024
Further Advances in Lithium Refining with Flash Joule Heat
24/09/2024
Release of securities from escrow
25/09/2024
High Silver & Copper Recovery from e-Waste using FJH
30/09/2024
Full year statutory accounts
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX
announcements and that all material assumptions and technical parameters underpinning the relevant ASX announcements continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are represented have not been
materially modified from the original ASX announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective judgment and analysis and
assumption. MTM Critical Metals does not accept any liability in relation to any such matters, or to inform the Recipient of any matter arising or coming
to the company’s notice after the date of this document which may affect any matter referred to herein. Any opinions expressed in this material are
subject to change without notice, including as a result of using different assumptions and criteria. This document may contain forward-looking
statements. Forward-looking statements are often, but not always, identified by the use of words such as “seek”, “anticipate”, “believe”, “plan”,
“expect”, and “intend” and statements than an event or result “may”, “will”, “should”, “could”, or “might” occur or be achieved and other similar
expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual
results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property
interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon
estimates and opinions at the date the statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements
for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. The Recipient
should not place undue reliance upon forward-looking statements. Any estimates or projections as to events that may occur in the future (including
projections of revenue, expense, net income and performance) are based upon the best judgment of MTM Critical Metals from information available as
of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the
projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or
future. MTM Critical Metals, its affiliates, directors, employees and/or agents expressly disclaim any and all liability relating or resulting from the use
of all or any part of this document or any of the information contained herein.
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Michael Walshe
Chief Executive Officer
MTM Critical Metals Ltd
+61 (0)8 6391 0112
info@mtmcriticalmetals.com.au
Media Contact
David Tasker
Chapter One Advisors
+61 (0)433 112 936
dtasker@chapteroneadvisors.com.au
Appendix 5B
Oil and Gas Exploration Entity Quarterly Report
Rule 5.5
ACN 645 885 463
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
MTM CRITICAL METALS LIMITED
ABN
Quarter ended (“current quarter”)
27 645 885 463
30 September 2024
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
A$’000
Year to date
(3 months)
$’000
-
-
-
-
(a)
exploration & evaluation (if expensed)
(b)
development
(20)
(20)
(c)
production
-
-
(d)
staff costs
(307)
(307)
(e)
administration and corporate costs
(290)
(290)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
5
5
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
1
1
1.9
Net cash from / (used in) operating activities
(612)
(612)
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
2.2
Current quarter
A$’000
Year to date
(3 months)
$’000
(a)
entities
-
-
(b)
tenements (see item 10)
-
-
(c)
property, plant and equipment
(34)
(34)
(d)
exploration & evaluation (if capitalised)
(104)
(104)
(e)
investments
-
-
(f)
other non-current assets
(1,217)
(1,217)
Proceeds from the disposal of:
(a)
entities
-
-
(b)
tenements (see item 10)
-
-
(c)
property, plant and equipment
-
-
(d)
investments
-
-
(e)
other non-curren