MTM expands REE acreage in Canada
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX: MTM
3 October 2023
New deal to expand MTM’s rare earths acreage in Canada.
Montviel South Project 10km south of Pomme Project.
Highlights:
• Option secured to acquire 100% interest in Montviel South REE-Nb project claims located in
Québec, Canada.
• Located only 10km from the Pomme REE-Nb project where MTM has recently completed a maiden
diamond drilling program.
• Adjacent to the world-class Montviel carbonatite REE-Nb deposit which hosts a Total Resource of
266 Mt @ 1.46% TREO & 0.14% Nb2O5.
• Highly anomalous REEs in rock outcrops and glacial boulders identified from previous exploration
activities - fieldwork program currently in progress.
MTM Critical Metals Limited (ASX:MTM) has bolstered its portfolio of highly prospective rare
earth elements/niobium (REE-Nb) targets in southern Quebec, Canada, entering into a second
binding option agreement with Geomega Resources Inc. (TSX.V:GMA) to acquire a 100%
interest in the Montviel South Project.
The new project is located 10km south of MTM’s Pomme Project where recent maiden diamond
drilling confirmed the nearly continuous presence of carbonatite-hosted REE and Nb mineralisation1.
Furthermore, the Montviel South claims are adjacent to the Montviel REE-Nb deposit where Geomega
has delineated total indicated and inferred resource of 266 Mt @ 1.45% TREO & 0.14% Nb2O5.
MTM Managing Director, Mr Lachlan Reynolds said the Company’s new deal with Geomega
represented a phenomenal strategic opportunity.
“Like our Pomme Project, the Montviel South Project area contains a number of mineralised
occurrences that have not been followed-up or tested with drilling and shares the great advantage of
being adjacent to the significant Montviel deposit,” Mr Reynolds said.
“We’re building a considerable land package in what we’re confident is a highly prospective area for
high value light rare earths and niobium. The combined Pomme / Montviel South acreage has the
potential for a globally significant REE carbonatite project. Carbonatites are the major source of high
grade hard rock REE’s being mined globally and this project has both the scale potential and location
to be highly strategic and sought after.”
1
Refer ASX release dated 28 September: Strong assay results from Pomme Drilling
@MTM Critical
@MTM Critical Metals
Figure 1: Location map of the Montviel South project in Quebec, Canada.
Montviel South Project
The Montviel South claims are part of the Montviel claim block held by Geomega in southern Québec,
Canada (Figure 1). The area is easily and directly accessible via national highways and wellmaintained logging roads. Exploration services and support are readily available from established
mining towns about 200km to the south in the Abitibi gold belt. MTM already has an established field
camp to support the work program at the nearby Pomme REE-Nb project.
Montviel South Project Geology
The Montviel South claims include the southwest part of the Montviel Carbonatite Complex (MCC) and
the surrounding deformed and metamorphosed mafic to intermediate volcanic rocks of the northern
Abitibi Province (Figure 2). The MCC hosts the Montviel REE-Nb deposit and is an alkali intrusive
complex comprised of carbonatite and a suite of mafic to ultramafic intrusive rocks. The surrounding
volcanic rocks are comprised of tonalite, intercalated with mafic amphibolites. This sequence is
prospective for gold and volcanogenic massive sulphide (VMS) style base metal deposits.
2
Figure 2: Simplified interpreted geology map of the Pomme Project and Montviel Deposit (SIGEOM).
3
Previous Exploration
The Montviel South area has limited previous exploration (see Figure 3). In 1993, Diabex Inc.
completed a drill hole within the current claim area to test a target for diamonds (Corbeil & Villeneuve,
1994). Beneath approximately 20m of glacial till cover, the drill hole intersected magnetic ijolite (an
alkali intrusive rock associated with carbonatite). The hole was not assayed for REE. A decade later in
2005, Niogold collected a rock chip sample from the area which was highly anomalous in rare earth
elements, grading 1,540ppm cerium, 610ppm lanthanum and 535ppm neodymium (Hendrickson,
2006).
Subsequent prospecting by Geomega in 2016 as part of the Montviel Project identified further
outcrops and boulders of carbonatite in the area that are anomalous in rare earth elements and
phosphorus (Lalonde & Cayer, 2017). Broad-spaced till samples also highlighted local gold anomalies,
including a sample of 175ppb Au. None of these surficial results have been followed-up, nor has any
further drilling been completed. The Company considers the area prospective for additional REE-Nb
mineralised carbonatite deposits which have not yet been defined by past exploration programs.
Figure 3: Previous exploration results from the Montviel South claims.
Montviel South Work Program
A work program consisting of geological mapping, rock-chip sampling (from outcrop and boulders) and
soil sampling has been implemented over the Montviel South claim area. It is anticipated that this work
4
will be completed during the current summer field season and will satisfy the first-year expenditure
commitments under the Agreement (see details below).
Once results for the preliminary work are received, MTM will assess drilling targets and to develop a
plan for an initial drilling program. Drill holes will be designed to discover new areas of prospective
carbonatite-hosted REE-Nb mineralisation.
Option Agreement
MTM has executed a binding option agreement with Geomega to acquire a 100% interest in the
Montviel South claims held by Geomega (MTM-GMA Option). Geomega is a listed Canadian company
(TSX.V: GMA) (OTC: GOMRF) developing clean technologies for the mining, refining and recycling of
rare earth elements and other critical materials (see www.geomega.ca for more information).
MTM will be required to satisfy aggregate consideration of CAD $150,000 in cash and AUD $150,000
in shares in three tranches in order to exercise the Option (Table 1). At settlement, the Company will
pay an amount of CAD $25,000 and issue AUD $25,000 of shares. Furthermore, the Company will
have a CAD $700,000 exploration expenditure commitment over three years.
The claims are subject to a net smelter royalty (NSR) payable on all minerals obtained from the land
subject to the claims (Appendix I). Geomega retains a NSR of 2% on all minerals obtained from the
Project, 1% of which may be re-purchased by MTM for AUD $1,000,000.
Table 1: Summary of Consideration for the Montviel South Project Claims
Date
Cash
(CAD)
MTM Shares (AUD)
Upon Settlement
$25,000
$25,000
12 month anniversary
$50,000
$50,000
$50,000
24 month anniversary
$75,000
$75,000
$200,000
36 month anniversary
TOTAL:
Required Exploration
Expenditure (CAD)
$450,000
$150,000
$150,000
$700,000
Payment terms of the MTM-GMA Option Agreement:
i.
Payment of an initial option fee of CAD $25,000 and AUD $25,000 MTM shares (based on a
10-day VWAP) subject to shareholder approval or, failing shareholder approval being granted,
the cash equivalent.
ii.
On the first anniversary of exercise of the MTM-GMA Option: (1) CAD $50,000 cash; and (2)
AUD $50,000 MTM Shares (based on a 10-day VWAP) subject to shareholder approval or,
failing shareholder approval being granted, the cash equivalent.
iii.
On the second anniversary of exercise of the MTM-GMA Option: (1) CAD $75,000 cash; and
(2) AUD $75,000 MTM Shares (based on a 10-day VWAP) subject to shareholder approval or,
failing shareholder approval being granted, the cash equivalent.
iv.
For the duration of the term of the MTM-GMA Option, MTM must satisfy the following annual
expenditure commitments on the Project to acquire title to the Project (collectively, Expenditure
5
Commitments): (1) CAD $50,000 in the first year; (2) CAD $200,000 in the second year; and
(3) CAD $450,000 in the third year.
Other material terms of the MTM-GMA Option Agreement:
All conditions precedent to the MTM-GMA Option Agreement have been satisfied. The other material
terms of the Agreement are as follows:
i.
MTM grants Geomega a right of first refusal for all contractual work undertaken on the Project
subject to rates charged for work being at or below the industry standard for the region and
availability of personnel and equipment to complete the work required;
ii.
MTM will be provided with the right to access and travel over the Project, undertake eligible
activities thereon and take samples in order to satisfy the Expenditure Commitments (and will
be entitled to determine the nature, location, timing and conduct of all eligible activities at its
sole discretion); and
iii.
The agreement otherwise contains terms and conditions considered standard for an agreement
of this nature.
References
Belzile Solutions Inc. and G Mining Services Inc., 2015. NI 43-101 Technical Report, Montviel Rare
Earth Project, Québec, Canada. Unpublished report prepared for GéoMégA Resources inc., Effective
Date June 15, 2015.
Corbeil, R. and Villeneuve, D., 1994. Rapport Sur Les Travaux d’Exploration Effectures Sur
L’Ensemble Des Properties Du Projet Diamant II, Regions De Miquelon Et De Matagami, Québec.
Unpublished report prepared by Diabex inc. Report number GM 52874, Énergie et Ressources
naturelles Quebec.
Hendrickson, G.N., 2006. Report on the Geochemical Orientation Surveys, Geological Mapping,
Prospecting and Sampling Program on the Property of Niogold Mining Corporation in Montviel
Township, Quebec. Unpublished report prepared by Niogold Mining Corporation. Report number GM
62424, Énergie et Ressources naturelles Quebec.
Lalonde, P-L. and Cayer, A., 2017. Rapport Des Travaux 2016 Propriété Montviel. Unpublished report
prepared by GéoMéga Ressources inc. Report number GM 70410, Énergie et Ressources naturelles
Quebec.
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Lachlan Reynolds
Managing Director
MTM Critical Metals Limited
Phone: +61 (0)8 6391 0112
Email: lachlan.reynolds@mtmmetals.com.au
Gareth Quinn
Investor Relations
Republic PR
Mobile: 0417 711 108
Email: gareth@republicpr.com.au
6
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for rare earth elements (REE), gold,
lithium, nickel, and base metals in the Goldfields and Ravensthorpe districts of Western Australia and in the Abitibi region of
the Province of Québec. The Company holds over 4,500km2 of tenements in three prolific and highly prospective mineral
regions in Western Australia and has an option to acquire, through an earn-in arrangement, a 100% interest in 2,400 ha of
exploration rights in Québec, Canada. The East Laverton Projects is made up of a regionally extensive package of
underexplored tenements prospective for REE, gold and base metals. The Mt Monger Gold Project comprises an area
containing known gold deposits and occurrences in the Mt Monger area, located ~70km SE of Kalgoorlie and immediately
adjacent to the Randalls gold mill operated by Silver Lake Resources Limited. The Ravensthorpe Project contains a package
of tenements in the southern part of Western Australia between Esperance and Bremer Bay which are prospective for a
range of minerals including REE, lithium, nickel and graphite. The Pomme Project in Québec is a known carbonatite intrusion
that is enriched in REE and niobium and is considered to be an extremely prospective exploration target adjacent to a world
class REE resource (Montviel deposit). Priority drilling targets have been identified in all project areas and the Company is
well funded to undertake effective exploration programs. The Company has an experienced Board and management team
which is focused on discovery to increase value for Shareholders.
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents information
compiled by Mr Lachlan Reynolds. Mr Reynolds is the Managing Director of Mt Monger Resources Limited and is a member
of both the Australasian Institute of Mining and Metallurgy and the Australasian Institute of Geoscientists. Mr Reynolds has
sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the
activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee
(JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reynolds
consents to the inclusion in this announcement of the matters based on information in the form and context in which they
appear.
Previous Disclosure
The information in this announcement is based on the following MTM Critical Metals Limited (formerly Mt Monger Resources
Limited) ASX announcements, which are all available from the MTM Critical Metals Limited website
www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
•
28 September 2023, “High grade total rare earth element oxide (TREO) drilling results returned over significant widths
at the Pomme REE-Nb Project, Quebec”
The Company confirms that it is not aware of any new information or data that materially affects the information included in
the original ASX announcements and that all material assumptions and technical parameters underpinning the relevant ASX
announcements continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are represented have not been materially modified from the original ASX
announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective
judgment and analysis and assumption. MTM Critical Metals does not accept any liability in relation to any such matters, or to
inform the Recipient of any matter arising or coming to the company’s notice after the date of this document which may affect
any matter referred to herein. Any opinions expressed in this material are subject to change without notice, including as a
result of using different assumptions and criteria. This document may contain forward-looking statements. Forward-looking
statements are often, but not always, identified by the use of words such as “seek”, “anticipate”, “believe”, “plan”, “expect”,
and “intend” and statements than an event or result “may”, “will”, “should”, “could”, or “might” occur or be achieved and other
similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other
factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors
include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign
and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the
statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements for events or
circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. The
Recipient should not place undue reliance upon forward-looking statements. Any estimates or projections as to events that
may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best
judgment of MTM Critical Metals from information available as of the date of this document. There is no guarantee that any of
these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be
material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. MTM
Critical Metals, its affiliates, directors, employees and/or agents expressly disclaim any and all liability relating or resulting
from the use of all or any part of this document or any of the information contained herein.
7
About The Montviel REE-Nb Deposit
Geomega owns 100% of the Montviel carbonatite REE-Nb deposit. Montviel is described by Geomega
as both the largest bastnaesite REE resource in North America and also as the most accessible
undeveloped REE project in Canada. The Montviel deposit is not part of the option agreement to
acquire the Montviel South Project.
The Montviel deposit has an estimated total Indicated and Inferred resource of 267 Mt @ 1.46%
TREO and 1,439ppm Nb2O5 (Table 2) (Belzile Solutions Inc. and G Mining Services Inc., 2015). The
deposit occurs as a REE-Nb mineralised ferro-carbonatite over a length of 900m (NE-SW), a width of
650m (NW-SE) and extends to 750m depth below surface. Within the resource is also a zone of
elevated dysprosium (Dy) grades.
Since its discovery in 2010 and subsequent resource delineation, Geomega have undertaken
extensive metallurgical test work on the Montviel deposit. The work demonstrated that effective
recovery of REE and Nb could be achieved using a combination of flotation and hydrometallurgy
processes. Recovery of a phosphate product is also feasible.
Table 2: Montviel Deposit Resource Estimate
Category
Resource
Tonnes
(Mt)
TREO
(%)
Grade
(ppm)
Pr2O3
Contained
Metal
(t ‘000)
Grade
(ppm)
Nd203
Contained
Metal
(t ‘000)
Nb2O5
Grade Contained
(ppm)
Metal
(t ‘000)
Indicated
82.4
1.51
766
63.2
2,452
202.0
1,715
141.3
Inferred
184.2
1.43
746
137.4
2,433
448.3
1,315
242.3
Total
266.6
1.46
752
200.5
2,439
650.2
1,439
383.5
TREO (Total Rare Earth Oxide) grade includes Ce2O3, Dy2O3, Er2O3, Eu2O3, Gd2O3, Ho2O3, La2O3, Lu2O3, Nd2O3, Pr2O3,
Sm2O3, Tb2O3, Tm2O3, Yb2O3 and Y2O3.
Note that discrepancies may occur due to rounding of values.
Mineral resources are estimated and reported in compliance with NI 43-101. Mineral resources are not mineral reserves and
do not have demonstrated economic viability.
Investors are cautioned that the Project has no reported mineral resources or ore reserves and that the proximity of the Project
to Geomega’s Montviel deposit and any geological similarities with that deposit are no guarantee that the Project will be
prospective for an economic reserve.
8
APPENDIX I – MONTVIEL SOUTH PROJECT MINERAL CLAIMS
Title #
Issue Date
Expiry Date
Area
(hectares)
Owner
%
CDC112
18/07/2003
17/07/2024
55.58
100
CDC94141
15/09/2005
14/09/2024
55.58
100
CDC1105928
02/12/2002
01/12/2023
55.58
100
CDC2458312
17/08/2016
16/08/2023*
55.59
100
CDC2458313
17/08/2016
16/08/2023*
55.59
100
CDC2458317
17/08/2016
16/08/2023*
55.59
100
CDC2458318
17/08/2016
16/08/2023*
55.59
100
CDC2458319
17/08/2016
16/08/2023*
55.59
100
CDC2458320
17/08/2016
16/08/2023*
55.59
100
CDC2458321
17/08/2016
16/08/2023*
55.58
100
CDC2783265
1/08/2023
31/07/2026
55.60
100
CDC2783266
1/08/2023
31/07/2026
55.60
100
CDC2783267
1/08/2023
31/07/2026
55.60
100
CDC2783268
1/08/2023
31/07/2026
55.60
100
CDC2783269
1/08/2023
31/07/2026
55.60
100
CDC2783270
1/08/2023
31/07/2026
55.60
100
CDC2783271
1/08/2023
31/07/2026
55.60
100
CDC2783272
1/08/2023
31/07/2026
55.60
100
CDC2783273
1/08/2023
31/07/2026
55.59
100
CDC2783274
1/08/2023
31/07/2026
55.59
100
Name of
Owner
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Ressources
Géoméga inc.
Existing
Royalty
(Osisko)
Vendor
Royalty
(Geomega)
2%
1%
2%
1%
2%
1%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
-
2%
* Renewal application submitted
9
APPENDIX II - JORC Compliance Tables
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Sampling techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Commentary
• Rock chip (grab) sampling of outcrop and glacial boulders completed.
• Till sampling was undertaken by hand using a shovel or using a mechanical
auger. The hand-collected samples were sampled at depths ranging from 30 to
120 cm and those taken by the mechanical auger up to 5 m deep.
• Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
Drilling techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
• Not applicable, no drilling results reported.
Drill sample recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Not applicable, no drilling results reported.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
10
Criteria
Logging
JORC Code Explanation
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Commentary
• Not applicable, no drilling results reported.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• Standard sample preparation techniques for rock chip samples including
crushing and pulverisation.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Quality of assay data
and laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Niogold rock chip samples were analysed by ALS Chemex for gold using a fire
assay method (Au-AA23); a multi-element assay technique (ME-MS61)
including some REE using multi-acid (4 acid) digestion with an ICP-MS or ICPAES finish. Samples were selectively re-assayed for a full REE suite using
assay technique ME-MS82.
• Geomega rock chip samples were assayed by ALS Minerals for gold using a
fire assay method (Au-AA25) and a multi-element assay technique (ME-MS41)
including some REE using aqua regia digestion with an ICP-MS finish.
• Geomega till samples were assayed by ALS Minerals for gold using a fire assay
method (Au-AA25) and a multi-element assay technique (ME-MS41) including
some REE using aqua regia digestion with an ICP-MS finish.
11
Criteria
JORC Code Explanation
Commentary
• The assay techniques are considered appropriate and are industry best
standard.
• The techniques are considered to be a near total digest, only the most resistive
minerals are only partially dissolved.
• Information is not available regarding Niogold quality control procedures but this
is not regarded as material at this stage of exploration.
• Geomega implemented a quality control procedure comprising suitable
standards and blanks.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• Not applicable, no intersections reported.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system used.
Data spacing and
distribution
• Sample locations have been surveyed using handheld GPS with an accuracy of
approximately ±3 metres.
• The grid system used for is North American Datum 1983 (NAD 83), UTM Zone
18.
• Quality and adequacy of topographic control.
• Topographic control is based on existing topographic maps and is not well
constrained but this is not considered material at the current stage of
exploration.
• Data spacing for reporting of Exploration Results.
• Wide-spaced surface sample data spacing is not suitable to establish geological
and grade continuity.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
12
Criteria
JORC Code Explanation
Orientation of data in
relation to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
Commentary
• Not applicable at current stage of exploration.
• If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
Sample security
• The measures taken to ensure sample security.
• Not applicable, no new sampling completed.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews completed, not relevant at current stage of exploration.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The tenements relevant to this announcement are 20 claims located in Québec,
Canada.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• The claims are held 100% by Geomega Resources Inc.
• A net smelter royalty of 2% is payable to Osisko Gold Royalties on several of
the Clims.
• MTM Critical Metals Ltd has executed an option agreement to acquire a 100%
interest in the claims subject to cash and share based payments and exploration
expenditure requirements.
• The tenements are located on Category II Lands of the Cree First Nation of
Waswanipi. Mining, exploration and geoscientific works must be carried out in
such a manner as to avoid unreasonable conflict with the rights of the First
Nation people.
• The tenements are secure and there are no known impediments to obtaining a
licence to operate in the area.
13
Criteria
Exploration done by
other parties
JORC Code Explanation
• Acknowledgment and appraisal of exploration by other parties.
Commentary
• Previous exploration of the project area is limited.
• In 1993, Diabex inc. completed a drill hole within the current claim area to test
a target for diamonds. The hole was not assayed for REE.
• In 2005, Niogold collected a rock chip sample from the area which was highly
anomalous in rare earth elements.
• Subsequent prospecting by Geomega Ressources in 2016 as part of the
Montviel project identified further outcrops and boulders of carbonatite in the
area that are anomalous in rare earth elements and phosphorus. Broad-spaced
till samples also highlighted local gold anomalies.
Geology
• Deposit type, geological setting and
Share your feedback