Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
For the quarter ending 31 December 2023
1
Quarterly Report
For the quarter ending
31 December 2023
mtmcriticalmetals.com
MTM Critical Minerals Ltd
ABN 27 645 885 463
ASX Code: MTM
Date Released: 31 January 2024
MTM Critical Metals Limited is
focused on developing its niobium and
rare earth elements projects while
advancing its Flash Joule Heating
mineral processing and recycling
technology.
Highlights
•
Acquired West Arunta Nb-REE Project, prospective for
mineralised carbonatites adjacent to WA1 in Western
Australia.
Deal includes acquisition of the Mukinbudin Nb-REE Project
in WA’s South West Mineral Field.
Also acquired an option to licence Flash Joule Heating
recycling and processing technology.
•
Reported new broad zones of rare earth elements (REE)
and niobium (Nb) mineralisation and further total rare earth
oxides (TREO) intercepts reported at Pomme REE-Nb
Project, Québec
o POM-23-13: 330m @ 0.34% TREO & 0.02% Nb2O5
o POM-23-11: 468.35m @ 0.29% TREO & 0.06% Nb2O5
including 74.75m @ 0.47% TREO & 0.06% Nb2O5.
MTM expands REE acreage in Canada.
Encouraging beneficiation results received for East
Laverton REE clays project.
For the quarter ending 31 December 2023
2
Flash Metals Pty Ltd acquisition
Québec, Canada
In December, MTM announced it had entered into a binding agreement to acquire 100% of Flash Metals Pty Ltd, the
beneficial owner of three key exploration licenses prospective for niobium (Nb) and rare earth elements (REE) in the West
Arunta region of Western Australia.
Covering around 140km2, the three granted West Arunta Nb-REE licences (E80/5858, E80/5874 and E80/5875) are located immediately
adjacent to tenements held by WA1 Resources Limited (ASX:WA1, $455m mkt. cap1.) and Encounter Resources Limited (ASX:ENR,
$110m mkt. cap1.), where niobium-REE mineralised carbonatites have recently been discovered:
WA1:
P2 Carbonatite Discovery: 54m @ 0.62% Nb2O5 ending in 2m @ 1.22% Nb2O5
Luni Carbonatite Discovery: 31m @ 3.5% Nb2O5 incl. 13m @ 5.0% Nb2O5
24m @ 2.1% Nb2O5 incl. 10m @ 4.0% Nb2O5
21m @ 2.2% Nb2O5 incl. 12m @ 3.2% Nb2O5
ENR:
Crean Carbonatite Discovery: 282m @ 0.54% Nb2O5 & 0.17% TREO from 64m
Hurley Carbonatite Target:
Large scale mineralised carbonatite, open at depth
The West Arunta region is one of Australia’s critical metal exploration hotspots with over $60m in exploration expenditure collectively
invested in the district by a number of ASX companies including Rio Tinto Limited (JV with Tali Resources Pty Ltd) (ASX:RIO), CGN
Resources Limited (ASX:CGR), and IGO Limited (ASX:IGO).
The Flash transaction also includes the acquisition of the Mukinbudin Nb-REE Project, comprising two exploration licences, (E70/6048
and E70/6359) located 250km northeast of Perth in the South West Mineral Field of Western Australia. REE mineralisation has been
locally reported by Codrus Minerals and Caprice Resources.
As part of the Flash Metals transaction, MTM has also acquired an option to licence a processing and recycling technology for REE and
other critical minerals known as Flash Joule Heating (FJH), which has been developed by researchers at Rice University in the USA.
Deal Overview
MTM has agreed to pay Flash:
a)
A non-refundable $10,000 fee (which has previously been paid).
b)
100 million fully paid ordinary shares of MTM and 50 million MTMO listed options;
c)
37.5m performance rights and 15m unquoted options with an exercise price of $0.25 and an expiry date of 30 December 2026
vesting equally across three milestones:
1
1.
Drilling results of >10m at > 1,000ppm REE and/or >0.5% Nb2O5;
2.
JORC inferred resource of > 10MT at > 1,000ppm REE and/or >0.5% Nb2O5
3.
JORC inferred resource of >20MT at > 1,000 ppm REE and/or >0.5% Nb2O5
As quoted by ASX on Thursday 18 January 2024 asx.com.au
For the quarter ending 31 December 2023
3
West Arunta Niobium & Rare Earths Project
Western Australia, Australia
The West Arunta Nb-REE Project comprises three exploration licences totalling 140km2 immediately adjacent to tenements
held by WA1 Resources Ltd (ASX:WA1) near the Luni Carbonatite Discovery and the P2 Carbonatite Discovery; and
Encounter Resources Ltd (ASX:ENR) where Nb-REE mineralised carbonatites have recently been discovered.
Historical exploration within the West Arunta tenement areas is very limited. There has been no drilling on the ground, nor have any
systematic geochemical sampling or geophysical surveys been completed. The West Arunta region has historically been explored for gold
and copper with reconnaissance airborne geophysics and limited ground geophysical and geochemical surveys.
The immediate focus will be to complete heritage agreements and commence a reconnaissance exploration program.
Figure 1. The West Arunta Nb-REE Project location.
For the quarter ending 31 December 2023
4
Mukinbudin Niobium & Rare Earths Project
Western Australia, Australia
The Mukinbudin Nb-REE Project comprises two exploration licences (E70/6048 and E70/6359) located 250km northeast of
Perth in the South West Mineral Field of Western Australia.
In May 2023, Mukinbudin took its place on the global critical minerals stage when two separate companies with two separate projects
in close proximity to MTM’s new acreage announced significant REE results within hours of each other. Codrus Minerals’ (ASX:CDR)
clay-hosted Karloning Project provided instant success when the first drill-hole completed in its maiden dill program hit a significant zone
of high-grade REE mineralisation. Meanwhile, Caprice Resources (ASX:CRS) identified a significant 300m long anomaly which returned
elevated readings up to 3,761ppm rare earth oxides in rock chip and soil samples.
Tenement E70/6048 lies over the site of the Calcaling Pegmatite and was previously mined for feldspar in a small open pit.
The immediate priority is to commence compilation of historical data over the tenement areas and commence planning of an exploration
program for REE and for lithium, which may be associated with the known pegmatites in the district. The areas are easily accessible by
sealed road from Perth and then via local roads and farming tracks.
Figure 2. The Mukinbudin Nb-REE Project location.
For the quarter ending 31 December 2023
5
Flash Joule Heating Technology
Western Australia, Australia
Flash Joule Heating (FJH) is a processing and recycling technology being developed to extract critical metals like REE,
nickel, cobalt and lithium from natural mineralisation and from waste material.
As part of the Flash Metals transaction, MTM has acquired an option to licence the FJH, which has been developed by researchers at
Rice University in the USA. Rice has had previous ASX successes including Weebit-Nano Ltd (ASX:WBT, over $700M mkt cap) and
Universal Matters.
The technology involves the rapid and intense heating of material to volatilise metals to make them more amenable to extraction with
conventional acid leaching. Its application for treating REE mineralisation could unlock immense value from otherwise economically
marginal deposits. Notably, the recycling of lithium-ion batteries, e-waste, coal fly ash and bauxite residue offers an exciting recycling
application to more efficiently recover critical metals including REE, precious metals and battery minerals.
FJH ushers in an exciting new era for MTM, with the potential to deliver critical minerals directly to the world’s largest markets
economically and sustainably while building the world’s largest inventory of REEs.
Figure 3. Flash Joule Heating is being developed by Rice University in Houston, USA which has had previous ASX successes including
Weebit-Nano Ltd and Universal Matters.
For the quarter ending 31 December 2023
6
Pomme Rare Earths-Niobium Project
Québec, Canada
The Pomme REE-Nb Project is a known carbonatite intrusion located in south-western Québec, Canada (Figure 4). The
Project has exceptional results from a recently completed drilling program, showing enrichment in rare earth elements (REE)
and niobium (Nb) and is considered to be an extremely prospective exploration target.
Pomme is located adjacent to the world-class Montviel REE-Nb deposit (owned by Geomega Resources Inc), that has a defined total
indicated and inferred resource of 266 million tonnes (Mt) @ 1.45% TREO & 0.14% Nb2O5.
MTM has entered into a binding option agreement with Geomega Resources to acquire a 100% interest in the Pomme claims and is now
advancing exploration at Pomme to discover a REE-Nb resource.
Figure 4. Pomme REE-Nb Project location.
For the quarter ending 31 December 2023
New broad zones of REE-Niobium mineralisation identified
In September 2023, MTM completed a 13-hole program over 5,718m at Pomme. The latest diamond drilling results, announced in
January 2024 subsequent to the end of the quarter, further confirm REE and niobium mineralisation over broad intervals in previously
untested parts of the Pomme carbonatite complex.
Hole POM-23-13 intersected 330m @ 0.34% TREO & 0.02% Nb2O5 (from 71.7m) including a number of zones greater than
0.6% TREO and locally up to 2.0% TREO.
Hole POM-23-11 intersected 468.35m @ 0.29% TREO & 0.06% Nb2O5 (from 22.65m), including 74.75m @ 0.47% TREO &
0.06% Nb2O5 (from 252m).
MTM has been announcing drilling results since September last year. Drilling highlights were:
Hole POM-23-05
276m @ 0.37% TREO & 0.08% Nb2O5 (from 225m) including:
9.0m @ 0.94% TREO & 0.02% Nb2O5 (from 226.5.5m) including
3.8m @ 1.46% TREO & 0.01% Nb2O5
57m @ 0.47% TREO & 0.10% Nb2O5 (from 375m) including:
3.4m @ 1.99% TREO & 0.02% Nb2O5
63.5m @ 0.48% TREO & 0.06% Nb2O5 (from 437.5m to EOH) including:
12.7m @ 1.04% TREO & 0.04% Nb2O5
Hole POM-23-04:
266.2m @ 0.22% TREO & 0.04% Nb2O5 (from 36.8m), including:
39.5m @ 0.46% TREO & 0.05% Nb2O5 (from 79m) including
4.25m @ 0.88% TREO & 0.07% Nb2O5
Hole POM-23-08:
149.5m @ 0.32% TREO & 0.05% Nb2O5 (from 122m), including:
1.5m @ 1.31% TREO & 0.06% Nb2O5 (from 79m)
Hole POM-23-07:
20.3m @ 0.79% TREO & 0.03% Nb2O5 (from 225m), including:
1.6m @ 1.25% TREO & 0.06% Nb2O5 (from 170.5m) and
4.25m @ 0.88% TREO & 0.07% Nb2O5
47.8m @ 0.30% TREO & 0.07% Nb2O5 (from 190.8m)
106.5m @ 0.27% TREO & 0.04% Nb2O5 (from 249.0m)
47.5m @ 0.42% TREO & 0.05% Nb2O5 (from 378.0m0, including:
6.0m @ 0.60% TREO & 0.06% Nb2O5 (from 387.0m) and
1.0m @ 1.80% TREO & 0.04% Nb2O5 (from 401.9m) and
1.25m @ 3.34% TREO & 0.03% Nb2O5 (from 419.5m)
Assays confirm that a significant proportion of the TREO grade is high value magnet REE mineralisation - neodymium (Nd) and
praseodymium (Pr).
All assays have now been received for the Pomme diamond drilling program and modelling of results are underway to plan follow-up
work during the next field season in Quebec.
7
For the quarter ending 31 December 2023
8
Figure 5 Drill status map of the Pomme project, showing current and historical drill hole locations overlain on simplified interpreted
basement geology diagram.
New deal to expand MTM’s REE-Nb acreage in Canada
In October 2023, MTM announced it had bolstered its portfolio of highly prospective REE-Nb targets in southern Quebec, Canada,
entering into a second binding option agreement with Geomega Resources Inc. to acquire a 100% interest in the Montviel South Project.
The new project is located 10km south of MTM’s Pomme Project.
For the quarter ending 31 December 2023
9
East Laverton Rare Earths Project
Western Australia, Australia
The East Laverton Project covers 1,900km2 in the prolific Eastern Goldfields region of Western Australia and hosts an
emerging district-scale REE mineralisation opportunity at Point Kidman in the north of the project as well as gold and base
metals anomalies at Seahorse in the south.
Encouraging beneficiation results for REE clays at Point Kidman prospect
During the quarter, MTM received the results of preliminary metallurgical test work on four composite drilling samples collected from the
Point Kidman REE prospect, which showed that there are significant opportunities to potentially optimise the future processing of the
clay-hosted mineralisation. This is a major step forward in proving the economic viability of a rare earth deposit at East Laverton.
Basic metallurgical tests including analysis of different size fractions and leach tests were completed to evaluate recovery of REEs from
widespread clay-hosted mineralisation identified by previous aircore drilling.
The Company was encouraged by the substantial uplift in head grade and rejection of low-grade material that can be achieved by simple
particle size separation.
Size Fraction Analysis
Sizing analysis work has demonstrated that the REE mineralised material is highly amenable to upstream beneficiation as the majority of
the REEs are apparently hosted in the ultrafine -20 µm (less than 20 micron) size fraction. REE grade can potentially be significantly
increased, and waste material removed, by adopting simple mineral beneficiation techniques during processing.
Figure 6. East Laverton Project location diagram showing prospect areas.
For the quarter ending 31 December 2023
10
For the sizing analysis, a 500g split was prepared from each of the metallurgical sample composites and was screened at 106, 75, 53,
38 and 20 µm particle size. The distribution of REE throughout the size fractions of each sample is summarised in Figure 7 below,
indicating that a large portion of the REE report to the -20 µm size fraction.
Overall sizing results indicate that the -20 µm fraction contains more than half of the TREE for all samples except 03699, where the
majority of REE was retained in the coarser +106 µm fraction.
Figure 7. Total REE distribution in different size fractions for all composite samples.
Screening of the samples at a particle size of +106 µm allow for the following:
Mass recoveries to the fine fraction (-106 µm) ranging from 22.0% to 62.5%, averaging 45.6%;
TREE recoveries to the fine fraction ranging from 29.4% to 95.1%, averaging 76.1%;
Excluding the results from sample 03699, mass recovery averaged 53.4% and TREE recovery averaged 85.6%.
Results indicate minimal difference in the distribution between the HREE and LREE throughout the samples.
Analysis of the different fraction sizes show that removal of coarse size particles substantial increases in TREE grades, with the average
grade generally increasing in progressively finer particle sizes.
An average of ~100% upgrade from the TREE head grade assay and ~75% upgrade from the MREE head grade assay was achieved
in the finest -20 µm fraction (Table 1). The best result achieved was a 132% increase in TREE (sample 04591), where the grade
increased from a head grade of 3,071 ppm to 7,120 ppm TREE, albeit with a reduced TREE recovery of 52.9% TREE.
Results indicate minimal difference in the distribution between the HREE and LREE throughout the samples.
Analysis of the different fraction sizes show that removal of coarse size particles substantial increases in TREE grades, with the average
grade generally increasing in progressively finer particle sizes.
An average of ~200% upgrade from the TREE head grade assay was achieved in the
finest -20 µm fraction (Table 1). The best
result achieved was a 232% increase (sample 04591), where the TREE grade increased from a head grade of 3,071 ppm to 7,120 ppm
TREE, albeit with a TREE recovery of 52.9% TREE.
For the quarter ending 31 December 2023
11
Table 1: TREE recovery, grade uplift and mass removed using ‘ultrafine’ -20 µm size fraction.
Comp Sample
03391
Comp Sample
03699
Comp Sample
03829
Comp Sample
04591
85.3
14.1
69.6
52.9
TREE grade uplift (%)
210
151
202
232
Mass removed (%)2
58.5
91.8
65.1
76.1
-20 µm fraction
TREE mass distribution (%)
1
1
2
compared to head grade assay
compared to head sample
Leaching Analysis
Preliminary metallurgical leaching tests have also been received for the samples of REE-enriched clays from the Pt Kidman prospect.
Four leach tests were conducted on each of the composite samples, as summarised in Table 2.
Table 2: Summary of leach test regimes
Test
Purpose
Reagents
(Lixiviant)
Reagents
(Acid)
pH
Temp.
(oC)
Time
(h)
1
Leach any REE Ionicly Exchangeable
phase present
1.0M (NH4)2SO4
+ 1.0M NaCl
H2SO4 to maintain
pH at ~4
4
25
(ambient)
6
1.0M (NH4)2SO4
+ 1.0M NaCl
H2SO4 to maintain
pH at ~1
1
50
6
1.0M NaCl
25g/t HCl
<1
50
6
1.0M NaCl
100g/t HCl
~0
50
6
2
3
4
Test if increased temp. and lower pH
improve recoveries of the REE Ion
Exchange phase
Test if REEs within the Colloid phase
(insoluble oxides or hydroxides) are
leachable
Test if REE’s within the Mineral phase
(insoluble oxides or hydroxides) are
leachable.
Test results show that significant recovery of REE from the clay can be achieved by leaching in hydrochloric acid (HCl). Recoveries of
the REE’s using a 100 g/l HCl leach showed average TREE recoveries of up to 76.1%. Leach recoveries for each sample over the four
test regimes are shown below (Figure 8 and Table 2). Elemental recoveries are shown in Figure 9.
For the quarter ending 31 December 2023
12
Figure 8: Leach test average TREE Recoveries for all composite samples.
Table 2: Average REE leaching recoveries for each sample, for a range of leaching regimes.
Leach Solution
TREE (AVE)
Composite Sample 03391
Amm.
Amm.
HCl
Sulphate Sulphate HCl 25g/L
100g/L
pH 4
pH 1
Composite Sample 03699
Amm.
Amm.
HCl
Sulphate Sulphate HCl 25g/L
100g/L
pH 4
pH 1
0.06%
0.19%
1.28%
38.14%
50.25%
Composite Sample 03829
Leach Solution
Amm.
Sulphate
pH 4
Amm.
Sulphate
pH 1
TREE (AVE)
0.08%
1.85%
1.62%
39.17%
62.17%
Composite Sample 04591
HCl 25g/L
HCl
100g/L
Amm.
Sulphate
pH 4
Amm.
Sulphate
pH 1
HCl 25g/L
HCl
100g/L
55.15%
76.45%
0.07%
0.91%
27.61%
67.23%
Work has shown that the majority of mineralisation is not associated with ionic clays as evidenced by the low recoveries achieved by
the first two test utilising ammonium sulphate. The REE’s are instead likely contained within colloidal (ultrafine) REE particles, oxidised
rare earth carbonate or rare earth oxide minerals. Recovery of these REE’s can be achieved via acid leaching, requiring higher acid
concentrations. These results are comparable with the majority of known REE clays projects in Western Australia.
Composite 03391
Composite 03699
For the quarter ending 31 December 2023
Composite 03829
13
Composite 04591
Figure 9: Summary of elemental REE recoveries for each composite sample, for the different leaching regimes.
Further Work
Only a small part of the extensive Pt Kidman prospect area has been tested with drilling and more than 200 km2 area has critical metal
prospectivity based on the recent geochemical soil sampling completed by the Company.
The next phase of target generation is currently underway, ahead of a further campaign of drilling where the Company’s focus will be on
identifying further contiguous zones of higher-grade REE mineralisation that could form the basis of a substantial resource.
Further metallurgical test work will also be undertaken to characterise the recovery of the REEs from within the identified mineralised
areas and determine if there are zones that have potential for both beneficiation and for higher recoveries. The reported test results are
non-optimised and there remains significant potential for improvement in recovery and acid consumption.
Ravensthorpe Project
Western Australia, Australia
The Ravensthorpe Project covers a number of exploration licences in Western Australia’s Albany-Fraser Orogen and is
prospective for a suite of battery metals, including lithium, graphite, nickel-copper-PGE, REE and gold mineralisation. There
are numerous active mining operations, project developments and exploration projects in the region.
No fieldwork was completed at the Ravensthorpe project during the quarter. The Company has undertaken a strategic review of the
project and is currently undertaking a process to divest its exploration licences in the project areas in order to focus on higher priority
exploration project held by the Company.
For the quarter ending 31 December 2023
14
Mt Monger Project
Western Australia, Australia
The Mt Monger Gold Project is centred approximately 45km east-northeast of Kambalda and 70km to the southeast of
Kalgoorlie-Boulder, within the Goldfields Region of Western Australia. The project comprises six granted exploration
licences, one pending exploration license and three granted prospecting licences, covering an area of about 80km2.
The Mt Monger region has proven potential for hosting gold, with gold mining commencing in the area during the late 1890s and
continuing to the present day. The Mt Monger Gold Project is within close proximity to Gold Fields Limited’s (JSE:GFI) St Ives gold camp
and adjacent to the Silver Lake Resources Ltd (ASX:SLR) Daisy Milano gold operation and their currently operating 1.2Mtpa Randalls
gold processing facility. Lefroy Exploration Limited (ASX:LEX, Lefroy) has experienced recent exploration success at their Burns
Prospect, located to the south of the Mt Monger Gold Project.
No fieldwork was completed at the Mt Monger project during the quarter. The Company is currently assessing strategic options for this
project.
Figure 13: Location diagram of the Mt Monger Project showing tenements and known gold occurrences.
For the quarter ending 31 December 2023
15
Corporate
Cash Position
At 31 December 2023, cash at bank totalled ~$0.495 million. On 19 January 2024, Tranche 1 of a Placement announced by the
Company was completed which resulted in the receipt of $1.59 million (before costs).
Equity
As at 31 December 2023, the Company had on issue 99,437,086 Ordinary Shares, 52,830,875 quoted options (MTMO), 10,250,000
unlisted options and 600,000 unlisted performance rights.
The Company has announced a Placement and Entitlement Offer which will result in the issue of approximately 87.5 million shares and
43.75 million quoted options if these offers are fully subscribed.
Tranche 1 of the Convertible Note (see below) was converted to shares on 19th January 2024 resulting in the issue of 4.97 million
shares. Subject to shareholder approval, a further 10.65 million shares will be issued on conversion of Tranche 2 of the Convertible
Notes along with 7.81 million quoted options.
As part of the acquisition of Flash Pty Ltd (refer ASX announcement 19th December 2023), subject to shareholder approval, 100 million
shares and 50 million quoted options will be issued as consideration for the purchase of Flash Metals Pty Ltd. A further 37.5 million
performance rights and 15 million unlisted performance options will be issued as consideration.
Capital Raise
In January 2024, subsequent to the end of the quarter, MTM announced that it had received exceptionally strong demand from
institutional and professional investors pursuant to Section 708 of the Corporations Act 2001 (Cth) (Corporations Act) for a two tranche
Placement to raise $5 million (before costs) through the issue of 62.5 million fully paid ordinary shares (New Shares) at an issue price of
$0.08 per New Share. For every two New Shares purchased in the Placement, one free attaching option (Quoted Option) will be issued.
The Quoted Options will be issued on the same terms and form part of the same class as the existing quoted options (ASX: MTMO)
which have an exercise price of $0.25 and an expiry date of 26 November 2024.
In conjunction with the Placement, the Company will carry out a non-renounceable pro-rata offer (Entitlement Offer) to Eligible
Shareholders (defined below) to raise up to approximately $2 million (before costs) through the issue of one New Share for every four
Shares held on the Record Date, at an issue price of $0.08 per New Share. The Entitlement Offer includes one (1) free attaching Quoted
Option for every two New Shares purchased in the Entitlement Offer. The Quoted Options will be the same as the existing quoted
options (ASX: MTMO).
Convertible Note Agreement
In November, MTM executed binding convertible note agreements (Convertible Note Agreement) with a syndicate of sophisticated and
institutional investors, for an investment in the Company of $1.0m (before costs). The Convertible Note Agreement remains subject to
and conditional upon shareholder approval for the issue of a portion of the Securities that will be issued as part of the conversion of the
Notes. A general meeting of shareholders will be called and the notice of meeting will contain further details in relation to the Securities
that are the subject of conversion of the Notes. The Convertible Note Agreements will convert into 14,374,975 Shares. All of the Notes
will convert to equity in MTM at a price of $0.068 per share which is a 20% discount to the share price that was set for the Company’s
placement and entitlement offers, as per the Convertible Note terms.
Other Corporate Matters
The Company held it’s annual general meeting on 29th November 2023. All resolutions were passed.
For the quarter ending 31 December 2023
16
ASX Additional Information
Exploration Activities ASX Listing Rule 5.3.1:
Total exploration expenditure for the December 2023 Quarter was $0.956 million (refer Item 2.1(d) of the accompanying Appendix 5B),
which predominantly comprised:
Drilling and assay costs relating to the Pomme REE Project in Québec, Canada;
Assay results and metallurgical testing from REE samples from the East Laverton Project, Western Australia.
Mine Production Activities ASX Listing Rule 5.3.2:
There were no mine production or development activities conducted during the Quarter.
Payments to Related Parties ASX Listing Rule 5.3.5:
The aggregate amount of payments to related parties and their associates for the December quarter of $141k (refer Item 6 of the
accompanying Appendix 5B) related to director fees, consulting services and salaries ($108k) and office and storage rental and
administration services ($33k).
During the quarter, lead manager fees of $66k were charged by an entity associated with directors Hannaford and Izzard under a
mandate relating to funds raised by way of the Convertible Note.
Release of Escrow Securities
In accordance with ASX Listing Rule 3.10A, the following securities were released from escrow during the quarter:
Date Escrow ended
Description
No of Shares
15th July 2023
Directors – Founders Shares
8,022,500
1st September 2023
Geomega Resources, Inc. – purchase of Pomme Project
1,333,330
For the quarter ending 31 December 2023
17
Tenement Interests
Project location
Tenement
Reference
Status
Equity at
30 Sept 2023
Equity at
31 Dec 2023
E 25/525
Live
100%
100%
E 25/531
Live
100%
100%
E 25/532
Live
100%
100%
E 25/536
Live
100%
100%
E 25/562
Live
80%
80%
E 25/565
Live
100%
100%
E 25/603
Pending
-
-
P 25/2489
Live
100%
100%
P 25/2490
Live
100%
100%
P 25/2568
Live
80%
80%
E 38/3302
Live
100%
100%
E 38/34621
Live
51%
51%
E 38/3466
1
Live
51%
51%
E 38/3499
1
Changes during the quarter
Western Australia, Australia
Mt Monger Project
East Laverton Project
Ravensthorpe Project
West Arunta Project
Muckinbudin Project
1
Live
51%
51%
E 38/3506
Live
100%
100%
E 38/3507
Live
100%
100%
E 38/3510
Live
100%
100%
E 38/3511
Live
100%
100%
E 38/3765
Live
100%
100%
E 63/2146
Live
100%
-
E 70/5942
Live
100%
100%
E 74/618
Live
100%
100%
E 74/692
Live
100%
-
Surrendered
E 74/696
Live
100%
-
Surrendered
E 74/700
Live
100%
100%
E 74/701
Live
100%
100%
E 74/703
Live
100%
100%
E 74/723
Live
100%
100%
E 74/725
Pending
-
-
E 74/726
Live
100%
100%
E 74/727
Live
100%
100%
E 80/5858
Live
-
-
Acquisition pending
E 80/5874
Live
-
-
Acquisition pending
E 80/5875
Live
-
-
Acquisition pending
E 70/6048
Live
-
-
Acquisition pending
E 70/6359
Live
-
-
Acquisition pending
Surrendered
Tevel Pty Ltd (Tevel) is the registered holder of E38/3462, E38/3466 and E38/3499; MTM has entered into a Farm-In agreement
with Tevel to earn up to a 75% interest in the tenements.
For the quarter ending 31 December 2023
Project location
18
Claim Title #
Status
Equity at
30 Sept 2023
Equity at
31 Dec 2023
CDC121
CDC122
CDC1005980
CDC1005982
CDC1005983
CDC2234423
CDC2234424
CDC2234425
CDC2234426
CDC2234427
CDC2234428
CDC2234429
CDC2234430
CDC2234431
CDC2234432
CDC2234433
CDC2240300
CDC2240301
CDC2240302
CDC2240303
CDC2240304
CDC2240305
CDC2240306
CDC2240307
CDC2240309
CDC2240310
CDC2240311
CDC2240312
CDC2240313
CDC2458316
CDC2458327
CDC2458328
CDC2458329
CDC2458330
CDC2458331
CDC2458332
CDC2458333
CDC2458334
CDC2458345
CDC2458346
CDC2458349
CDC2522460
CDC2598360
CDC2754413
CDC2754414
CDC2757444
CDC2757445
CDC2757446
CDC2784081
CDC2784082
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Quebec, Canada
Pomme Project
Changes during the quarter
For the quarter ending 31 December 2023
Project location
19
Claim Title #
Status
Equity at
30 Sept 2023
Equity at
31 Dec 2023
CDC112
CDC94141
CDC1105928
CDC2458312
CDC2458313
CDC2458317
CDC2458318
CDC2458319
CDC2458320
CDC2458321
CDC2783265
CDC2783266
CDC2783267
CDC2783268
CDC2783269
CDC2783270
CDC2783271
CDC2783272
CDC2783273
CDC2783274
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
-
-
Changes during the quarter
Quebec, Canada
Montviel South
Geomega Resources Inc is the registered holder of the Pomme claims and the Montviel South claims. MTM has entered into an option
agreement with Geomega to earn up to a 100% interest in the claims.
For the quarter ending 31 December 2023
20
Company Profile
MTM Crit
Share your feedback
Discover