Investor Presentation
Released
Released
Announcement PDF
Innovating Critical Metal Supply
INVESTOR PRESENTATION
ASX: MTM
16 October 2024
Important Notice and Disclaimer (1/2)
Introduction
Not an offer
Disclaimer
This investor presentation (Presentation) has been prepared by MTM Critical Metals
Limited (ACN 645 885 463) (“MTM Critical Metals”, “MTM’ or “Company”) and is dated 11
October 2024. This Presentation has been prepared in relation to a proposed capital raising
comprising a placement to eligible institutional investors (Offer).
This Presentation is not and should not be considered an invitation or offer to acquire or sell
Shares in MTM Critical Metals or any other financial products, or a solicitation to invest in
or refrain from investing in, shares in MTM Critical Metals or any other financial products.
This Presentation is for information purposes only and is not a prospectus, disclosure
document, product disclosure statement or other offering document under Australian law
or any other law. It has not been, and is not required to be, lodged with the Australian
Securities and Investment Commission (ASIC).
Peloton Capital Pty Ltd (ACN 149 540 018) and Sandton Capital Pty Ltd (ACN 637 284 372)
(Joint Lead Managers) are the lead managers to the Offer. To the maximum extent
permitted by law, MTM Critical Metals, its related bodies corporate and their respective
officers, directors, employees, advisers, partners, affiliates and agents (MTM Critical
Metals Parties), and the Joint Lead Managers, their related bodies corporate and their
respective officers, directors, employees, advisers, partners, affiliates and agents (Joint
Lead Manager Parties), make no representation or warranty, express or implied, as to the
accuracy, completeness, timeliness or reliability of the contents of this Presentation. To the
maximum extent permitted by law, none of the MTM Critical Metals Parties nor the Joint
Lead Manager Parties accept any liability (without limitation, any liability arising from fault
or negligence) for any loss whatsoever arising from the use of or reliance on this
Presentation or its contents or otherwise arising in connection with it. None of the Joint
Lead Manager Parties, have authorised, permitted or caused the issue, submission,
dispatch or provision of this Presentation and, except to the extent referred to in this
Presentation, none of them makes or purports to make any statement in this Presentation
and there is no statement in this Presentation which is based on any statement by any of
them. None of the MTM Critical Metals Parties nor the Joint Lead Manager Parties make
any recommendation as to whether you or your related parties should participate in the
Offer nor do they make any representations or warranties to you concerning the Offer. By
accepting this Presentation, you expressly disclaim that you are in a fiduciary relationship
with any of the Joint Lead Manager Parties.
The following notice and disclaimer applies to this Presentation, and you are therefore
advised to read it carefully before reading or making any other use of this Presentation or
any information contained in this Presentation. Certain market and industry data used in
connection with this Presentation may have been obtained from research, surveys or
studies conducted by third parties, including industry or general publications. None of the
Company, its representatives or advisers have independently verified any such market or
industry data provided by third parties or industry or general publications. By accepting this
Presentation, you represent and warrant that you are entitled to receive this Presentation in
accordance with the restrictions, and agree to be bound by the limitations, contained within
it.
Summary Information
The material in this presentation is general background information about MTM Critical
Metals and its activities current as at the date of this Presentation. It is information given in
summary form and does not purport to be complete, nor does it contain all the information
which a prospective investor may require in evaluating a possible investment in MTM
Critical Metals or that would be required in a prospectus, product disclosure statement or
other disclosure document prepared in accordance with the requirements of the
Corporations Act. The Presentation should be read in conjunction with the Company’s other
periodic and continuous disclosure announcements filed with the Australian Securities
Exchange, which are available at www.asx.com. Information in this Presentation is not
intended to be relied upon as advice to investors or potential investors and does not
consider the investment objectives, financial situation or needs of any particular investor.
Investors should consider these factors, and consult with their own legal, tax, business
and/or financial advisor in connection with any investment decision.
Not financial product advice
This Presentation does not constitute investment or financial product advice (nor tax,
accounting or legal advice) nor any recommendation to acquire New Shares and does not
and will not form any part of any contract for the acquisition of shares of MTM Critical
Metals. Each recipient of the Presentation should make its own enquiries and investigations
regarding all information in this Presentation including but not limited to the assumptions,
uncertainties and contingencies which may affect future operations of MTM Critical Metals
and its subsidiaries and the impact that different future outcomes might have on MTM.
Information in this Presentation is not intended to be relied upon as advice to investors or
potential investors and has been prepared without taking account of any person’s individual
investment objectives, financial situation or particular needs. Before making an investment
decision, prospective investors should consider the appropriateness of the information
having regard to their own objectives, financial situation and needs and seek appropriate
advice, including financial, legal, accounting and taxation advice appropriate to their
jurisdiction. MTM Critical Metals is not licensed to provide financial product advice in
respect of the New Shares. Cooling off rights do not apply to the acquisition of New Shares
under the Offer.
This Presentation does not constitute an offer to sell, or a solicitation of an offer to buy any
securities in any jurisdiction. The distribution of this Presentation and the offer of securities
is restricted in jurisdictions outside Australia. See the section below captioned
“International Offering Jurisdictions” for more information. Any failure to comply with such
restrictions could constitute a violation of applicable securities laws. In particular, this
Presentation may not be released to US wire services or distributed in the United States.
This Presentation does not constitute an offer to sell, or the solicitation of an offer to buy,
any securities in the United States or any jurisdiction in which such an offer would be
illegal. The New Shares have not been, and will not be, registered under the US Securities
Act of 1933 or the securities laws of any state or other jurisdiction of the United States and
may not be offered or sold in the United States except in transactions exempt from, or not
subject to, the registration requirements of the US Securities Act and applicable US state
securities laws.
Financial Information
All information in this Presentation is in Australian dollars ($) unless stated otherwise. A
number of figures, amounts, percentages, estimates, calculations of value and fractions in
this presentation are subject to the effect of rounding.
Accordingly, the actual calculation of these figures may differ from the
figures set out in this presentation and totals may vary slightly due to rounding. All
references to financial years (FY) appearing in this Presentation are to the financial years
ended on 30 June of the indicated year.
This Presentation has not been audited in accordance with the Australian Auditing
Standards. Unaudited financial data contained within this presentation may be subject to
change.
The Joint Lead Managers may have interests in the securities of MTM Critical Metals,
including by providing investment banking services to MTM Critical Metals. Further, the
Joint Lead Managers may act as market maker or buy or sell those securities or associated
derivatives as principal or agent. The Joint Lead Managers may receive fees for acting as
joint lead managers to the Offer.
International Offer Restrictions
This document does not constitute an offer of New Shares in the Company in any
jurisdiction in which it would be unlawful. In particular, this document may not be
distributed to any person, and the New Shares may not be offered or sold, in any country
outside Australia.
Effect of rounding (if applicable)
Several figures, amounts, percentages, estimates and calculations of value in this
Presentation are subject to the effect of rounding.
Past performance
Information regarding past performance, including past share price information, given in
this Presentation is given for illustrative purposes only and should not be relied upon (and is
not) an indication of its future performance or condition. The historical financial information
contained in this Presentation is, or is based on, information that has previously been
released to the market.
2
Important Notice and Disclaimer (2/2)
Forward-looking statements and forecasts
Investment risk
This Presentation may contain “forward-looking” statements including statements,
guidance, forecasts, estimates, prospects, projections or statements in relation to future
matters, including statements regarding MTM’s intent, belief or current expectations with
respect to its business operations, market conditions, results of operations, financial
conditions, and risk management practices. Forward-looking statements can generally be
identified by the use of forward-looking words such as “anticipated”, “expected”, “aim”,
“predict”, “projections”, "should", "plans", “guidance”, “forecast”, “estimates”, “could”,
“may”, “target”, “consider”, “will” and other similar expressions. Indications of, and
guidance on, future earnings, financial performance, and financial position are also
forward-looking statements. Forward-looking statements including projections, indications
or guidance on future earnings or financial position and estimates are provided as a general
guide only and should not be relied upon as an indication or guarantee of future
performance. The forward-looking statements contained in this Presentation involve known
and unknown risks and uncertainties and other factors, many of which are beyond the
control of the Company and may involve significant elements of subjective judgement and
assumptions as to future events which may or may not be correct. Forward-looking
statements may also assume the success of the Company's business strategies and no
assurance can be given that any of the strategies will be effective or that the anticipated
benefits from the strategies will be realised in the period for which the forward-looking
statements may have been prepared or otherwise.
An investment in securities in MTM Critical Metals is subject to known and unknown risks,
some of which are beyond the control of MTM Critical Metals. MTM Critical Metals does
not guarantee any particular rate of return or the performance of MTM Critical Metals, nor
does it guarantee any particular tax treatment. Investors should have regard to the risk
factors outlined in this Presentation when making their investment decision and should
make their own enquiries and investigations regarding all information in this Presentation,
including the assumptions, uncertainties and contingencies which may affect future
operations of MTM Critical Metals and the impact that different future outcomes may have
on MTM Critical Metals.
Forward-looking statements, opinions and estimates are based on assumptions and
contingencies which are subject to certain risks, uncertainties and change without notice,
as are statements about market and industry trends, which are based on interpretations of
current market conditions. Many of these risks are not in the control of MTM Critical
Metals. Should one or more of the risks or uncertainties materialise, or should underlying
assumptions prove incorrect, there can be no assurance that actual outcomes will not
differ materially from these statements. No independent third party has reviewed the
reasonableness of these forward-looking statements. You should not place undue reliance
on forward-looking statements and neither MTM Critical Metals nor any of its directors,
employees, advisers or agents assume any obligation to update such information.
No representation, warranty or assurance (express or implied) is given or made in relation
to any forward-looking statement by any person (including the Company or any of its
advisers). In particular, no representation, warranty or assurance (express or implied) is
given that the occurrence of the events expressed or implied in any forward-looking
statements in this Presentation will actually occur. Actual operations, results, performance,
production targets or achievement may vary materially from any projections and forwardlooking statements and the assumptions on which those statements are based.
General
The distribution of this Presentation to persons or in jurisdictions outside Australia may be
restricted by law and any person into whose possession this Presentation comes should
seek advice on and observe those restrictions.
Any failure to comply with such restrictions may violate applicable securities law. No party
other than MTM Critical Metals has authorised, permitted, caused the issue, submission,
dispatch or provision of this Presentation, or takes any responsibility for, or makes or
purports to make any statements, representations or undertakings in this Presentation.
None of the MTM Critical Metals Parties take any responsibility for the information in this
Presentation or any action taken by the recipient on the basis of such information. To the
maximum extent permitted by law, the MTM Critical Metals Parties:
•
exclude and disclaim all liability, including for negligence, or for any expenses,
losses, damages or costs incurred by you as a result of your participation in the
Offer and the information in this Presentation being inaccurate or incomplete in any
way for any reason, whether by negligence or otherwise; and
•
make no representation or warranty, express or implied, as to the currency,
accuracy, reliability or completeness of information in this Presentation.
Determination of eligibility of investors for the purpose of the Offer is determined by
reference to a number of matters, including legal requirements and the discretion of MTM
Critical Metals and the Joint Lead Managers. The MTM Critical Metals Parties and Joint
Lead Manager Parties disclaim any liability in respect of the exercise or otherwise of that
discretion, to the maximum extent permitted by law.
To the fullest extent permitted by law (including the ASX Listing Rules), the MTM Critical
Metals Parties disclaim any obligation or undertaking to release any updates or revisions to
the information to reflect any change in expectations or assumptions. Except as required by
law, none of the MTM Critical Metals Parties assume any obligation to release any updates
or revisions to forward-looking statements to reflect any changes.
3
Executive Summary
MTM Critical Metals Ltd is an emerging Industrial Technology Company at the forefront of innovation in the critical
minerals and metals sectors. We are committed to advancing the commercialisation of our sustainable Flash Joule
Heating (FJH) metal recovery and processing technology.
Core
Technology
Commercial
Focus
4
•
FJH revolutionises metal extraction from ores & waste, allowing more efficient processing
compared to traditional methods
•
Applications in Minerals Processing & Waste Streams (mine tailings, bauxite residue (red
mud), e-waste and battery recycling), significantly contributing to a circular economy
•
Licenced (worldwide & exclusive) from Rice University, Texas
•
Industrial Validation: Design underway for 1-ton-per-day FJH Demonstration Plant
•
Primary Metal Focus: gallium (Ga) from waste streams & lithium from spodumene
concentrate, aligning with current global demand & strategic importance
•
Commercial production of Ga expected by Q4-25, positioning MTM for transformative
growth & potentially re-shoring Ga in the U.S., addressing a major national security risk
•
Actively exploring non-dilutive funding, including governmental grants and strategic
partnerships with Industry to support commercialisation
Our mission is to commercialise the unique FJH technology
Problems we are trying to solve: Traditional metal recovery methods
are expensive, energy & reagent-intensive, and non-selective
The solution:
Breakthrough Flash Joule Heating Platform
Pyrometallurgy (high heat) ⇒ Ineffective, NonSelective & Expensive
WASTE
ORE
Hydrometallurgy (strong solvents) ⇒ Ineffective,
Non-Selective & Expensive
Refractory Minerals – require significant energy
& acids to process
METAL
• What:
→ Efficient metal extraction from ores & waste, outperforming traditional methods
→ Extract value from deposits previously written off as uneconomic
→ Revolutionise process flowsheets using state-of-the-art heating technology
→ Solve key supply, environmental & recovery challenges
Ga 31
• Primary focus:
High-value / strategic metals Gallium, Gold and Lithium.
Li
• Feedstock:
Semiconductor scrap, e-waste & mineral ores
Au 79
3
5
Technology Overview
Flash Joule Heating (FJH)
6
Flash Joule Heating (FJH)
•
Advanced, patented, electrothermal processing platform that enhances metal recovery & mineral
processing compared to traditional methods.
•
By rapidly heating materials in a controlled atmosphere, FJH efficiently extracts metals from refractory
minerals (i.e. Lithium from spodumene) and from e-waste, etc.
•
Potential to revolutionise metal recovery by reducing energy consumption, reagent use and waste,
offering a more economical and environmentally friendly alternative.
GAS
(i.e. Chlorine)
WASTE or
MINERAL ORE
RECOVERED
METAL
7
Technology Options & Recent Advancements
Recent ‘chlorination’ licence amendment opens the door to a much wider range of metals and waste streams & overcome
the constraints of conventional processing
Conventional FJH: Rapid heat treatment in air or an inert
atmosphere
Chlorination & Carbochlorination FJH: Rapid heat treatment in
the presence of chlorine and/or carbon
Metal recovery from waste & ores
For metals that are poorly recoverable
using conventional methods
8
Flash Joule Heating Potential
1. Extract valuable metals from Industrial
Waste Streams
FJH
Spent
Li-Ion Batteries
High value
E-Waste
Semiconductor Scrap
Mine Tailings
2. Improve performance of refractory Mineral
Processing Operations in Mining Industry
Lithium
Rare Earths
Niobium
Antimony
9
Inventor Pedigree
•
FJH INVENTED BY DR JAMES TOUR - RICE UNIVERSITY
•
T. and W. F. Chao Professor of Chemistry, Computer Science, and Materials Science & NanoEngineering at Rice University.
•
Synthetic organic chemist; BS in Chemistry from Syracuse University, PhD from Purdue University,
postdoctoral training at Wisconsin and Stanford.
•
Former faculty at University of South Carolina, visiting scholar at Harvard.
•
Inducted into National Academy of Inventors (2015), listed in "The World’s Most Influential
Scientific Minds" by Thomson Reuters (2014). Named "Scientist of the Year" by R&D Magazine,
ranked among Top 10 chemists globally by Thomson Reuters (2009).
TRACK RECORD ON ASX
•
Dr Tour has started several successful companies in the last decade
centred around nanotechnology
•
Inventor of the tech licenced to WeebitNano (ASX:WBT) - Silicone
oxide computer memory chips
•
Weebit peaked at a market capitalisation of > A$1.5B in 2023
10
International presence via high caliber partners
KNIGHTHAWK
ENGINEERING
ENGINEERING DESIGN & SCALE-UP
Houston, Texas, USA
METALLURGY R&D
Perth Australia
Flash Metals USA HQ (MTM)
Houston, Texas
FJH PIONEERS / R&D
Houston, Texas, USA
MTM has a Global Licence Agreement for FJH with Rice University
MTM HQ
Perth Australia
KnightHawk was founded in 1991 and specializes in bespoke engineering design solutions
Murdoch University is one of the leading centres of excellence in Australia for metallurgy
11
Comparable Companies on the ASX?
Date Reference: 11/10/20/24
Market Cap (A$M) - Peers on ASX vs MTM
Market Cap (A$M)
Market Cap (A$M)
4
Stage of Development
3
$1,000
2
$500
1
(3 =
Stage
Development
Stage
Development
Commercial)
= Commercial)
(3
$1,500
0
$0
ALPHA HPA
SILEX
IPERIONX
CALIX
AMAERO
TITOMIC
MTM
* NOTE: The peer comparison presented in this slide is subjective and based on MTM's internal assessment of industrial tech companies operating within similar sectors of mineral processing and extraction. This comparison does not necessarily adhere to any industryrecognised standards such as the Technology Readiness Level (TRL) scale and should not be interpreted as an exact like-for-like comparison in terms of stage of development, market cap, or technology maturity. The companies compared are in various stages of
development (as noted in the table), and their progress is based on publicly available information as of the date of this presentation. The development stages referenced in this comparison are for indicative purposes only and are not meant to represent a formal independent
analysis based on industry standard. Investors are advised to consult independent sources for a detailed assessment of each company’s projects and their stage of development. MTM does not warrant the accuracy of third-party data used for this comparison.
12
Commercialisation Strategy
Outlook & Pathway to Revenue
13
Value Creation Strategy
Our commercialisation strategy is centred on scaling our FJH technology from demonstration to full commercial operations,
forging strategic partnerships, securing offtake agreements and driving revenue growth through sustainable recycling
solutions that recover critical materials from high-value waste streams
STAGE 1
TECHNOLOGY
LEADERSHIP
STAGE 2
STRATEGIC
PARTNERSHIPS
Bench scale plant / proof of
concepts / industry
collaborations
ONGOING
14
FUNDED
INNOVATION
Demonstration plant design,
construction, commissioning &
optimisation
DESIGN UNDERWAY
STAGE 3
LICENSING
INCOME
SALES
GROWTH
Commercial operations, strategic offtakes,
growth of market coverage & verticals,
cashflow positive
FUTURE
We are preparing for
commercial scale-up with
our FJH Demonstration
Plant (“FDP”)
The FDP is a major step towards scaling our business to cashflow,
with capability to handle multiple feedstocks
Gallium
(semiconductor scrap)
Strategic
Partnerships
E-Waste (PCBs)
Lithium
(Spodumene
concentrate)
Other
FJH
Demonstration
Plant
(1 ton / day)
Validation of
technology
Saleable
product
Funded
Innovation
Commercial
Operations
(Rare Earths, Niobium &
Antimony concentrate, Red Mud,
Li-Ion “black mass”)
16
Indicative Commercialisation Timeline
Three priority verticals highlighted
BUSINESS
PROJECT
PARTNERS
WASTE /
RECYCLING
E-Scrap / Gallium &
Indium
MINERAL
PROCESSING
PRIORITY
2024
2025
Partnership in
progress
Bench testing
Pilot
E-Scrap / Gold, Silver,
Copper, Palladium, Tin
TBC - Discussions
underway
Bench testing
Red Mud / Alumina &
Titanium
TBC - Discussions
underway
Lithium
Partnership in
progress
Rare Earths
Partnership in
progress
Niobium
Sample testing
underway
Antimony / Refractory
gold
Sample identified
Bench testing
2027
2026
Commercial Operations
Pilot
Pilot
Commercial Operations
Commercial
Operations
With
International
Partner
17
The Gallium & Indium Opportunity
Ultra-high value Gallium & Indium recovery from semi-conductor scrap
•
Market Supply Issues: The global gallium market has been severely
impacted by China’s export restrictions, leading to dramatic price increase.
•
Gallium is crucial for various applications, including semiconductors, LEDs,
solar panels and defence technologies like radar systems.
•
Global demand is surging - recent price spikes to >US$800,000 / t.
Major Gallium & Germanium Importers from China
Source: S&P Global (2023)
Successful Lab-Scale Gallium Recovery using FJH
Global Gallium Metal Price Trend since 2018
Gallium Metal - Global Price, U.S. dollars per ton
900,000
Demand surge from integrated circuits,
light-emitting diodes (LEDs), & solar cells
Ga Metal Price (USD/t)
800,000
700,000
600,000
500,000
Chinese export controls
400,000
300,000
200,000
100,000
Domestic US Stockpile Tonnage = 0
0
Source: ASX:MTM announcement dated 27/08/2024, ‘Gallium successfully recovered using FJH’
2018
2019
2020
2021
2022
2023
2024
Source: Statista (2024), USGS (2024)
•
Statista 2024, Gallium price worldwide from January 2018 to January 2024, https://www.statista.com/statistics/1443942/gallium-global-price/
•
United States Geological Survey (USGS) 2024, Gallium Mineral Commodity Summaries 2024, https://pubs.usgs.gov/periodicals/mcs2024/mcs2024-gallium.pdf
18
The Gallium & Indium Opportunity
MTM is in the final stages of completing the design of its 1-ton-per-day FJH Demo Plant
Commercial
Focus
•
Commercial production of Ga expected by Q4-25, positioning MTM for transformative growth
•
Potentially re-shoring Ga recovery in the U.S., addressing a major national security risk
FJH
CHLORINE
SEMICONDUCTOR SCRAP
GaCl3
19
The e-Waste Opportunity
Weight and value of metals contained in the 62 Mt of e-waste
generated globally in 2022
Game changing potential for sustainably
recovering metals from electronic waste
•
E-waste is one of the fastest-growing components of solid waste with over
60Mt produced annually of which only about 20% is recycled.
•
Contains precious and critical metals like gold, copper, and palladium,
valued at >US$70B in potential recoverable content
•
•
Can contain up to 1,300 g/t silver & 300 g/t gold, offering an "above-ground"
resource with no exploration risk or mining costs (Yazici & Deveci 2013).
2.1 Mt
270 t
0.52 Mt
3.9 Mt
120 t
US$19B
US$19B
US$15B
US$14B
US$11B
US$8B
44 kt
280 kt
1,200 t
28 kt
US$1.4B
US$1B
US$0.9B
US$0.3B
Source: Forti et.al 2024; Patel,2024.
E-Waste generation by tonnage & per capita various countries in 2023
FJH demonstrated to successfully recover Gold, Silver, Copper, Tin &
Palladium without the use of toxic acids.
E-Waste Recycling: A Promising Solution to Meet a Substantial Portion of Global Metal Demand
Global Production
in 2023
Metal Content in EWaste (2022)
(t, metric)
(t, metric)
Copper (Cu)
22,000,000
2,100,000
10%
Chile, Peru, DRC
Gold (Au)
3,500
270
8%
China, Australia, Russia
Tin (Sn)
306,000
44000
14%
Indonesia, China, Myanmar
Palladium (Pd)
210
120
57%
Russia, South Africa
Silver (Ag)
25,505
1200
5%
Mexico, Peru
Metal
Source: IEA 2024; IPMI 2023; ITA 2024; ICSG 2024; J.P. Morgan 2024; USGS 2024
E-Waste contained metal
content as % of Global Major Producing Countries
Production
Source: Mairizal et.al 2023
Forti, V., Baldé, C.P., Kuehr, R. & Bel, G. 2024, The Global E-waste Monitor 2024. https://ewastemonitor.info/wp-content/uploads/2024/03/GEM_2024_18-03_web_page_per_page_web.pdf. ; International Copper Study Group (ICSG) 2024, World Copper Factbook 2024, https://icsg.org/; International Energy Agency (IEA) 2024, Copper –
Analysis, https://www.iea.org/; International Precious Metals Institute (IPMI) 2023, Global Silver Production Set to Fall in 2023, https://www.ipmi.org/; International Tin Association (ITA) 2024, Global Tin Resources and Reserves, https://www.internationaltin.org/ ; J.P. Morgan 2024, ‘Palladium Use in Electronics and Automotive
Industries.; United States Geological Survey (USGS) (2024), Wikipedia (2024) List of countries by palladium production. https://en.wikipedia.org/; Mairizal, A.Q., Sembada, A.Y., Tse, K.M., Haque, N. & Rhamdhani, M.A. 2023, 'Techno-economic analysis of waste PCB recycling in Australia', Resources, Conservation and Recycling, 190,
p.106784. https://doi.org/10.1016/j.resconrec.2022.106784.; Patel, P. 2024, ‘Electronic waste: a gold mine waiting to be tapped’, Chemical & Engineering News. Available at: https://cen.acs.org/environment/recycling/Electronic-waste-gold-mine-waiting/102/i23.; Yazici, E.Y. & Deveci, H. 2013, ‘Extraction of metals from waste printed
circuit boards (WPCBs) in H2SO4–CuSO4–NaCl solutions’, Hydrometallurgy, 139, pp.30-38. Available at: https://doi.org/10.1016/j.hydromet.2013.06.018
20
Significant Multi-Metal Recovery from E-Waste using FJH
High recoveries across several valuable metals
▪ Successful Very High Recovery of gold
(Au), silver (Ag), copper (Cu), Tin (Sn), and
Palladium (Pd) from e-waste
▪ Sustainable & Environmentally Friendly:
No toxic chemicals or non-selective
incineration; simple process minimises
environmental impact.
Au 79
Gold & Other
Target Metals
Chlorine
Gas
E-waste
FJH
Metal
Products
Water
Wash
Cu 29
Sn 50
Residual
Solids
▪ Strategic
Industry
Engagement:
discussions underway with e-waste
suppliers to support further testing and
strategic partnerships.
▪ Challenges with Current Methods:
pyrometallurgy releases toxic dioxins and
furans, while hydrometallurgy uses
hazardous acids that generate significant
toxic waste
Ag 47
Pd 46
Waste
Solids
Excellent initial test results for recovery of metals from E-Waste using Flash Joule Heating (FJH)
Metal
Gold (Au)
Silver (Ag)
Copper (Cu)
Tin (Sn)
Palladium (Pd)
E-waste feedstock metal content (g/t)
49.0
530
120,000
15,008
17.0
Product metal content (g/t) (metal
chloride)
33.8
353
58,085
12,956
13.9
Recov
Share your feedback
Discover