QUARTERLY ACTIVITIES & CASHFLOW REPORT
Metallium Limited (“Metallium” or the “Company”) (ASX: MTM; OTCQX: MTMCF; OTCQX ADR: MTLMY) is
pleased to report on a transformational March 2026 quarter, marked by strong progress in technology
development and commercialisation. The Gator Point Technology Campus is evolving into Metallium’s first
commercial processing hub and technology demonstration facility, supporting scalable deployment of its Flash
Joule Heating (FJH) platform across the United States.
KEY HIGHLIGHTS
Production and Technology
▪ Technology Development Advancing: Multiple FJH campaigns (>40) completed, with data driving
improvements in throughput, recoveries and system performance. Next milestone: multi-reactor operation,
with three (3) units operating in parallel to demonstrate scalability and operational confidence.
▪ Execution Capability Strengthened: Hunt, Guillot & Associates (HGA) engaged in expanded ‘owners
engineer’ EPCM role to support completions, commissioning, transition to operations, and the design of
the Gator Point expansion and broader multi-site deployment strategy.
▪ Flowsheet Optimisation Progressing: Design and testing of pre- and post-FJH circuits have been added
to the project scope to increase payability of final products.
▪ Technology Platform Expanded: IP strengthened via expanded Rice University licence covering
additional metal recovery pathways including Antimony and Platinum group metals (PGMs).
Agreements and Partnerships
▪ Long-Term Offtake Secured with U.S. Strategic Partner: 10-year metal offtake agreement executed with
Indium Corporation covering gallium, germanium and other critical and precious metals.
▪ First Binding Feedstock Supply Contract Executed: Multi-year e-scrap supply agreement signed with
Glencore, underpinning Stage-1 operations and scale-up.
▪ U.S. Government Engagement Advancing: Active engagement with U.S. federal and state agencies,
including EXIM and Department of Commerce, to support domestic critical minerals processing.
Finance and Corporate
▪ A$75 million Strategic Capital Raising Cornerstoned by U.S. investors Completed, Strengthening
Balance Sheet: Cash Balance of ~A$82 million at end of quarter.
▪ U.S. Listing Progression: ADR program established on OTCQX with capital structure aligned ahead of a
potential NASDAQ listing; PCAOB audit progressing toward targeted completion in December quarter.
▪ Strategic Portfolio Optimisation: Pomme Project farmed-out via a joint venture structure, consistent with
a capital-light strategy to monetise legacy exploration assets.
MTM Managing Director & CEO, Michael Walshe, commented: “Execution has been the clear focus this quarter,
with commissioning advancing and processing campaigns directly informing optimisation across the flowsheet.
The next key milestone is multi-reactor operation, which will represent a critical step in validating scalability and
progressing from pilot operations to a deployable, scalable processing platform. While further optimisation,
endurance testing and engineering refinement will continue as part of the scale-up, this milestone materially de-
risks the pathway to commercial deployment. We also strengthened the commercial platform, securing a long-
term offtake with Indium Corporation and a binding feedstock agreement with Glencore, establishing both sides of
the value chain.”
For the period ending 31 March 2026
2
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
1. OPERATIONS & COMMISSIONING
Gator Point Technology Campus (Chambers County, Texas)
The Technology Campus continues to advance toward integrated operation, with ongoing parallel efforts across
technology development, commissioning, construction and system integration. Activities during the period have
focused on bringing together pre-processing, FJH and post-processing into a cohesive flowsheet, with increasing
operational continuity supporting ongoing optimisation of performance and efficiency.
Supporting infrastructure across the site, including electrical systems, water management, laboratories and
processing areas, has continued to be developed and refined in parallel with commissioning. Engineering and
design efforts remain focused on ensuring the system is configured for safe, reliable and scalable operation as the
Company progresses toward steady-state processing.
As the facility evolves, the scope and capability of the processing platform have expanded to incorporate additional
upstream and downstream stages, as well as increased overall capacity. This includes continued development of
systems required to support chlorine-based processing pathways, with appropriate engineering controls and
specialist input to ensure safe handling and operational flexibility as the platform scales.
Fig. 1: Texas technology campus photos (Feb 2026).
Fig. 2: Demonstration line at Gator Point with vent hood (Feb 2026).
3
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
FJH DEVELOPMENT: Good progress was achieved during the quarter, with over 40 FJH processing campaigns
completed across a range of feedstocks, including printed circuit boards and catalytic converter scrap. These
campaigns generated a substantial body of high-quality data, providing important insights into system behaviour,
process control and performance under varying conditions. Initial commercial-scale feedstock has also been
delivered to site, supporting the transition from controlled testing toward operational readiness and progression
toward multi-unit operation.
This work is driving ongoing refinement of operating parameters across the flowsheet, including feed handling,
pre-heating, reactor performance, gas management and downstream recovery circuits. Progressive improvements
are being realised in system stability, controllability and repeatability, with increasing confidence in the integration
of upstream, FJH and post-processing stages.
In parallel, optimisation, commissioning and engineering efforts continue to focus on configuring systems for
reliable and scalable operation. This includes targeted electrical and infrastructure upgrades to support parallel
reactor operation, with learnings from test work informing optimisation of current flowsheet and future design
enhancements. Moreover, selected material streams are being assessed through third-party pre-processing
pathways to support flexibility in feed preparation and optimise overall system performance.
Fig. 3: Assortment of ‘raw’ printed circuit board feedstock utilised for wet commissioning
The next key milestone is the demonstration of multi-reactor operation. Successful parallel operation of multiple
units will validate the core scaling logic of the technology, confirming that performance, control and stability can
be maintained across an integrated system as additional reactors are brought online. This includes demonstrating
consistent operating conditions, independent unit performance and stable system behaviour under increased
processing load.
This phase of work is expected to coincide with ongoing commissioning and optimisation activities across the
broader flowsheet, as the Company continues to progress toward more integrated and continuous operation.
Achieving sustained multi-unit operation will provide a higher level of confidence that the platform can be scaled
in a predictable and controlled manner, supporting the transition toward demonstration of larger throughput
scenarios over time.
Collectively, this milestone represents an important step in progressing from pilot-scale operation toward a
repeatable and scalable processing platform, where future growth is driven by modular expansion and execution.
This milestone is targeted for the June quarter. The following high-level schedule illustrates the indicative
sequencing of key workstreams as commissioning and scale-up activities evolve
4
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Fig. 4: Indicative development and commissioning schedule across key flowsheet modules
OTHER: During the quarter, the Company strengthened its execution capability with the appointment of Hunt,
Guillot & Associates (HGA) as Owner’s Engineer for the Gator Point Technology Campus. HGA, a U.S.-based
engineering and project delivery firm, has already been engaged on the project for some time, supporting utilities
and balance-of-plant engineering and will now assume an expanded, site-wide EPCM (Engineering, Procurement
and Construction Management) Owner’s Engineer role. The engagement provides an integrated delivery model
covering project management, construction management, engineering design, utilities completion, commissioning
and operational readiness support, under a flexible resourcing structure. HGA is already mobilised on site, with
access to project data and actively progressing gap assessment and project execution planning activities. The
expanded scope includes responsibility for contractor coordination and interface management, supporting a more
structured and de-risked pathway to delivery as the project advances toward operations.
To support the next phase of growth, Metallium has continued to expand its operational and technical capabilities.
During the period, the Company added key roles across engineering, technology development, laboratory
operations, construction management and government affairs, strengthening internal capacity as the project
advances toward operations. In parallel, the Company is further enhancing its execution capability through
partnerships with specialised engineering, environmental and project delivery groups. These partnerships support
critical workstreams including gas handling systems, facility design, permitting and safe materials management as
the site scales.
The Company also completed an operating model transformation and organisational restructure to provide a
platform to support its growth and strengthen accountability across engineering, delivery and operational
readiness. Collectively, these initiatives position Metallium to progress toward steady-state operations with a more
robust and scalable execution platform.
Figure 5: Flash Metals USA staff at entrance of Gator Point facility
5
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
2. COMMERCIAL AGREEMENTS & PARTNERSHIPS
GLENCORE - BINDING ESCRAP SUPPLY AGREEMENT
Metallium’s U.S. subsidiary executed its first binding long-term feedstock supply agreement with Glencore for
the delivery of up to 2,400 tonnes per annum of e-scrap. The agreement:
• Provides secure, contracted feedstock during commissioning and initial operations.
• Establishes a scalable foundation for future multi-line deployment.
• Reflects customary commercial terms for secondary materials.
Discussions toward a complementary binding offtake agreement continue, aimed at establishing a fully integrated
commercial model linking feedstock supply through to end-product sales.
In parallel, the Company remains engaged with multiple counterparties regarding additional PCB supply, providing
flexibility to supplement contracted volumes and support future capacity expansion. As commissioning progresses
and throughput increases, the Company expects to progressively build a diversified and scaleable feedstock
portfolio, reducing reliance on any single supplier and underpinning the development of multi-line operations at
Gator Point and future deployment sites.
OFFTAKE AGREEMENT WITH INDIUM CORPORATION
During the quarter, Metallium executed a long-term offtake agreement with Indium Corporation, a leading U.S.-
based refiner and manufacturer of critical materials for semiconductor and advanced electronics markets. The
agreement has an initial 10-year term and covers the supply of multiple metals recovered via the Company’s FJH
process, including gallium, germanium, gold, copper, tin and indium.
This agreement represents a key step towards commercialising Metallium’s U.S. recycling platform, establishing a
structured pathway to monetise recovered metals as the Company scales operations. Importantly, pricing is based
on formula-linked mechanisms aligned to commodity markets, providing transparency while retaining exposure to
underlying metal prices.
Strategically, the offtake aligns Metallium with growing U.S. policy focus on securing domestic supply chains for
critical and defence-related materials. Gallium and germanium are essential inputs for semiconductors, defence
systems and AI infrastructure. The agreement positions Metallium as an emerging supplier within a U.S.-aligned,
non-concentrated processing ecosystem. Separate discussions are underway with Indium Corporation regarding
supply of feedstock materials.
STRONG BUSINESS DEVELOPMENT PIPELINE
The Company continues to see strong and increasing commercial interest across its technology platform, with
multiple counterparties progressing testing programs and evaluating potential commercial arrangements across a
range of feedstocks. Engagement spans both waste-derived materials and strategic metal streams, including
printed circuit boards, platinum group metals (PGM)-rich catalytic converters, various types of electronic scrap,
defence technology industrial production scrap, and several mineral processing opportunities. Discussions are
focused on processing solutions, feedstock supply agreements and downstream offtake pathways.
Several counterparties have progressed beyond initial engagement into structured testwork and evaluation
phases, supporting a maturing pipeline of potential commercial opportunities. This progression reflects growing
confidence in the technology’s capability to deliver scalable processing solutions and its relevance to emerging
supply chain requirements for critical and precious metals.
As commissioning advances and operational capacity increases, the Company expects this pipeline to convert
progressively into commercial agreements.
6
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
3. U.S. GOVERNMENT PROGRAM – GALLIUM RECOVERY
During the quarter, the Company successfully completed Phase I of its Small Business Innovation Research (SBIR)
program with the U.S. Department of War through the Defense Logistics Agency. The program focused on
demonstrating the recovery of gallium from semiconductor and electronic waste streams using Metallium’s Flash
Joule Heating technology, with all technical milestones achieved or exceeded.
Completion of the program represents an important validation of the Company’s technology platform within a U.S.
federal framework, demonstrating its capability to address critical material supply challenges and operate within
defence-related programs. The work further reinforces the applicability of the technology to high-value, strategic
metals such as gallium and germanium, which are essential for semiconductors, advanced communications and
defence systems.
The program also establishes a pathway for continued engagement with U.S. government agencies, including the
potential progression to Phase II funding and further development opportunities aligned with domestic critical
minerals and supply chain priorities. NOTE: Notification about the successful completion from the Department of
War was received after 31 March 2026.
Figure 6: High purity Gallium Oxide powder product recovered from Gallium-bearing scrap feedstock using FJH process
4. INTELLECTUAL PROPERTY
Metallium strengthened its intellectual property position during the quarter through an expanded licensing
agreement with Rice University.
The expanded licence incorporates additional FJH applications, including:
• Antimony recovery
• Platinum group metals (PGMs)
• Solar cell recycling
This expands the Company’s technology capability across additional high-value feedstocks
7
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
5. CORPORATE, CAPITAL MARKETS & GOVERNMENT RELATIONS
Capital Raise and Pro-Forma Cash Position
Metallium successfully completed a A$75 million strategic capital raise cornerstoned by U.S. investors, in
January 2026. Proceeds from the raise materially strengthen the Company’s financial position and are being
directed toward commissioning, staged ramp-up of operations at the Texas Technology Campus, working
capital, and ongoing technology development.
As at 31 March 2026, the Company held cash and cash equivalents of approximately A$82 million.
Government Grants and Strategic Engagement
Metallium advanced engagement with U.S. federal and state stakeholders during the quarter.
Key initiatives include:
• Engagement with EXIM and Department of Commerce
• Development of a multi-plant U.S. deployment strategy
• Progression of non-dilutive funding opportunities
• Canadian expansion discussions
The Company remains aligned with U.S. priorities around domestic processing, supply chain resilience and
critical minerals security.
6. OUTLOOK
The June quarter 2026 will focus on:
• Demonstration of multiple FJH reactors operating in parallel, representing a key scale-up milestone.
• Continued commissioning and optimisation across the flowsheet.
• Progression toward ~8,000 tpa run-rate demonstration.
• Execution of additional feedstock and offtake agreements.
7. MINERAL ASSETS
No exploration or field activities were undertaken across Metallium’s mineral projects during the quarter, as the
Company continues to focus capital and resources on the commercialisation of its FJH technology in the United
States.
POMME RARE EARTHS PROJECT - CANADA
During the quarter, the Company progressed the optimisation of its legacy exploration portfolio through the
execution of a binding option and earn-in agreement with New Frontier Minerals Ltd over the Pomme Rare Earth
Element (REE) Project in Québec, Canada. The transaction is consistent with the Company’s capital-light strategy,
enabling value realisation from non-core assets while retaining exposure to exploration success, potential
processing revenues and longer-term royalty streams.
8
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Under the structure, New Frontier may earn up to a 90% interest through defined technical and investment
milestones, while Metallium retains a residual interest and potential royalty exposure linked to future production.
Metallium also maintains a strategic role as processing and technology partner, providing a pathway to apply its
Flash Joule Heating technology to metallurgical testwork and downstream development.
Project location
Tenement
Reference
Status
Equity at
31 Dec 2025
Equity at
31 Mar 2026
Changes during the
quarter
AUSTRALIA
Western Australia
Mt Monger Project
E 25/5251
Live 100% 100%
E 25/5311
Live 100% 100%
E 25/5321
Live 100% 100%
E 25/5361
Live 100% 100%
E 25/5621
Live 80% 80%
E 25/5651
Live 100% 100%
E 25/6031
Live 100% 100%
P 25/24891
Live 100% 100%
P 25/24901
Live 100% 100%
East Laverton Project
E 38/3302 Live 100% 100%
E 38/34622
Live 51% 51%
E 38/34662
Live 51% 51%
E 38/34992
Live 51% 51%
E 38/37652
Live 100% 100%
West Arunta Project
E 80/5858 Live 100% 100%
E 80/5874 Live 100% 100%
E 80/5875 Live 100% 100%
Mukinbudin Project
E 70/6048 Live 100% 100%
E 70/6359 Live 100% 100%
1
The Company has entered into an option agreement with Trumpeter Resources Pty Ltd (“Trumpeter”) granting Trumpeter the option
to acquire 100% of Metallium’s tenement interest in the Mt Monger region of Western Australia. The option has been exercised and
is subject to completion.
2
The Company has entered into a tenement sale agreement with Reedom Pty Ltd (“Reedom”) to sell its interest in 4 exploration
licences within the Company’s East Laverton project area in Western Australia. The agreement is subject to completed.
9
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Project location Claim Title # Status
Equity at
31 Dec 2025
Equity at
31 Mar 2026
Changes during the
quarter
CANADA
Quebec
Pomme Project
CDC121 Live - -
CDC122 Live - -
CDC1005980 Live - -
CDC1005982 Live - -
CDC1005983 Live - -
CDC2234423 Live - -
CDC2234424 Live - -
CDC2234425 Live - -
CDC2234426 Live - -
CDC2234427 Live - -
CDC2234428 Live - -
CDC2234429 Live - -
CDC2234430 Live - -
CDC2234431 Live - -
CDC2234432 Live - -
CDC2234433 Live - -
CDC2240300 Live - -
CDC2240301 Live - -
CDC2240302 Live - -
CDC2240303 Live - -
CDC2240304 Live - -
CDC2240305 Live - -
CDC2240306 Live - -
CDC2240307 Live - -
CDC2240309 Live - -
CDC2240310 Live - -
CDC2240311 Live - -
CDC2240312 Live - -
CDC2240313 Live - -
CDC2458316 Live - -
CDC2458327 Live - -
CDC2458328 Live - -
CDC2458329 Live - -
CDC2458330 Live - -
10
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Project location Claim Title # Status
Equity at
31 Dec 2025
Equity at
31 Mar 2026
Changes during the
quarter
CDC2458331 Live - -
CDC2458332 Live - -
CDC2458333 Live - -
CDC2458334 Live - -
CDC2458345 Live - -
CDC2458346 Live - -
CDC2458349 Live - -
CDC2522460 Live - -
CDC2598360 Live - -
CDC2754413 Live 100% 100%
CDC2754414 Live 100% 100%
CDC2757444 Live 100% 100%
CDC2757445 Live 100% 100%
CDC2757446 Live 100% 100%
CDC2784081 Live 100% 100%
CDC2784082 Live 100% 100%
ASX Additional Information
• Exploration Activities – ASX Listing Rule 5.3.1:
− Total exploration expenditure for the quarter was $19,000 (refer to Item 2.1(d) of the
accompanying Appendix 5B), comprising tenement holding costs and associated expenditure
across the Company’s Australian and Canadian mineral assets.
• Mine Production Activities – ASX Listing Rule 5.3.2:
− There were no mine production or development activities undertaken during the quarter.
• Payments to Related Parties – ASX Listing Rule 5.3.5:
− The aggregate amount of payments to related parties and their associates during the quarter was
$235,000 (refer to Item 6 of the accompanying Appendix 5B).
Referenced Metallium ASX Releases:
21/01/2026 A$75 Million Capital Raising Cornerstoned by US Institutions
12/01/2026 Sponsored Level 1 ADR Program Established with BNY
05/01/2026 Binding e-Waste Feedstock Supply Agreement with Glencore
12/02/2026 NFM: Binding Option to Acquire 90% of Advanced Pomme REE
10/03/2026 Industrial Scale-Up Advancing Rapidly at Texas Tech Campus
31/03/2026 Offtake Agreement with Indium Corp for Gallium & Germanium
11
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Michael Walshe
Managing Director & CEO
Metallium Ltd
info@MetalliumInc.com | +61 8 6391 0112
Andrew Keys
Investor Relations & Corporate Communications
Keys Thomas Associates
Andrew.keys@keysthomas.com | +61 400 400 380
ABOUT METALLIUM LIMITED
Metallium Ltd (ABN 27 645 885 463), is pioneering a low-carbon, high-efficiency approach to recovering critical and
precious metals from mineral concentrates and high-grade waste streams. The company’s patented Flash Joule Heating
(FJH) technology enables the extraction of high-value materials, including gallium, germanium, antimony, rare earth
elements, and gold, from feedstocks such as refinery scrap, e-waste, and monazite.
Aligned with U.S. strategic supply chain objectives, Metallium has recently secured its first commercial site in Texas via
its wholly owned subsidiary, Flash Metals USA Inc., marking a major step toward near-term production and revenue
generation.
To learn more, visit:
Website: metalliuminc.com
Contact: info@metalliuminc.com | +61 8 6391 0112
Investor Hub: investorhub.metalliuminc.com
𝕏 x.com/Metallium_MTM
www.linkedin.com/company/metalliumltd
USA Office: 12 Greenway Plaza, Suite 1100, Houston, Texas USA 77046
Australia Office: Unit 4, 22 Railway Road, Subiaco, Western Australia 6008
Appendix 5B
Oil and Gas Exploration Entity Quarterly Report
Rule 5.5
ASX Listing Rules Appendix 5B (01/12/19) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
ACN 645 885 463
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
METALLIUM LIMITED
ABN Quarter ended (“current quarter”)
27 645 885 463 31 March 2026
Consolidated statement of cash flows Current quarter
A$’000
Year to date
(9 months)
$’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation (if expensed)
(b) development - -
(c) production - -
(d) staff costs (1,734) (4,508)
(e) administration and corporate costs (3,830) (6,822)
1.3 Dividends received (see note 3) - -
1.4 Interest received 527 923
1.5 Interest and other costs of finance paid (73 (236)
1.6 Income taxes paid - -
1.7 Research and development refunds - -
1.8 Other (provide details if material) (9) (33)
(a) Technology development expenditure (629) (1,033)
(b) Other 2 (31)
1.9 Net cash from / (used in) operating
activities
(5,738) (11,708)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
A$’000
Year to date
(9 months)
$’000
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (11,758) (28,501)
(d) exploration & evaluation (if capitalised) (19) (138)
(e) investments (100) (100)
(f) other non-current assets (3,309) (7,512)
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - 189
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(15,185) (36,061)
3. Cash flows from financing activities
73,851 122,660
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities - -
3.3 Proceeds from exercise of options 3,577 7,466
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(4,647) (7,962)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
A$’000
Year to date
(9 months)
$’000
3.9 Other (provide details if material) – lease
payments
(42) (131)
3.10 Net cash from / (used in) financing
activities
72,738 122,033
Consolidated statement of cash flows Current quarter
A$’000
Year to date
(9 months)
$’000
4. Net increase / (decrease) in cash and cash
equivalents for the period
4.1 Cash and cash equivalents at beginning of
period 29,818 7,335
4.2 Net cash from / (used in) operating
activities (item 1.9 above) (5,738) (11,673)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) (15,185) (36,061)
4.4 Net cash from / (used in) financing activities
(item 3.10 above) 72,738 122,033
4.5 Effect of movement in exchange rates on
cash held 507 507
4.6 Cash and cash equivalents at end of period 82,140 82,140
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
Current quarter
$’000
Previous quarter
$’000
5.1 Bank balances 82,140 29,818
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above) 82,140 29,818
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
6. Payments to director of the entity and their associates Current quarter
$'000
6.1 Aggregate amount of payments to directors and their associates
included in item 1
(235)
6.2 Aggregate amount of payments to directors and their associates
included in item 2
-
6.3 Include below any explanation necessary to understand the transactions included in items
6.1 and 6.2
Explanation regarding the transactions included in items 6.1 above:
Director fees paid (incl. statutory superannuation)
Explanation regarding the transactions included in items 6.2 above:
N/A
7. Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the
entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Total facility amount
at quarter end
$’000
Amount drawn at
quarter end
$’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $’000
8.1 Net cash from / (used in) operating activities (Item 1.9) (5,738)
8.2 Capitalised exploration & evaluation (Item 2.1(d)) (19)
8.3 Total relevant outgoings (Item 8.1 + Item 8.2) (5,756)
8.4 Cash and cash equivalents at quarter end (Item 4.6) 82,140
8.5 Unused finance facilities available at quarter end (Item 7.5) -
8.6 Total available funding (Item 8.4 + Item 8.5) 82,140
8.7 Estimated quarters of funding available (Item 8.6 divided by
Item 8.3)
14.3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 5
+ See chapter 19 of the ASX Listing R
Share your feedback
Discover