Excellent Progress on US-Based Technology Demonstration Plant
mtmcriticalmetals.com.au
▪ Design Progress: Process and mechanical design criteria on track for completion by end
of February 2025,
with key engineering milestones achieved to advance towards long-lead equipment procurement thereafter.
▪ Site Selection: Extensive search underway across Gulf Coast USA for a suitable commercial premises, with
several areas already shortlisted & initiatives afoot to secure existing industrial site to expedite timelines.
▪ Targeted Operations: Start-up of the inaugural plant remains on track for Q4 2025.
▪ Strategic Site Focus on Texas, USA: Pro-business environment, streamlined permitting, skilled workforce,
world-class infrastructure, and strong legacy in chemical processing provide unparalleled advantages.
▪ Engagement with technology parks & development authorities across Gulf Coast States to explore potential
infrastructure support & incentives, aligned with advanced manufacturing & STEM job creation initiatives.
▪ MTM is also actively evaluating U.S. Government funding programs designed to accelerate the reshoring of
critical materials & advanced manufacturing, supporting domestic supply chain security and innovation.
▪ Regulatory Advantages: Anticipated favourable conditions under the new Trump Administration to support
critical metals extraction and onshoring initiatives, particularly in pro-business Gulf Coast States.
▪ Operational Leadership: CEO Michael Walshe is currently in Texas with US President Steve Ragiel & MTM’s
partner KnightHawk Engineering for plant design review, strategic planning and site adjudication sessions.
ENGAGE WITH THIS ANNOUNCEMENT HERE
MTM Critical Metals Limited (“MTM” or the “Company”) (ASX: MTM; OTCXB: MTMCF) is pleased to provide
an interim update on the progress of the 1-ton-per-day (1 TPD) Flash Joule Heating (FJH) Demonstration
Plant, which is a critical milestone in the Company’s commercialisation strategy for its advanced critical
metals extraction technology. The first plant is provisionally planned for Houston, Texas, USA.
The Company is pleased to report that the process and mechanical design criteria for the Demonstration Plant
is on target for completion by the end of February 2025. Remaining detailed design elements will be finalised
over the ensuing weeks in the optimisation phase, with procurement activities set to commence in March for
long-lead item and run in parallel. Plant start-up remains on schedule and is provisionally planned for Q4 2025.
MTM Managing Director & CEO, Michael Walshe, said: “The demonstration plant is a key enabler for several
strategic partnerships that MTM is actively pursuing, and for advancing our ambition to re-shore metals like
gallium, back to America. It will greatly enhance our ability to demonstrate the commercial scalability of our
technology, reinforcing our position as a preferred partner for feedstock supply and offtake agreements.
“We are actively engaging with technology parks and development authorities across several Gulf Coast states
to explore opportunities for leveraging pre-existing facilities and securing incentive funding support. These
efforts align with the region’s strong focus on advanced manufacturing and STEM job creation, fostering greater
support for initiatives like ours and potentially accelerating the plant’s development and operational success.
“The US ‘onshoring of manufacturing’ movement continues to gain traction, with anticipated strong support from
the Trump Administration for critical and strategic technology metals, including gallium, germanium, indium, and
rare earth elements (REEs). MTM is well-positioned to capitalise on this policy direction, providing a secure
and sustainable supply chain solution for these vital materials using homegrown American technology”.
Engage with this announcement on our investor hub: https://investorhub.mtmcriticalmetals.com.au/announcements
ASX: MTM | OTCQB: MTMCF
Site Selection and Development Investigations
MTM’s management team is actively evaluating locations for its Demonstration Plant, with a strong focus on
Texas and the Gulf Coast region, and preliminary plans centred on Houston. Renowned for its pro-business
environment, the region offers a compelling combination of advantages, including streamlined permitting, access
to world-class infrastructure, and a deep talent pool specialising in engineering and advanced technologies.
The Gulf States extensive history as a global leader in energy and industrial processing, coupled with its ongoing
transformation into a hub for technology innovation, positions it as an ideal location for MTM’s facility. The
region’s established logistics network—encompassing major ports, rail, and highways—ensures seamless
integration into domestic and international supply chains, while its supportive business ecosystem fosters
collaboration across industries. These factors make it an unparalleled choice for scaling advanced critical metals
recovery technologies like Flash Joule Heating.
To further accelerate the project, MTM is engaging with key stakeholders, including regional development
authorities and industrial park operators. These discussions are aimed at potentially securing infrastructure
support and financial incentives that will enhance the project’s economic and operational viability. MTM’s
strategic ambition is to leverage the Gulf Coast states’ strengths to establish a world-class metal processing
facility addressing critical supply chain challenges, while creating high quality STEM employment from Texas,
USA born-“tough tech”.
Targeted Start-Up Date
MTM is on schedule to provisionally commence operations at the demonstration plant by Q4 2025. This
milestone is a critical step in advancing the Company's broader strategic objectives to scale its Flash Joule
Heating technology. The demonstration plant will validate the technology at scale, providing potential clients with
tangible proof of its efficiency and capabilities. It will also serve as a key enabler for securing commercial
contracts, including partnerships for feedstock supply and product offtake.
Favourable Regulatory Environment & Departmental Support
Under the anticipated policy framework of the new Trump Administration, MTM expects favourable regulatory
conditions for critical metals extraction initiatives. The administration’s focus on strengthening domestic supply
chains for critical minerals and promoting innovative technologies is expected to support the rapid deployment
of projects such as MTM’s FJH Demonstration Plant.
MTM is actively evaluating U.S. government funding Opportunities, including programs from the Department of
Energy (DOE) and the Department of Defense (DOD), aimed at accelerating the reshoring of critical materials
and advanced manufacturing. The DOE's recent $725M initiative to enhance domestic processing and
manufacturing of battery-critical materials, along with the DOD's use of the Defense Production Act to fortify
critical supply chains, underscores the growing federal commitment to reducing reliance on foreign sources,
strengthening U.S. industrial capacity, and securing supply chains for critical and strategic materials1.
By leveraging these opportunities, the Company aims to position itself as a leader in advanced manufacturing
and critical metals innovation. With a U.S.-invented technology and U.S.-centric operations, MTM is wellpositioned to support domestic supply chain resilience and technological advancement.
U.S. Department of Energy (DOE) (2025), 'DOE issues notice of intent for funding to strengthen domestic critical materials processing', U.S. Department of Energy,
https://www.energy.gov/mesc/articles/doe-issues-notice-intent-funding-strengthening-domestic-critical-materials-processing.
1
U.S. Department of Defense (DOD) (2025), 'DOD leverages Defense Production Act to galvanize critical supply chains', U.S. Department of Defense, https://www.defense.gov/News/NewsStories/Article/Article/3985393/dod-leverages-defense-production-act-to-galvanize-critical-supply-chains/.
2
ASX: MTM | OTCQB: MTMCF
On-the-Ground Presence
MTM Managing Director and CEO Michael Walshe is currently in Texas, USA, alongside MTM’s US President,
Steve Ragiel and the KnightHawk Engineering team. The visit includes operational and strategic planning sessions
and process design reviews to ensure the project progresses smoothly and in alignment with the Company’s
commercialisation goals. MTM remains committed to delivering its 1 TPD FJH Demonstration Plant on schedule
and achieving key milestones that position it as a leader in US-centric sustainable critical metals extraction
technology.
The Bigger Picture
This facility serves as a cornerstone of MTM’s commercialisation strategy, capitalising on the unmatched
industrial ecosystem and pro-manufacturing policy environment of Texas and neighbouring Gulf Coast states to
deliver cutting-edge metal processing technology. The region's strong alignment with federal initiatives to reshore critical mineral supply chains, coupled with growing geopolitical focus on securing domestic access to
technology metals, provides a uniquely supportive climate for advanced manufacturing projects like ours. By
establishing this demonstration plant in a region renowned for industrial innovation and logistical excellence,
MTM is well-positioned to contribute to a sustainable and secure supply chain for these essential materials.
Fig 1. Conceptual artist’s impression of the FJH Demonstration Plant
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Michael Walshe
Managing Director & CEO
MTM Critical Metals Ltd
info@mtmcriticalmetals.com.au
+61 8 6391 0112
3
ASX: MTM | OTCQB: MTMCF
ABOUT MTM CRITICAL METALS LIMITED
MTM Critical Metals Limited (ABN 27 645 885 463), is an ASX & OTCQB-listed company with management teams in Perth, Western
Australia, and Texas, USA, and specialises in advanced metal recovery technologies. MTM’s 100%-owned USA subsidiary Flash Metals
USA Inc is based in Texas, USA. MTM possess exclusive licensing rights to the innovative Flash Joule Heating technology, a cutting-edge
metal recovery and mineral processing method developed by esteemed researchers at Rice University, USA. Additionally, MTM holds
exploration assets prospective for niobium (Nb), rare earth elements (REE), and gold, strategically located in Western Australia and
Québec.
•
Flash Joule Heating (FJH) is an advanced electrothermal process that enhances metal recovery and mineral processing
compared to traditional methods. By rapidly heating materials in a controlled atmosphere, FJH efficiently extracts metals like
lithium from spodumene, gallium from scrap, and gold from e-waste, among others. This technology has the potential to
revolutionise metal recovery by reducing energy consumption, reagent use, and waste, offering a more economical and
environmentally friendly alternative.
•
MTM’s West Arunta Nb-REE exploration assets are situated in one of Australia’s premier exploration hotspots, where over $60
million has been invested by ASX-listed companies such as WA1 Resources, Encounter Resources, Rio Tinto (in JV with Tali
Resources), and IGO Limited. MTM also holds tenements in other key mineral regions across Western Australia, including the
Mukinbudin Nb-REE Project, East Laverton Gold & Base Metals Project, and Mt Monger Gold Project. In Québec, the Pomme
Project is a highly promising carbonatite intrusion rich in REE and niobium, located near the world-class Montviel deposit.
To learn more, visit:
Website:
https://www.mtmcriticalmetals.com.au/
MTM’s Investor Hub:
https://investorhub.mtmcriticalmetals.com.au/
Contact:
info@mtmmetals.com.au
Australia:
Suite 2, 38 Colin Street, West Perth, Western Australia 6005
USA:
12 Greenway Plaza, Suite 1100, Houston, Texas USA 77046
|
+61 8 6391 0112
PREVIOUS DISCLOSURE
The information in this announcement is based on the following MTM Critical Metals Limited ASX announcements, which are all available
from the MTM Critical Metals Limited website www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
Date
Description
30 October 2024
Progress Update on 1 TPD Demonstration Plant
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original
ASX announcements and that all material assumptions and technical parameters underpinning the relevant ASX announcements continue
to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are represented have not been materially modified from the original ASX announcements.
4
ASX: MTM | OTCQB: MTMCF
CAUTIONARY STATEMENT REGARDING VALUES & FORWARD-LOOKING INFORMATION
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective judgment and
analysis and assumption. MTM Critical Metals does not accept any liability in relation to any such matters, or to inform the Recipient of
any matter arising or coming to the company’s notice after the date of this document which may affect any matter referred to herein. Any
opinions expressed in this material are subject to change without notice, including as a result of using different assumptions and criteria.
This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of
words such as “seek”, “anticipate”, “believe”, “plan”, “expect”, and “intend” and statements than an event or result “may”, “will”, “should”,
“could”, or “might” occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and
economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forwardlooking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity
prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the
date the statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements for events or
circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. The Recipient
should not place undue reliance upon forward-looking statements. Any estimates or projections as to events that may occur in the future
(including projections of revenue, expense, net income and performance) are based upon the best judgment of MTM Critical Metals from
information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved.
Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as,
a promise or representation as to the past or future. MTM Critical Metals, its affiliates, directors, employees and/or agents expressly
disclaim any and all liability relating or resulting from the use of all or any part of this document or any of the information contained
herein.
5
Share your feedback
Discover