Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
31st July, 2023
ASX: MTM
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 JUNE 2023
Highlights:
High-resolution drone magnetic survey completed over Pomme Project
carbonatite target in Quebec, Canada
10 hole, 5,000 metre diamond drilling program commenced to evaluate
carbonatite complex and discover higher-grade REE-Nb mineralisation
zones
First hole intersected +500m of carbonatite containing visual REE
mineralisation, assays pending
Aircore drilling identified new clay-hosted rare earth element (REE)
mineralisation at East Laverton Project, Western Australia
New nickel laterite discovery at Seahorse prospect area
Tranche two of a $3 million placement completed to fund diamond
drilling and associated metallurgical work at Pomme REE-Nb project
The directors of MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) are pleased
to provide shareholders with the quarterly report on the Company’s exploration activities for
the period ending 30 June 2023.
During the reporting period the Company announced that it had commenced exploration
activities at the Pomme REE-Nb project in Canada, including a significant diamond drilling
program. Results of a drilling program at the East Laverton indicated additional zones of clayhosted REE mineralisation and identified a new nickel laterite deposit.
Table 1: Summary of Quarterly Work Program Status.
Project
Program
Target
Status
Pomme
Diamond drilling
REE-Nb
Field camp established.
Drill rig mobilised and first drill hole completed.
East Laverton
Aircore and RC
percussion drilling
REE, Ni
Assay results received for drilling program.
Rehabilitation of previous drill sites and access
tracks completed.
Mt Monger
NA
Gold
Rehabilitation of previous drill sites and access
tracks completed.
Ravensthorpe
NA
REE, Li, Ni, Gr
No fieldwork completed.
P: +61 (0)8 6391 0112
MTM Critical Metals Limited (ABN 27 645 885 463)
E: info@mtmcriticalmetals.com.au
W: www.mtmcriticalmetals.com.au
Suite 2, 38 Colin Street, West Perth, 6005, Australia
@MTM Critical
@MTM Critical Metals
POMME REE-Nb PROJECT
The Pomme REE-Nb project (Pomme or the Project) is a known carbonatite intrusion located
in south-western Québec, Canada (Figure 1). The Project has exceptional results from a
limited historical drilling program, showing enrichment in rare earth elements (REE) and
niobium (Nb) and is considered to be an extremely prospective exploration target. Pomme is
located adjacent to the world-class Montviel REE-Nb deposit (owned by Geomega Resources
Inc), that has a defined total indicated and inferred resource of 266 Mt @ 1.45% TREO &
0.14% Nb2O5.
MTM has entered into a binding option agreement with Geomega Resources to acquire a
100% interest in the Pomme claims and is now advancing exploration at Pomme to discover
a REE-Nb resource (see MTM ASX announcement dated 23 February 2023).
Figure 1: Pomme REE-Nd project location.
Drone Magnetic Survey
The high-resolution drone magnetic survey of the interpreted Pomme carbonatite was
commissioned from geophysical contractor Vision 4K. The survey was completed in late
March 2023 and comprised approximately 220 line kilometres, flown on 25 metre line spacing
at a sensor height of approximately 22 metres (tree-top height).
The full survey report and finalised magnetic data has been received by the Company from
Vision 4K. Initial images (see Figure 2) indicate that the survey has provided detailed and
high-quality information which improves on the available airborne magnetic survey data.
Page 2
The drone survey was designed to cover the extent of the carbonatite and will allow the
Company to model both the geological and the REE mineralisation magnetic responses.
Furthermore, it may potentially provide an exploration vector as the magnetics can be
progressively correlated with the underlying geology.
Figure 2: Preliminary drone magnetic survey images. Left - Total Magnetic Intensity (TMI); Right
- TMI 1st Vertical Derivative
Figure 3: Drone magnetic survey operations at the Pomme REE-Nb project in early April 2023
(courtesy Vision 4K).
Page 3
Diamond Drilling Program
The Company received approval for a maiden drilling program at the Pomme REE-Nb project
from the Québec Ministère des Ressources naturelles et des Forêts (MRNF, Ministry of
Natural Resources and Forests) in April 2023 (see MTM ASX announcement dated 17 April
2023). A suitable drilling contractor was subsequently engaged for the work (see MTM ASX
announcement dated 24 April 2023) and a field camp was established for the drilling
operations.
The program of diamond drilling commenced at Pomme in late May 2023 (see MTM ASX
announcement dated 26 May 2023). The first drill hole of that program, POM-23-01 (Figure
5), was collared approximately 100 metres to the north of a historical drill hole MVX-12-01 and
was subsequently completed at a depth of 558 metres downhole.
Beneath 32 metres of glacial cover POM-23-001 intersected in excess of 500 metres of
carbonatite containing visible rare earth element (REE) mineralisation (see MTM ASX
announcement dated 6 June 2023). This hole is currently being geologically logged and
sampled for assay.
Figure 4: Diamond drill rig operational on hole POM-23-001 at the Pomme project, May 2023.
In the latter part of the reporting period drilling operations were temporarily suspended for
safety reasons due to forest fires that are active in the vicinity of the project area. Société de
protection des forêts contre le feu (SOPFEU), the government authority that manage activity
in the forests, initially ordered all commercial activities within the forest to cease.
Unfortunately, fire conditions continued to deteriorate and the field team, like many others,
was requested to evacuate from the area.
Page 4
The field team and drillers were subsequently given approval to return to site in mid-July 2023
(see MTM ASX announcement dated 14 July 2023). Since then, the drill rig has completed a
number of additional drill holes, including in areas that have not previously been tested. Visual
REE mineralisation has also been observed in these drill holes, indicating that the mineralised
system extends over more than 1km to the north of the first drill hole (see MTM ASX
announcement dated 28 July 2023).
Figure 5: Diamond drilling status at the Pomme project showing historical and current diamond
drill hole collar locations.
Visible REE Mineralisation
Visible REE mineralisation was observed in all rock types, in varying abundance, over the full
length of carbonatite intersected in hole POM-23-01 to EOH. The REE mineralisation has
been identified by the geologists on-site, who have extensive prior experience with the geology
of the Montviel REE-Nb deposit located approximately 7 km south of Pomme. Their
observations have been routinely cross-checked using a hand-held pXRF device, which has
confirmed the presence of REE’s.
The mineralisation, which is tentatively identified as the fluoro-carbonate minerals cebaite
(Ba3(Nd,Ce)2(CO3)5F2) and/or bastnaesite ((La,Ce,Y)CO3F), has a very distinct red colour and
is easily distinguished in the drill core (see Figures 6 to 8). Monazite ((La,Ce,Nd)PO4), a
brownish phosphate REE mineral, also occurs frequently in the first hole and apatite enriched
in REE was locally logged within specific carbonatite layers. The mineralisation occurs as
medium to coarse-grained disseminations and blebs.
Page 5
Figure 6: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within ferrocarbonatite/calciocarbonatite host rock. Hole POM23-01, Box 15, 91.1 – 95.5 metres downhole depth.
Mineralisation was locally logged with up to 20% visual abundance in the drill core, though
typically ranged from 1% to 5% abundance over decimetre to metre scales. A number of
zones from 10 metres to 20 metres thickness (downhole length) were estimated to contain
“medium grade” REE oxide, considered to be approximately 0.5% to 1% total rare earth
element (TREO) content.
Figure 7: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within silicocarbonatite host rock. Hole POM-23-01, Box 3, 39.0
– 43.5 metres downhole depth.
Page 6
Figure 8: Diamond drill core (NQ, approximately 4.8 cm diameter) containing REE mineralisation
(red coloured disseminations) within ferrocarbonatite host rock. Hole POM-23-01, Box 104,
475.6 – 479.9 metres downhole depth.
Further Work
Diamond drilling is continuing at Pomme. A total of 10 holes for approximately 5,000 metres
of drilling are planned as a first-pass test of the Pomme carbonatite complex and the REE-Nb
mineralisation (see MTM ASX announcement dated 26 May 2023). The program is expected
to require a further two months to complete.
An initial batch of half-core drilling samples has been submitted to the laboratory for assay.
Results are expected to be available early in the next quarter. Geological logging and
sampling of the rest of the drill core from POM-23-01 and subsequent drill holes is in progress.
Samples will be transferred to a sample preparation facility in the city of Val d’Or in due course.
As additional drill core has become available, the Company is also assessing the initial
metallurgical test work program that can be undertaken to assess the mineralogy of the
deposit, leaching characteristics and a possible processing workflow.
Page 7
EAST LAVERTON PROJECT
The East Laverton project is centred about 70km south-east of the townsite of Laverton (Figure
9) and is comprised of twelve granted exploration licences that collectively cover an area of
approximately 3,500km2. Due to extensive transported cover, the project area has had limited
historical exploration, despite being surrounded by existing and emerging world class gold
camps. The Company has identified an emerging district-scale REE mineralisation
opportunity at Pt Kidman in the north of the project area and both gold and base metals
anomalies in the Seahorse prospect area.
Figure 9: East Laverton Project location diagram showing prospect areas.
During the reporting period the Company received the results for a substantial program of
aircore (AC) and reverse circulation (RC) percussion drilling completed during the previous
quarter at the Pt Kidman prospect area in the north and the Seahorse prospect in the southeast
of the tenements.
Pt Kidman REE Exploration
A total of 174 aircore drill holes and 6 RC holes were completed at the Pt Kidman prospect
(Figure 10). The drilling was designed to extend the zones of known REE mineralisation
located approximately 30km northeast of Laverton.
Drilling successfully identified further broad zones of shallow REE mineralisation hosted by
saprolitic clays above interpreted fertile basement granitoids and gneissic rocks (see MTM
ASX Announcement dated 15 May 2023). Assays indicate significant total rare earth element
oxide (TREO) grades, within clay thickness intervals up to 29m using a 1000ppm TREO cutoff grade (Table 1). At a lower cut off grade of 300ppm TREO the drilling has defined multiple
broad zones of REE mineralisation that show good continuity (see cross sections shown on
Figures 11 to 13).
Page 8
Overall, Magnet Rare Earth Oxides (MREO) make up an average of 24.4% of TREO, with
Critical Rare Earth Oxides (CREO) averaging 21.7%, Heavy Rare Earth Oxides (HREO)
averaging 11.4% and Neodymium-Praseodymium oxide (NdPr) averaging 19.5% of TREO.
Figure 10: Gridded surface TREE geochemistry image at the Point Kidman prospect, showing
the location of previous and recently completed drilling.
Table 1: Selected significant REE intersections from the East Laverton AC drilling program.
Hole ID
23ELAC043
23ELAC057
23ELAC059
23ELAC060
23ELAC127
23ELAC134
23ELAC137
23ELAC138
23ELAC140
23ELAC141
23ELAC142
23ELAC145
23ELAC146
23ELAC174
From
(m)
13
22
17
22
24
35
16
11
5
1
16
4
0
1
35
53
To
(m)
19
27
24
26
25
41
26
40
12
13
27
9
29
9
39
60
Interval
(m)
6
5
7
4
1
6
10
29
7
12
11
5
29
8
4
7
TREO
(ppm)
1,424
1,168
1,623
3,400
8,752
1,368
1,507
1,667
2,756
2,564
2,753
1,388
2,116
1,483
1,515
1,173
HREO
(%)
9.4
8.8
6.9
7.4
6.3
11.3
7.1
6.3
6.3
5.7
6.4
5.4
4.9
6.3
7.4
7.5
MREO
(%)
28.0
28.8
26.6
22.7
22.0
25.9
22.7
24.1
25.2
22.1
22.3
21.2
20.8
22.5
25.4
20.5
CREO
(%)
23.1
22.9
20.9
18.4
17.2
22.5
18.5
18.8
19.6
17.4
18.0
16.6
16.1
18.1
20.2
17.4
Nd+Pr
(%)
23.3
24.1
22.8
18.9
18.4
20.7
19.4
20.8
21.8
19.2
19.2
18.4
18.1
19.4
21.6
17.4
Downhole intervals shown, interpreted to be approximately true widths. Appropriate rounding of grade values has
been applied. Significant intersections are based on a 1,000ppm TREO cut-off grade with no internal dilution.
Page 9
TREO (Total Rare Earth Oxide) grade includes CeO2, Dy2O3, Er2O3, Eu2O3, Gd2O3, Ho2O3, La2O3, Lu2O3, Nd2O3,
Pr2O3, Sm2O3, Tb2O3, Tm2O3, Yb2O3 and Y2O3 and is calculated using standard oxide conversion factors for each
element (see Appendix V).
HREO (Heavy Rare Earth Oxide) grade includes Eu2O3, Gd2O3, Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3
and Y2O3. Shown as percentage of TREO.
MREO (Magnet Rare Earth Oxide) grade includes Nd2O3, Pr2O3, Sm2O3, Gd2O3, Tb2O3, Dy2O3, and Ho2O3. Shown
as percentage of TREO.
CREO (Critical Rare Earth Oxide) grade includes Nd2O3, Eu2O3, Tb2O3, Dy2O3 and Y2O3. Shown as percentage of
TREO.
Nd+Pr (Neodymium-Praseodymium or NdPr) includes Nd2O3 and Pr2O3. Shown as percentage of TREO.
Figure 11: Cross section diagram on 6,859,578mN showing aircore drilling, interpreted geology
and REE mineralisation.
Preliminary Metallurgical Test Work Program
The Company has initiated preliminary metallurgical test work to characterise the REE’s
identified within clays at its Pt Kidman prospect (see MTM ASX announcement dated 21 June
2023). The proposed metallurgical work will enable the Company to make informed decisions
on the potential economic viability of this mineralisation.
The work involves undertaking industry-standard leach tests under different reagent schemes
to:
a) Characterise the REEs by host phase (ion exchange, colloidal, or mineral);
b) Determine the REE recoveries; and
c) Outline a preliminary process flowsheet if favourable results are obtained.
Testing will be carried out by Independent Metallurgical Operations (IMO) who have extensive
experience with REE metallurgy including clay characterisation test work for ASX-listed
Page 10
clients. The leaching test work will be conducted on 4 composite samples selected from the
aircore drill holes (16 tests in total). Final leach test assay results are expected early in the
next quarter.
Figure 12: Cross section diagram on 6,861314mN showing aircore drilling, interpreted geology
and REE mineralisation.
Figure 13: Cross section diagram on 6,858,268mN showing aircore drilling, interpreted geology
and REE mineralisation.
Page 11
Seahorse Prospect Nickel Laterite Discovery
Results from the aircore drilling program completed at the Seahorse prospect area (Figure 14)
confirm the discovery of nickel laterite mineralisation (see MTM ASX announcement dated 19
May 2023). The mineralisation appears to be geologically similar to other known nickel laterite
deposits in Western Australia. These deposits are formed through the weathering and
oxidation of ultramafic rock units that contain nickel in the primary mineral assemblage.
Assays from the drilling show significant nickel intersections (Table 2), with numerous 1m
zones in excess of 1% Ni and a maximum of 2.2% Ni from 23ELAC176 (13-14m depth). Nickel
mineralisation was intersected over downhole widths of up to 28 metres (using a 5,000ppm or
0.5% Ni cut-off grade) and shows continuity along a strike length of in excess of 1km (Figures
15 and 16). The width of the prospective zones is locally in excess of 200m (Figure 16).
Based on regional airborne magnetic data, the interpreted host ultramafic units extend over at
least 3km and most of this extent is still untested by drilling.
Locally elevated cobalt, chrome and REE mineralisation was also observed in the aircore drill
holes. This mineralisation was not always coincident with the zones of nickel mineralisation,
though is also considered to be enrichment related to the same weathering process that has
affected the host ultramafic rock.
Figure 14: Seahorse nickel prospect drill status diagram overlain on TMI magnetic image.
Page 12
Figure 15: Seahorse Nickel prospect long section.
Figure 16: Seahorse Nickel prospect cross section.
Tenement Status
During the reporting period the Company successfully completed the Stage 1 Earn In
expenditure on the three exploration licences held by Tevel Pty Ltd (Tevel) in the East
Laverton project area (see MTM ASX announcement dated 14 June 2023).
Under the Earn In and Joint Venture agreement (Agreement) between the two companies,
MTM has now earned a 51% interest in the licences and is required to pay Tevel a further
$50,000. MT M has advised Tevel that the Company will now continue with the Stage 2 Earn
In phase under the Agreement, which requires the Company to i) expend a further $1 million
over 3 years on the Tenements, and 2) complete a bankable feasibility study within 5 years,
in order to earn a further 24% equity in the Tenements.
Page 13
Table 2: Selected significant intersections from the East Laverton Seahorse AC drilling program.
Hole ID
23ELAC175
incl.
incl.
23ELAC176
incl.
23ELAC177
incl.
23ELAC179
23ELAC181
23ELAC183
incl.
incl.
23ELAC185
incl.
23ELAC186
23ELAC189
23ELAC191
incl.
incl.
23ELAC193
incl.
23ELAC226
From
(m)
11
11
12
28
8
10
2
1
12
16
16
8
4
20
22
21
23
21
12
8
12
16
12
4
36
16
20
16
48
52
60
To
(m)
28
14
28
39
36
20
23
6
24
20
20
16
16
52
31
31
28
26
40
40
32
32
44
48
44
27
27
24
60
60
64
Interval
(m)
17
3
16
11
28
10
21
5
12
4
4
8
12
32
9
10
5
5
28
32
20
16
32
44
8
11
7
8
12
8
4
Nickel
(%)
0.92
Cobalt
(%)
Chrome
(%)
TREO
(ppm)
0.07
0.68
1,261
0.95
0.10
0.97
1,545
0.65
1,113
0.65
0.63
0.70
0.85
0.72
0.91
0.07
1,532
0.97
1.08
0.16
0.65
0.13
1.09
1,401
0.88
1.28
1,234
1,375
1,850
1,356
Downhole intervals shown, true width not yet known. Appropriate rounding of grade values has been applied.
Significant intersections are based on a 5,000ppm nickel, 500ppm Co, 5,000ppm Cr and 1,000ppm TREO cut-off
grade with internal dilution not exceeding 2 consecutive samples (e.g. 2m where 1m samples have been assayed).
TREO (Total Rare Earth Oxide) grade includes CeO2, Dy2O3, Er2O3, Eu2O3, Gd2O3, Ho2O3, La2O3, Lu2O3, Nd2O3,
Pr2O3, Sm2O3, Tb2O3, Tm2O3, Yb2O3 and Y2O3 and is calculated using standard oxide conversion factors for each
element (see Appendix V).
Further Work
The results of the preliminary metallurgical test work program for REE mineralisation at the Pt
Kidman project are expected to be received early in the next quarter and will be assessed and
integrated into the ongoing program of work for this area.
Further soil sampling will be implemented to evaluate the areas to the east and south of the
current geochemical survey area at Pt Kidman. Based on the observed geology of the area,
further REE anomalies are expected to be defined. Subject to obtaining statutory approvals
and heritage clearances from the local Native Title holders, additional drilling will be
undertaken to test any new geochemical anomalies that are identified.
Consideration will also be given to a program of infill drilling in several high priority areas
identified by drilling to-date, where there is the potential to define a coherent mineral resource.
Page 14
Further sampling of the nickel mineralisation at the Seahorse prospect has been completed
(1m drilling samples) in order to better define the grade and distribution of mineralisation where
only composite samples have been assayed. Assay results are expected to be available early
in the next quarter.
The Company will also consider a further program of infill and extensional drilling at the
Seahorse nickel prospect to define the extent of the nickel laterite mineralisation and
determine if it contains potential for a nickel-cobalt resource. A suitable ground-based
electromagnetic (EM) survey may be undertaken to determine if there are any significant
conductors along the strike of the ultramafic unit that could be indicative of deeper sulfide
drilling targets.
RAVENSTHORPE PROJECT
The project areas are located within the Albany-Fraser Orogen of Western Australia, between
the regional towns of Esperance, Ravensthorpe and Jerramungup (Figure 17). The project
comprises a total of eleven granted exploration licences and one exploration licence
application in three main areas; Young River, Dalyup and Bremer.
Regionally, the basement rocks in the area are referred to as the Munglinup Gneiss, a complex
package of Archean rocks including granites and greenstone remnants that have been
strongly overprinted by later Proterozoic deformation and metamorphism.
The Ravensthorpe project is prospective for a suite of battery metals, including lithium,
graphite, nickel-copper-PGE, REE and gold mineralisation. There are numerous active mining
operations, project developments and exploration projects in the region.
Figure 17: Ravensthorpe Project location map showing tenement locations, major nickel, gold,
base metal, lithium and graphite mining operations and development projects.
Page 15
No fieldwork was completed at the Ravensthorpe project during the quarter. The Company is
continuing to assess effective exploration techniques and a strategy to obtain access to priority
exploration areas.
MT MONGER PROJECT
The Mt Monger Gold Project is centred approximately 45km east-northeast of Kambalda and
70km to the southeast of Kalgoorlie-Boulder, within the Goldfields Region of Western
Australia. The project comprises six granted exploration licences, two pending exploration
licenses and three granted prospecting licences, covering an area of about 100km2 (Figure
18).
The Mt Monger region has proven potential for hosting gold, with gold mining commencing in
the area during the late 1890s and continuing to the present day. The Mt Monger Gold Project
is within close proximity to Gold Fields Limited’s (JSE:GFI) St Ives gold camp and adjacent to
the Silver Lake Resources Ltd (ASX:SLR) Daisy Milano gold operation and their currently
operating 1.2Mtpa Randalls gold processing facility. Lefroy Exploration Limited (ASX:LEX,
Lefroy) has experienced recent exploration success at their Burns Prospect, located to the
south of the Mt Monger Gold Project.
Figure 18: Location diagram of the Mt Monger Project showing tenements and known gold
occurrences.
Rehabilitation of drilling pads and access tracks was completed at the Mt Monger project
during the quarter. The Company is continuing to assess recent drilling results and to target
mineralised structures that have the potential to host a significant gold resource.
Page 16
CORPORATE
Financial Commentary
The Quarterly Cashflow Report (Appendix 5B) for the current period provides an overview of
the Company’s financial activities.
Exploration expenditure for the current period was $540,000 (Previous quarter - $533,000).
This is expected to increase in the current quarter (ending 30 September) as a result of
increased drilling activities in Canada and Australia. The total amount paid to directors and
their associates in the period (item 6.1 of the Appendix 5B) was $132,000 and includes salary,
directors’ fees and superannuation, consulting fees, office rent and administration.
Cash at 30 June 2023 was $2.56 million.
Capital Structure
Tranche 2 of a Placement was completed following approval from shareholders at a general
meeting held on 20 April 2023. The placement raised $3 million (before costs) from the issue
of 30 million shares at A$0.10 per share. Following completion of the Placement, the listed
shares and options on issue are as follows:
Class
Ordinary Shares
Options (MTMO)
Exercise Price – A$0.25, Expiry 26/11/24)
Number on Issue
Number under
Escrow
98,380,053
52,830,875
1,333,330
Nil
Quarterly Expenditure Review Compared with IPO Use of Funds
In accordance with ASX LR 5.3.4, MTM provides a summary of its expenditure for the quarter
ending 30 June 2023 compared with its Use of Funds statement in the IPO Prospectus dated
21 May 2021.
Table 3: MTM Expenditure Summary
Use of Funds
(Section 1.3 of Prospectus)
(A$’000)
Yr 1
Exploration Expenditure
Q3 Funds
Used
(A$’000)
Funds Used
Total to Date
(A$’000)
Yr 2
1,527
1,416
610
3,309
Directors Fees
292
313
91
777
General Administration and
Working Capital
293
273
262
1,592
Expense of Offer
508
-
-
530
Vendor Payments
415
-
-
565
Loan Repayments
355
-
-
374
3,390
2,002
963
7,147
TOTAL
This announcement has been authorised for release by the Board of Directors.
Page 17
For further information, please contact:
Lachlan Reynolds
Managing Director
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: lachlan.reynolds@mtmmetals.com.au
Simon Adams
Company Secretary
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: simon.adams@mtmmetals.com.au
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for rare earth elements
(REE), gold, lithium, nickel, and base metals in the Goldfields and Ravensthorpe districts of Western Australia and
in the Abitibi region of the Province of Québec. The Company holds over 4,500km2 of tenements in three prolific
and highly prospective mineral regions in Western Australia and has an option to acquire, through an earn-in
arrangement, a 100% interest in 2,400 ha of exploration rights in Québec, Canada. The East Laverton Projects is
made up of a regionally extensive package of underexplored tenements prospective for REE, gold and base metals.
The Mt Monger Gold Project comprises an area containing known gold deposits and occurrences in the Mt Monger
area, located ~70km SE of Kalgoorlie and immediately adjacent to the Randalls gold mill operated by Silver Lake
Resources Limited. The Ravensthorpe Project contains a package of tenements in the southern part of Western
Australia between Esperance and Bremer Bay which are prospective for a range of minerals including REE, lithium,
nickel and graphite. The Pomme project in Québec is a known carbonatite intrusion that is enriched in REE and
niobium and is considered to be an extremely prospective exploration target adjacent to a world class REE resource
(Montviel deposit). Priority drilling targets have been identified in all project areas and the Company is well funded
to undertake effective exploration programs. The Company has an experienced Board and management team
which is focused on discovery to increase value for Shareholders.
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents
information compiled by Mr Lachlan Reynolds. Mr Reynolds is the Managing Director of MTM Critical Metals
Limited and is a member of both the Australasian Institute of Mining and Metallurgy and the Australasian Institute
of Geoscientists. Mr Reynolds has sufficient experience of relevance to the styles of mineralisation and types of
deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Reynolds consents to the inclusion in this announcement of the matters
based on information in the form and context in which they appear.
Previous Disclosure
The information in this announcement is based on the following MTM Critical Metals Limited (formerly Mt Monger
Resources Limited) ASX announcements, which are all available from the MTM Critical Metals Limited website
www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
23 February 2023, “Mt Monger to Acquire Advanced Carbonatite REE-Nb Project in Canada”
17 April 2023, “Permit for Diamond Drilling Approved at the Pomme REE-Nb Project, Quebec”
24 April 2023, “Diamond Drilling Contractor Secured for the Pomme REE-Nb Project, Quebec”
9 May 2023, “Drone Magnetic Survey Completed at the Pomme REE-Nb Project”
15 May 2023, “Drilling Confirms Further Rare Earth Element Mineralisation and Increased Potential at
East Laverton”
19 May 2023, “Laterite Nickel Discovery at East Laverton”
26 May 2023, “Drilling Commences at the Pomme REE-Nb Project, Quebec”
6 June 2023, "Over 500 Metres of REE Mineralisation Intersected in First Diamond Drill Hole at the
Pomme Project"
14 June 2023, “MTM Completes Stage 1 Earn In on Key REE Exploration Licences at East Laverton”
15 June 2023, “Pomme Project Diamond Drilling Update”
21 June 2023, “Metallurgical Test Work Initiated on REE-Enriched clays at East Laverton”
4 July 2023, “Pomme REE-Nb Carbonatite Drilling Update”
14 July 2023, “Pomme REE-Nb Project Diamond Drilling Program to Recommence”
28 July 2023, “Diamond Drilling at Pomme REE-Nb Project Extends Known Mineralised Zones”
Page 18
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original ASX announcements and that all material assumptions and technical parameters
underpinning the relevant ASX announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are represented have not been
materially modified from the original ASX announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of
subjective judgment and analysis and assumption. MTM Critical Metals does not accept any liability in relation to
any such matter