East Laverton REE Metallurgical Test Work Initiated
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
21st June, 2023
ASX: MTM
METALLURGICAL TEST WORK INITIATED ON REEENRICHED CLAYS AT EAST LAVERTON
Highlights:
Metallurgical test work commenced on recently drilled rare earth element
(REE) enriched clays from the Pt Kidman prospect, East Laverton project.
The program aims to characterise the REE species present within the
significant clay intervals (up to 29 metres true width) identified from near
surface and determine:
o What fraction of the REE’s are “ionic” (recoverable by ionic desorption
leach);
o What fraction of the REE’s are in the more refractory colloidal & mineral
phases; and
o How temperature, acid concentration & pH influence REE recovery
Conducting test work at this early stage enables MTM to ascertain the
preliminary viability of clay-hosted REE recovery.
MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) has initiated preliminary
metallurgical test work to characterise the REE’s identified within clays at its Pt Kidman
prospect, part of the East Laverton project, located in the northern Eastern Goldfields of
Western Australia (Figure 1).
The Company has identified several zones of shallow, laterally continuous clay-hosted REE
mineralisation at Pt Kidman through recent aircore drilling programs (see MTM ASX
announcements dated 19 August 2022, 17 November 2022 and 15 May 2023). The proposed
metallurgical work will enable the Company to make informed decisions on the potential
economic viability of this mineralisation.
The work involves undertaking industry-standard leach tests under different reagent schemes
(Table 1) to:
a) Characterise the REEs by host phase (ion exchange, colloidal, or mineral);
b) Determine the REE recoveries; and
c) Outline a preliminary process flowsheet if favourable results are obtained.
Testing will be carried out by Independent Metallurgical Operations (IMO) who have extensive
experience with REE metallurgy including clay characterisation test work for ASX-listed
clients.
P: +61 (0)8 6391 0112
MTM Critical Metals Limited (ABN 27 645 885 463)
E: info@mtmcriticalmetals.com.au
W: www.mtmcriticalmetals.com.au
Suite 2, 38 Colin Street, West Perth, 6005, Australia
@MTM Critical
@MTM Critical Metals
Commenting on the metallurgical test work program, Managing Director Lachlan Reynolds
said:
“Conducting metallurgical testing on the rare earth element mineralisation at Pt Kidman
is imperative for understanding the future of the project’s development and for the
exploration strategy over the whole East Laverton project.
MTM has discovered district-scale development of REE-enriched clays at East Laverton
and metallurgical testing of the clay is now appropriate to assess the leaching
characteristics of the mineralisation, which may vary from place to place within the overall
project area.
The key test will be to determine the ionic dedsorption potential of the REE
mineralisation. MTM wants to ensure that the leaching conditions that are required to
extract the REE’s are potentially economically viable.”
Figure 1: Overview of the Pt Kidman prospect showing district-scale REE geochemical
anomalies and the location of MTM drill holes.
The leaching test work will be conducted on 4 composite samples selected from the aircore
drill holes (16 tests in total) and is anticipated to be completed during June 2023. Final leach
test assay results are expected in July 2023.
This announcement has been authorised for release by the Board of Directors.
Page 2
For further information, please contact:
Lachlan Reynolds
Managing Director
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: lachlan.reynolds@mtmmetals.com.au
Simon Adams
Company Secretary
MTM Critical Metals Limited
Tel: +61 (0)8 6391 0112
Email: simon.adams@mtmmetals.com.au
Table 1: Metallurgical Test Work Outline
Test
Purpose
Reagents
(Lixiviant)
Reagents
(Acid)
pH
Temp.
(oC)
Time
(h)
1
Leach any REE Ionicly
Exchangeable phase present
1.0M (NH4)2SO4 +
1.0M NaCl
H2SO4 to
maintain pH
at ~4
4
25
(ambient)
6
2
Test if increased temp. and pH
improve recoveries of the REE
Ion Exchange phase
1.0M (NH4)2SO4 +
1.0M NaCl
H2SO4 to
maintain pH
at ~1
1
50
6
3
Test if REEs within the Colloid
phase (insoluble oxides or
hydroxides) are leachable
1.0M NaCl
25g/t HCL
<1
50
6
4
Test if REE’s within the
Mineral phase (insoluble
oxides or hydroxides) are
leachable.
1.0M NaCl
100g/t HCL
~0
50
6
Figure 1: Location map of the East Laverton Project showing the known REE mineralised area
at the Pt Kidman prospect.
Page 3
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for rare earth elements
(REE), gold, lithium, nickel, and base metals in the Goldfields and Ravensthorpe districts of Western Australia and
in the Abitibi region of the Province of Québec. The Company holds over 4,500km2 of tenements in three prolific
and highly prospective mineral regions in Western Australia and has an option to acquire, through an earn-in
arrangement, a 100% interest in 2,400 ha of exploration rights in Québec, Canada. The East Laverton Projects is
made up of a regionally extensive package of underexplored tenements prospective for REE, gold and base metals.
The Mt Monger Gold Project comprises an area containing known gold deposits and occurrences in the Mt Monger
area, located ~70km SE of Kalgoorlie and immediately adjacent to the Randalls gold mill operated by Silver Lake
Resources Limited. The Ravensthorpe Project contains a package of tenements in the southern part of Western
Australia between Esperance and Bremer Bay which are prospective for a range of minerals including REE, lithium,
nickel and graphite. The Pomme project in Québec is a known carbonatite intrusion that is enriched in REE and
niobium and is considered to be an extremely prospective exploration target adjacent to a world class REE resource
(Montviel deposit). Priority drilling targets have been identified in all project areas and the Company is well funded
to undertake effective exploration programs. The Company has an experienced Board and management team
which is focused on discovery to increase value for Shareholders.
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents
information compiled by Mr Lachlan Reynolds. Mr Reynolds is the Managing Director of Mt Monger Resources
Limited and is a member of both the Australasian Institute of Mining and Metallurgy and the Australasian Institute
of Geoscientists. Mr Reynolds has sufficient experience of relevance to the styles of mineralisation and types of
deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Reynolds consents to the inclusion in this announcement of the matters
based on information in the form and context in which they appear.
Previous Disclosure
The information in this announcement is based on the MTM Critical Metals Limited (formerly Mt Monger Resources
Limited) prospectus and the following ASX announcements, which are all available from the MTM Critical Metals
Limited website www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
19 August 2022, “Aircore Drilling Confirms Widespread REE Mineralisation at East Laverton”
17 November 2022, “Assays Confirm Rare Earth Element Mineralisation and District-Scale Potential at
East Laverton”
15 May 2023, “Drilling Confirms Further Rare Earth Element Mineralisation and Increased Potential at
East Laverton”
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original ASX announcements and that all material assumptions and technical parameters
underpinning the relevant ASX announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are represented have not been
materially modified from the original ASX announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of
subjective judgment and analysis and assumption. MTM Critical Metals does not accept any liability in relation to
any such matters, or to inform the Recipient of any matter arising or coming to the company’s notice after the date
of this document which may affect any matter referred to herein. Any opinions expressed in this material are subject
to change without notice, including as a result of using different assumptions and criteria. This document may
contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of
words such as “seek”, “anticipate”, “believe”, “plan”, “expect”, and “intend” and statements than an event or result
“may”, “will”, “should”, “could”, or “might” occur or be achieved and other similar expressions. Forward-looking
information is subject to business, legal and economic risks and uncertainties and other factors that could cause
actual results to differ materially from those contained in forward-looking statements. Such factors include, among
other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal
risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the
statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements
for events or circumstances that occur subsequent to such dates or to update or keep current any of the information
contained herein. The Recipient should not place undue reliance upon forward-looking statements. Any estimates
or projections as to events that may occur in the future (including projections of revenue, expense, net income and
performance) are based upon the best judgment of MTM Critical Metals from information available as of the date
of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results
will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied
upon as, a promise or representation as to the past or future. MTM Critical Metals, its affiliates, directors, employees
and/or agents expressly disclaim any and all liability relating or resulting from the use of all or any part of this
document or any of the information contained herein.
Page 4
Share your feedback
Discover