ASX RELEASE
6 May 2024
FLASH JOULE HEATING PROTOTYPE TEST SIGNIFICANTLY
INCREASES REE RECOVERY (Amended)
Initial FJH prototype testing shows material improvement in metal
recovery from coal fly ash
Highlights:
• Flash Joule Heating (FJH) prototype testing has produced significant increases in the acid leachability of
Rare Earth Elements (REE) and target Critical Metals from Coal Fly Ash (CFA) samples.
• CFA samples treated by the FJH prototype delivered a +50% increase in the recovery of REE and Critical
Metals.
• Initial testing successfully conducted at 50x scale up from Rice University’s proof of concept.
• Ongoing testing will provide technical and performance data for MTM to progress the design of the Pilot
FJH Plant.
• MTM will conduct additional Prototype FJH testing on waste sources of REE and Critical Metals including
Bauxite Residue, E-Waste and end of life Lithium-Ion Batteries
MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) has received results from testing of coal fly
ash (CFA) samples using Flash Joule Heating (FJH). FJH processes improve the acid leachability of rare
earth elements (REE) by over 50% and a range of critical metals by between 50% and 514% when compared
to traditional acid leach methods.
MTM Chairman, Mr John Hannaford said: “These promising initial results from coal fly ash samples treated
with flash joule heating show the value in our recent acquisition that included this industry-leading technology.
This innovative approach holds the potential to transform the current methods used by the industry to recover
critical metals from waste materials. We look forward to providing updates on the technology, as we scale
operations to service a range of applications.”
Flash Metals USA President, Mr Steve Ragiel said: “We are thrilled with the progress of our Flash Joule
Heating prototype testing, demonstrating significant increases in the extraction of rare earth elements and
critical metals from coal fly ash. We have validated the Rice University results, showing the technology has the
potential to dramatically increase the leaching recovery of metals from waste materials that are otherwise very
difficult to treat, all while using significantly less acid. Processing of samples from additional metals remains
ongoing. We look forward to continuing our testing and advancing towards commercial scale opportunities.”
RARE EARTHS AND NIOBIUM IN QUEBEC AND WESTERN AUSTRALIA.
Test work method and results
The FJH protype unit was designed and fabricated by KnightHawk Engineering (KnightHawk) in Houston, Texas
and verified in consultation with the developer of the technology, William Marsh Rice University (Rice) a
prominent industrial technology research institution also based in Houston. The Prototype sample test volumes
represent an approximate 50x increase in scale versus previous proof of concept testing performed by Rice.
Approximately 60 kilograms of coal fly ash (CFA) sourced from North Dakota, USA, was utilised as a basis for
the current round of FJH testing. The CFA samples were tested using both a standard leach process to
determine an approximate metal recovery using conventional acid leach methods, as well as treating the CFA
with the FJH technology.
Preliminary results showed that the CFA treated with FJH resulted in a 50% recovery increase in REE, and
importantly, a 72% increase for neodymium when compared to control samples. Several other important
critical metals also showed enhanced leach recoveries, including cobalt (+73%), lithium (+50%), nickel (+99%),
rubidium (+113%), scandium (+103%) and titanium (+514%). This is of particular significance given the
current market price of Rubidium is $108,000/kg1 and the MREE element Neodymium, is currently
US$68,800/tonne2.
Importantly, the CFA material treated with FJH technology shows significant promise for delivering higher
recoveries in the leaching process when compared to recovery processes on the same material which has
not undergone FJH processing. The ability of FJH to reduce the acid requirements in the leaching process
offers both potential cost savings and for the generation of less waste. Future testing will be able to
quantify both the energy and reagent savings in the leaching process.
MTM, in conjunction with KnightHawk and Rice University, will continue to test CFA samples using the data to
help refine and improve the technology with the aim of increasing recovery rates. The technical and
performance data from these tests will provide valuable information for MTM to advance the design of a larger
Pilot FJH Plant.
MTM will also look to commence testing of the FJH technology on other waste sources of REE and critical
metals including bauxite residue (red mud), e-waste and end of life lithium-ion batteries. The initial results
from the prototype testing, coupled with the strong pricing dynamics of the metals recovered from the CFA
material, highlight the economic potential of FJH.
Flash Joule Heating
FJH is an advanced processing and recycling technology being developed to extract critical metals including
REE, titanium, nickel, cobalt and lithium from waste material including lithium-ion batteries, e-waste, coal fly
ash produced by coal-fired power stations or bauxite residue derived from alumina refining.
The FJH technology is an electro-chemical process that involves the rapid and intense heating of material to
both directly recover critical metals and make materials more amenable to metal recovery through
conventional acid leaching methods. The FJH technology that is being licensed to MTM uses proprietary
1
Shanghai Metals Market - Rubidium (Rb>99.5%) hftps://www.metal.com/Other-Minor-Metals/202012250003 as at
2/5/2024 (US$3,099/oz)
2
Shanghai Metals Market - Neodymium (99.0-99.9%) hftps://www.metal.com/Rare-Earth-Metals/201102250470 as at
2/5/2024
2
intellectual property in the flash process enabling the extraction of various metals including REE’s, Lithium
and other valuable precious and industrial metals. The FJH technology incorporates a range of patent
protected processes around the material preparation, energy application and vaporized component
separation and collection which can be scaled due to the precise control that the FJH prototype module
provides.
MTM has secured the option over the FJH technology via the recent acquisition of Flash Metals Pty Ltd and the
Company is currently finalising a global licencing agreement with Rice.
Table 1: Selected CFA leaching results showing the positive effect on metal recovery using FJH technology.
Element
Rare Earth
Elements
(REE)
Other
Elements of
Interest
Nd - Neodymium
Pr - Praseodymium
Dy - Dysprosium
Tb - Terbium
TOTAL MREE
Ce - Cerium
Er - Erbium
Eu - Europium
Gd - Gadolinium
Ho - Holmium
La - Lanthanum
Lu - Lutetium
Sm - Samarium
Tm - Thulium
Y - Yttrium
Yb - Ytterbium
TOTAL REE
Al – Aluminium (%)*
Ba - Barium
Co - Cobalt
Cs - Cesium
Li - Lithium
Ni - Nickel
Rb - Rubidium
Sc - Scandium
Ti - Titanium
V - Vanadium
Head
Grade
(SGS ppm)
72
18
14
2
106
153
8
3
16
3
74
1
15
1
81
7
468
*10
978
45
7
125
102
93
27
5,900
205
Leach Recovery
Results (Pre FJH)
(µg/L)
Leach Recovery
Results (Post FJH)
(µg/L)
% Change
in
Recovery
637
188
367
41
1,233
1,482
277
37
256
86
752
65
149
44
1,346
319
6,046
5,814,146
4,777
558
120
3,248
1,214
1,141
694
1,626
6,052
1,095
285
444
62
1,886
2,377
350
56
367
121
1,197
79
232
58
1,961
381
9,065
9,497,618
3,499
964
333
4,857
2,412
2,427
1,409
9,990
1,320
72
52
21
50
53
60
26
50
44
40
59
22
55
31
46
20
50
63
-27
73
176
50
99
113
103
514
-78
Notes:
Results are preliminary and un-optimised.
Head Grade composition of CFA measured by SGS on a component specific basis (Note Appendix I).
3
* Aluminium is reported in percentage due to the high amount of Aluminium content within the CFA
sample for SGS values.
Appropriate rounding has been applied to the reported values.
The “Leach Recovery Results (Pre FJH)” and “Leach Recovery Results (post FJH)” data were
measured using the KnightHawk standard Acid Leaching procedure (Appendix II) and the PerkinElmer
TotalQuant semi-quantitative ICP-MS procedure (Appendix III) and are typically within ±30% of the
quantitative values.
In the coming weeks, KnightHawk Engineering expects to have more quantitative results utilising
detailed calibration curves for ICP-MS data refinement.
MREE – Magnetic Rare Earth Elements.
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Investors
Craig Sainsbury
Automic Markets
+61 428 550 499
craig.sainsbury@automicgroup.com.au
Media
Tristan Everett
Automic Markets
+61 403 789 096
tristan.everett@automicgroup.com.au
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for niobium (Nb) and rare earth elements (REE)
in Western Australia and Québec. Additionally, the Company has acquired an option to exclusively negotiate the licencing rights to an
early-stage processing technology for REE and precious metals known as Flash Joule Heating, which has been developed by
researchers at Rice University, USA. MTM’s West Arunta Nb-REE licences lie within one of Australia’s critical metal exploration hotspots
where over $60m in exploration expenditure has been collectively invested in the district by a number of ASX companies including WA1
Resources Limited (ASX:WA1), Encounter Resources Limited (ASX:ENR), Rio Tinto Limited (JV with Tali Resources Pty Ltd) (ASX:RIO),
CGN Resources Limited (ASX:CGR), and IGO Limited (ASX:IGO). The Company also holds tenements in other prolific and highly
prospective mineral regions in Western Australia. The Mukinbudin Nb-REE Project comprises two exploration licences located 250km
northeast of Perth in the South West Mineral Field of Western Australia. The East Laverton Projects is made up of a regionally extensive
package of underexplored tenements prospective for REE, gold and base metals. The Mt Monger Gold Project comprises an area
containing known gold deposits and occurrences in the Mt Monger area, located ~70km SE of Kalgoorlie and immediately adjacent to
the Randalls gold mill operated by Silver Lake Resources Limited. In Québec, the Pomme Project is a known carbonatite intrusion that
is enriched in REE and niobium and is considered to be an extremely prospective exploration target adjacent to a world class REE
resource (Montviel deposit). The Company has an experienced Board and management team which is focused on discovery to increase
value for shareholders.
About KnightHawk Engineering
KnightHawk was founded in 1991 and specializes in identifying high technology solutions in a short timeframe. They have executed
projects throughout the United States, Europe, and Asia. Their clients range from individual entrepreneurs to the large industrial
organisations such as Shell, Exxon Mobil, Chevron and NASA. They have a depth of experience and expertise and are leaders in
design, failure analysis and troubleshooting across a range of engineering disciplines. KnightHawk was selected for its expertise
across a wide range of disciplines and their focus on ensuring outcomes in a timely manner.
4
Previous Disclosure
The information in this announcement is based on the following MTM Critical Metals Limited ASX announcements, which are all
available from the MTM Critical Metals Limited website www.mtmcriticalmetals.com.au and the ASX website www.asx.com.au.
Date
Description
27 March 2024
Flash Metals Acquisition, Tranche 2 of the Placement and Convertible Note Settlement Completed
3 April 2024
Flash Joule Heating Prototype Complete, Testing Commenced
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original
ASX announcements and that all material assumptions and technical parameters underpinning the relevant ASX announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are represented have not been materially modified from the original ASX announcements.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective judgment and
analysis and assumption. MTM Critical Metals does not accept any liability in relation to any such matters, or to inform the Recipient of
any matter arising or coming to the company’s notice after the date of this document which may affect any matter referred to herein.
Any opinions expressed in this material are subject to change without notice, including as a result of using different assumptions and
criteria. This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the
use of words such as “seek”, “anticipate”, “believe”, “plan”, “expect”, and “intend” and statements than an event or result “may”, “will”,
“should”, “could”, or “might” occur or be achieved and other similar expressions. Forward-looking information is subject to business,
legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in
forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate,
commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and
opinions at the date the statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking
statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information
contained herein. The Recipient should not place undue reliance upon forward-looking statements. Any estimates or projections as to
events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best
judgment of MTM Critical Metals from information available as of the date of this document. There is no guarantee that any of these
estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing
contained herein is, or shall be relied upon as, a promise or representation as to the past or future. MTM Critical Metals, its affiliates,
directors, employees and/or agents expressly disclaim any and all liability relating or resulting from the use of all or any part of this
document or any of the information contained herein.
5
Appendix I – Coal Fly Ash Composition – SGS methodology
Method Summary
Number of
Samples
3
3
3
3
3
3
1
Method Code
Description
G_WGH_KG
GE_FAI31V5
GE_ICP91A50
GE_IMS91A50
GE_CSA06V
GE_IMS21B20
GO_ICP90Q100
Weight of samples received
Au, Pt, Pd, FAS, exploration grade, ICP-AES, 30g-5mL
Na2O2/NaOH Fusion, 500C, HNO3, ICPAES, 0.1g-50ml, Glassy Carbon crucibles
Na2O2/NaOH Fusion, ICP-MS, Glassy Carbon crucibles
Total Sulphur and Carbon, IR Combustion
Aqua Regia Digest (HCL/HNO3) ICP-MS
Ore grade Na2O2 Fusion, HNO3, ICPAES, 0.2g-100ml
SGS Canada Minerals Barnaby conforms to the requirements of ISO/IEC17025 for specific tests as listed on their scope of accreditation
found at https://www.scc.ca/en/search/laboratories/sgs
Tests and Elements marked with an “@” symbol in the report denote ISO/IEC17025 accreditation.
6
Appendix II – Acid Leach Testing
KnightHawk Standard Procedure Summary
1.
2.
3.
4.
5.
6.
Weigh the total mass of the sample
Sieve through 425 µm mesh to prepare 8.00 grams of powdered sample for acid wash.
Prepare 75 mL of 1.00 M HNO3 Acid in De-ionized water.
Mix the powdered sample with acid and measure the total mixture volume as pre-wash volume.
Heat mixture to 95 oC and maintain at temperature with covering for 4 hours.
Allow mixture to cool and measure total mixture volume as post-wash volume.
o The acid volume lost during the heating process is calculated by equation Eq1.
𝑚𝐿𝐿𝑜𝑠𝑡 = 𝑚𝐿𝑃𝑟𝑒𝑊𝑎𝑠ℎ − 𝑚𝐿𝑃𝑜𝑠𝑡𝑊𝑎𝑠ℎ
(Eq1)
o
The acid volume is normalized for each test N by the ratio in equation Eq2.
75𝑚𝐿 −𝑚𝐿
𝐿𝑜𝑠𝑡
𝐶𝑁 =
75 𝑚𝐿 𝑆𝑡𝑎𝑛𝑑𝑎𝑟𝑑
(Eq2)
7. Separate solution and filter with 0.4 µm material.
8. Measure the pH of the filtered solution to record acid strength.
7
Appendix III – Leach Test Results
ICP-MS Analysis Procedure Summary
1. Filter the sample through a 25 mm Diameter 0.2 µm PVDF membrane syringe filter.
2. Dilute the sample with 2% HNO3 Acid by a 1001x ratio for analysis by ICP-MS.
3. Prepare ICP-MS equipment prewash with 2% HNO3 and daily standard solution for checks on
calibration.
4. Conduct PerkinElmer TotalQuant semi-quantitative multi-elemental analysis in ICP-MS.
o Leach Recovery Results for each element i and each test N are solved via equation Eq3.
𝐿𝑅𝑅𝑖𝑁 =
(Eq3)
[𝐼𝐶𝑃−𝑀𝑆 𝑂𝑢𝑡𝑝𝑢𝑡] µg𝑖
1 𝐿𝐼𝐶𝑃𝑆
∗
1001 𝐿𝐼𝐶𝑃𝑆
1 𝐿𝐴𝑐𝑖𝑑𝑊𝑎𝑠ℎ
∗ 𝐶𝑁