Appointment of New CEO
Released
Released
Announcement PDF
MTM Critical Metals Limited
Suite 2, 38 Colin Street
West Perth WA 6005
Phone +61 8 6391 0112
info@mtmmetals.com.au
ABN 27 645 885 463
ASX: MTM
mtmcriticalmetals.com.au
ASX RELEASE
09 August 2024
MTM APPOINTS HIGHLY CREDENTIALED MINERAL
PROCESSING EXECUTIVE MICHAEL WALSHE AS CEO
Highlights:
Chemical Engineer & MBA Michael Walshe appointed as CEO effective immediately.
Mr Walshe comes from a 15-year career in mineral processing in executive roles with industry leader
Metso (formerly Metso:Outotec), and more recently as CEO of Voltaic Strategic Resources Limited.
Mr Walshe has been assisting the Company with technical review and analysis of minerals processing
opportunities for its highly promising Flash Joule Heating (FJH) technology.
MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) is pleased to announce the appointment of
highly credentialled mineral processing executive Mr Michael Walshe as Chief Executive Officer of the
Company with immediate effect.
Mr Walshe has over 15 years of international experience in engineering, operations, technology
commercialisation, and project development roles across the minerals, chemicals, and renewable energy sectors
with substantial expertise in the design and scale-up of heat transfer equipment.
He brings over a decade of experience with industry leader Metso Outotec, in various technical and senior
management roles, covering all major commodities including lithium, rare earths, gold, and base metals. Mr
Walshe has extensive expertise in process design, metallurgical flowsheet development, and structuring project
finance packages for junior miners via export credit funding. Before joining MTM, he served as CEO of the ASXlisted mineral explorer Voltaic Strategic Resources Ltd from October 2022 until assuming his current role.
Mr Walshe holds a Bachelor of Chemical and Process Engineering (Hons.) from University College Dublin,
Ireland, and a Master of Business Administration (Finance) from the Australian Institute of Business (AIB). He
is a chartered professional engineer with both Engineers Australia and the Institution of Chemical Engineers
(IChemE) and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM).
MTM Chairman, John Hannaford said, “We are delighted that Michael has agreed to join MTM as CEO after
serving in an advisory role for the Company. His extensive network in the mining and metals sector, built during
his time with Metso Outotec, a global leader in technology, equipment and services for the mining and process
industries across all metals, will be crucial to driving MTM in its next phase of growth. Michael’s expertise and
insights have already had a positive impact and we are looking forward to seeing what he can deliver in the CEO
role.”
Michael Walshe added, “I am excited to join MTM at such a pivotal moment in the company’s journey. The
potential of the Flash Joule Heating technology to revolutionise metal recovery is very compelling, and I am
thrilled to lead the company in bringing this innovative process to commercial reality.
`
PIONEERING CRITICAL METALS SUPPLY
“With my background in process technology scale-up, heat transfer equipment, and mineral processing across
a range of commodities, I am confident that this experience is highly complementary to the ambitious goals set
by MTM. The opportunity to apply this expertise to a pioneering technology is both a professional and personal
milestone, with the opportunity to redefine efficiency, sustainability, and economic viability in the metals industry.
“I look forward to working with the MTM team to unlock the full potential of this novel technology for our
shareholders and the broader industry, while also generating value from our portfolio of promising Critical Metal
exploration projects.”
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Investors
Craig Sainsbury
Automic Markets
+61 428 550 499
craig.sainsbury@automicgroup.com.au
Media
Tristan Everett
Automic Markets
+61 403 789 096
tristan.everett@automicgroup.com.au
About MTM Critical Metals Limited
MTM Critical Metals Limited is an exploration company which is focused on searching for niobium (Nb) and rare earth elements (REE) in
Western Australia and Québec. Additionally, the Company has acquired the licencing rights to an early-stage processing technology for
REE and precious metals known as Flash Joule Heating, which has been developed by researchers at Rice University, USA. MTM’s West
Arunta Nb-REE licences lie within one of Australia’s critical metal exploration hotspots where over $60m in exploration expenditure has
been collectively invested in the district by a number of ASX companies including WA1 Resources Limited (ASX:WA1), Encounter
Resources Limited (ASX:ENR), Rio Tinto Limited (JV with Tali Resources Pty Ltd) (ASX:RIO), CGN Resources Limited (ASX:CGR), and
IGO Limited (ASX:IGO). The Company also holds tenements in other prolific and highly prospective mineral regions in Western Australia.
The Mukinbudin Nb-REE Project comprises two exploration licences located 250km northeast of Perth in the South West Mineral Field of
Western Australia. The East Laverton Projects is made up of a regionally extensive package of underexplored tenements prospective for
REE, gold and base metals. The Mt Monger Gold Project comprises an area containing known gold deposits and occurrences in the Mt
Monger area, located ~70km SE of Kalgoorlie and immediately adjacent to the Randalls gold mill operated by Silver Lake Resources
Limited. In Québec, the Pomme Project is a known carbonatite intrusion that is enriched in REE and niobium and is considered to be an
extremely prospective exploration target adjacent to a world class REE resource (Montviel deposit). The Company has an experienced
Board and management team which is focused on discovery to increase value for shareholders.
About KnightHawk Engineering
KnightHawk was founded in 1991 and specializes in identifying high technology solutions in a short timeframe. They have executed
projects throughout the United States, Europe, and Asia. Their clients range from individual entrepreneurs to the large industrial
organisations such as Shell, Exxon Mobil, Chevron and NASA. They have a depth of experience and expertise and are leaders in design,
failure analysis and troubleshooting across a range of engineering disciplines. KnightHawk was selected for its expertise across a wide
range of disciplines and their focus on ensuring outcomes in a timely manner.
Cautionary Statement Regarding Values & Forward-Looking Information
The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective judgment and
analysis and assumption. MTM Critical Metals does not accept any liability in relation to any such matters, or to inform the Recipient of
any matter arising or coming to the company’s notice after the date of this document which may affect any matter referred to herein. Any
opinions expressed in this material are subject to change without notice, including as a result of using different assumptions and criteria.
This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of
words such as “seek”, “anticipate”, “believe”, “plan”, “expect”, and “intend” and statements than an event or result “may”, “will”, “should”,
2
“could”, or “might” occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and
economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forwardlooking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity
prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the
date the statements are made. MTM Critical Metals undertakes no obligation to update these forward-looking statements for events or
circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. The Recipient
should not place undue reliance upon forward-looking statements. Any estimates or projections as to events that may occur in the future
(including projections of revenue, expense, net income and performance) are based upon the best judgment of MTM Critical Metals from
information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved.
Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as,
a promise or representation as to the past or future. MTM Critical Metals, its affiliates, directors, employees and/or agents expressly
disclaim any and all liability relating or resulting from the use of all or any part of this document or any of the information contained
herein.
APPENDIX 1
Remuneration for Mr Michael Walshe
Summary of Key Terms and Conditions of Employment Appointment
Role
The appointment is to the position of Chief Executive Officer of
MTM Critical Metals Limited
Commencement
9 August 2024
Term
The appointment will be on an ongoing basis with termination
notice provisions and probation period summarised below.
Remuneration
Mr Walshe will receive a base annual remuneration of $325,000
plus statutory superannuation contributions.
Incentive bonus
Achieving a market capitalisation of the company of
>$50m within 6 months
$25,000 bonus
>$100m within 12 months
$25,000 bonus
>$200m within 24 months
$50,000 bonus
Notice period
3 months
Probation period
3 months
Performance incentives
Tranche
Performance
Rights
Milestone
Vesting
Period
Expiry
Date
A
2,500,000
Continuous employment with the
Company (or a related body corporate) or
otherwise engaged by the Company (or a
related body corporate) at all times for a
period of 12 months from the date of issue
of the Performance Rights and not serving
out a notice period.
1 years
from the
date of
issue
3 years
from the
date of
issue
3
Tranche
Performance
Rights
Milestone
Vesting
Period
Expiry
Date
B
2,500,000
Continuous employment with the
Company (or a related body corporate) or
otherwise engaged by the Company (or a
related body corporate) at all times for a
period of 24 months from the date of issue
of the Performance Rights and not serving
out a notice period.
2 years
from the
date of
issue
3 years
from the
date of
issue
C
2,500,000
Securing grant funds from a Federal or
State Government body of at least $5
million within 12 months of the
Commencement Date that can be applied
to development of the Flash Joule Heating
technology.
1 years
from the
date of
issue
3 years
from the
date of
issue
D
2,500,000
Securing a development partnership with
a Corporate entity/entities that secures
funding of at least $5 million within 12
months of the Commencement Date that
can be applied to development of the
Flash Joule Heating technology.
1 years
from the
date of
issue
3 years
from the
date of
issue
E
2,500,000
Optimize Commercial Scale Flash Joule
Heating Unit(a)
1 years
from the
date of
issue
3 years
from the
date of
issue
F
2,500,000
Secure a sub-license agreement for use
of the Flash Joule Heating technology by
an entity that will result in the generation
of revenue of no less than $1 million
within the first 12 months of the license
being issued
2 years
from the
date of
issue
3 years
from the
date of
issue
G
2,500,000
Upon realising the first sales revenue from
the Flash Joule Heating technology(b)
3 years
from the
date of
issue
4 years
from the
date of
issue
(a) Optimize Commercial Scale Flash Joule Heating Unit means that the equipment/plant to enable the
Flash Joule Heating technology to be used commercially has been developed and built and has been
shown to be able to treat at least one (1) tonne of raw material (e-waste, battery waste, coal fly ash,
bauxite residue or similar resource streams) per day with extraction rates of metals contained in the feedstock to be demonstrated as being economic based on the prevailing costs of electricity and other inputs
into the extraction process and to be able to demonstrate that this can be scaled to the equivalent of ten
(10) tonnes per day of raw material input into the Flash Joule Heating equipment/plant;
(b) Revenue means income generated from sources which include, but may not be limited to, technology
licensing fees, royalties, product sales, etc.
4
Share your feedback
Discover