Annual Report to shareholders
Released
Released
Announcement PDF
2026 ANNUAL REPORT
BUILDING A BREAKTHROUGH PLATFORM FOR CRITICAL METALS PROCESSING
Metallium Ltd
2026 Annual Report
CONTENTS
Corporate Directory
Directors’ Report
Auditor’s Independence Declaration
Financial Year 26 Highlights
Consolidated Statement of Profit or Loss & Other Comprehensive Income
Consolidated Statement of Financial Position
Consolidated Statement of Changes in Equity
Consolidated Statement of Cash Flows
Notes to the Consolidated Financial Statements
Consolidated Entity Disclosure Statement
Directors’ Declaration
Independent Auditor’s Report
Corporate Governance
Additional Shareholder Information
From Laboratory Science To Industrial Platform
Establishing The Commercial Chain
Letter to shareholders
Beyond E-Waste
3
4
10
12
13
14
16
47
48
49
50
51
52
79
80
81
86
87
90
Page
LETTER TO SHAREHOLDERS
Metallium Ltd
2026 Annual Report Page
MICHAEL WALSHE
MANAGING DIRECTOR & CEO
JOHN HANNAFORD
NON-EXECUTIVE CHAIRMAN
FY2026 was a transformational year for Metallium. Over the course of the
12 months, we made substantial progress in taking Flash Joule Heating
from its origins as breakthrough science developed at Rice University
toward an engineered, increasingly de-risked industrial processing
platform. At the same time, we established a permanent U.S. operating
base, invested significantly in engineering and operational capability, built
a substantially larger team, secured major commercial relationships,
expanded the application of FJH across multiple strategic metals and
strengthened the Company’s balance sheet and access to U.S. capital
markets.
The scale of that transformation is important.
When Metallium first acquired the rights to commercialise FJH for critical-
metal recovery, the technology had demonstrated extraordinary potential
at laboratory scale. Turning that science into an industrial process required
considerably more than simply building a larger reactor. It required
engineering, automation, materials handling, gas management,
environmental controls, analytical capability, permitting, process
integration and, critically, the people capable of bringing all of those
elements together. That has been a major focus of our investment.
During the year, our Gator Point Technology Campus in Chambers County,
Texas became the centre of this effort. The site has been substantially
redeveloped into an integrated technology and processing campus capable
of supporting FJH development, customer testing and progressive
commercial scale-up.
The technology itself has advanced materially. Across the broader
development program, Metallium has now undertaken more than 100 FJH
campaigns and increased reactor scale by approximately 400,000 times -
from early Rice laboratory experiments to multi kilogram commercial-scale
reactor systems. We progressed from individual reactor flashes to
extended-duration campaigns and ultimately to the simultaneous
operation of multiple commercial-scale FJH units.
~ 400,000 x
reactor scale
increase
4
In May 2026, we completed a 12-hour continuous reactor campaign. The
following month, three FJH units were operated simultaneously over a
further 12-hour campaign, completing 18 batches of inert feedstock and
processing approximately 0.3 tonnes of material, with 83% availability and
approximately 100% utilisation during active operation. These milestones
are significant because they move FJH beyond laboratory proof-of-concept
and provide real operating data on which we can engineer the next stage of
scale-up.
Building more than a plant
Just as importantly, we have invested heavily in the capability required
around the technology. During FY2026 we expanded Metallium’s team
across engineering, technology development, laboratory operations,
construction and project management, operations, finance, commercial
development and U.S. government engagement.
We supplemented that internal capability with experienced external
engineering and technical partners. The Company's objective is to develop
a repeatable industrial processing platform capable of being operated
safely, reliably and economically and ultimately deployed across multiple
feedstocks and locations.
From technology to commercial ecosystem
Commercialisation requires considerably more than technology. It requires
feedstock, processing capability, customers and downstream markets.
During FY2026 we made material progress across each part of that chain.
Binding arrangements now cover approximately 4,000 tonnes per annum of
PCB feedstock, representing approximately 50% of our targeted Stage 1
requirement at Gator Point. This includes a binding agreement with
Glencore for up to 2,400 tonnes per annum.
On the downstream side, we entered into a 10-year initial-term offtake
agreement with Indium Corporation covering gallium, germanium and other
critical metals recovered from secondary materials and electronic scrap.
These relationships begin to establish the commercial architecture around
FJH: secure suitable material, process it domestically using Metallium
technology and sell recovered metals back into established industrial
supply chains.
Page 5
Letter to Shareholders
One technology platform, multiple markets
Electronic waste remains our primary initial commercial focus because
PCB-rich material combines high metal grades, established supply chains
and attractive concentrations of gold, copper, silver, tin and other valuable
metals. But the potential addressable market for FJH is considerably
broader.
During the year, Metallium continued to demonstrate the versatility of the
platform across rare earth elements, gallium, germanium, indium, and
other strategic metals, using feedstocks ranging from electronic waste and
semiconductor residues to mineral concentrates, tailings and industrial
wastes. This distinction is fundamental to how we view Metallium.
Metallium is not being built as a single-purpose recycling plant. We are
building a scalable metals-processing technology platform with
applications across the periodic table.
In recycling applications, that may involve Metallium building and
operating its own processing capacity. In mineral processing and other
applications, the opportunity can extend to licensing, royalties, processing
fees, joint ventures and strategic partnerships, potentially allowing FJH to
scale without Metallium funding every underlying resource project.
The strategic environment has changed
The timing of this development is significant. Critical minerals have moved
rapidly from an industry issue to an economic and national-security
priority. China continues to dominate processing across many of the metals
essential to semiconductors, defence, advanced manufacturing and modern
electronics.
Western governments are responding by directing substantial capital
toward domestic mining, processing, recycling and supply-chain
infrastructure. Metallium is increasingly participating directly in that
environment.
Page 6
Metallium Ltd
2026 Annual Report
During FY2026, our U.S. subsidiary progressed from a Phase I SBIR
program into a Phase II award of up to US$1 million through the U.S.
Department of War's Defense Logistics Agency, supporting pilot-scale
development of FJH for recovery of gallium and germanium from electronic
waste. This is strategically important not simply because of the funding. It
provides external validation that the technology we are developing
addresses materials that the United States considers important to its
industrial and national-security interests.
Financial strength to execute
We have also deliberately strengthened the financial platform required to
pursue this opportunity. In January 2026, Metallium completed a A$75
million strategic capital raising led by U.S.-based institutional investors,
materially increasing U.S. institutional participation on our register and
providing substantial additional capital for Gator Point, technology
development and commercial scale-up.
We also established a sponsored ADR program, with Metallium ADRs
trading in the United States under MTLMY, further improving access for
North American investors. These developments reflect another important
evolution in Metallium: as our operations have increasingly moved to the
United States, so too has our shareholder base and capital-markets
strategy.
US$1 million
US$1 million
Phase II
Phase II
award
award
US$1 million
Phase II
award
7
Page
Letter to Shareholders
The next phase
There remains considerable work ahead. The technical challenge is
increasingly shifting from proving that FJH can process these materials
toward demonstrating reliable, repeatable and commercially competitive
operation at progressively larger scale. Our priorities for FY2027 are
therefore clear: continue the scale-up and integration of Gator Point;
increase reactor operating hours and throughput; progress toward Stage 1
PCB processing capacity; secure the remaining feedstock required to
support that capacity; generate increasingly robust operating and economic
data; and convert our growing pipeline of industry and government
relationships into commercial outcomes. At the same time, we will continue
to develop the broader applications of FJH across rare earths,
semiconductor metals and other critical-material feedstocks.
The opportunity we are pursuing is substantial. For decades, much of the
metals-processing industry has relied on large, capital-intensive and
chemically intensive flowsheets. At the same time, Western economies
have become increasingly dependent on overseas processing capacity for
materials fundamental to defence, electronics and advanced
manufacturing. We believe technology can help change that equation.
FJH offers the potential for a different model: electrically driven, modular,
rapidly deployable processing capable of recovering value from materials
ranging from electronic waste to mineral resources and industrial residues.
FY2026 was about building the people, infrastructure, engineering
capability and commercial relationships required to take FJH toward
industrial scale. FY2027 is about demonstrating increasingly repeatable
operation, increasing throughput and converting that platform into
commercial outcomes.
On behalf of the Board, I thank our employees, partners and shareholders
for their support during what has been an extraordinary period of growth
and development for Metallium.
Michael Walshe
Metallium Ltd
2026 Annual Report 8
Page
9
Page
Letter to Shareholders
Metallium Ltd
2026 Annual Report
FINANCIAL YEAR 26
HIGHLIGHTS
A$50M INSTITUTIONAL
CAPITAL RAISING
COMPLETED
Significance: Provided
funding to accelerate U.S.
commercialisation,
engineering and development
of Gator Point.
COMMERCIAL-SCALE
FJH REACTOR
VALIDATED
Significance: Culmination of
~18 months of technology
maturation from laboratory
testing into industrial
engineering; major step in de-
risking reactor scale-up.
GATOR POINT
TECHNOLOGY CAMPUS
SECURED
Significance: Established
Metallium's permanent U.S.
industrial base for
commercialisation,
demonstration and continued
technology development.
REE PROGRAM
EXPANDED WITH RICE
UNIVERSITY
Significance: Sponsored
research commenced into
next-generation REE
separation, building on FJH's
demonstrated ability to
produce upgraded SX-ready
intermediates.
U.S. MULTI-SITE
EXPANSION STRATEGY
LAUNCHED
Significance: Options secured
over pre-permitted sites in
Massachusetts and Virginia,
demonstrating the potential
replicability of the modular
deployment model.
FIRST U.S.
DEPARTMENT OF
DEFENSE SBIR
CONTRACT
Significance: Formal entry
into the U.S. federal funding
system, targeting domestic
gallium recovery from waste
using FJH.
UCORE BINDING REE
COLLABORATION
Significance: Established a
pathway combining
Metallium's FJH upgrading
with Ucore's RapidSX™
technology for U.S.-based
REE processing.
GLENCORE MOU —
FEEDSTOCK AND
OFFTAKE FRAMEWORK
Significance: Major Tier-1
industry validation and
framework for e-scrap supply
and downstream product
offtake.
GATOR POINT DESIGN
EXPANDED TO 8,000
TPA STAGE 1
Significance: Increased
planned PCB feed capacity
approximately fivefold from
the original 350 tpa concept,
with infrastructure designed
for further modular
expansion.
PEER-REVIEWED
MAGNET RECYCLING
BREAKTHROUGH
Significance: Rice research
using FJH-chlorination
demonstrated >90% REE
purity & yield, with materially
lower energy, emissions &
OPEX versus the benchmark
conventional route.
HARTS RANGE HEAVY-
REE RESULTS AND
COMMERCIAL RIGHTS
Significance: FJH upgraded
raw ore from ~1.7% to ~35%
TREO in a single step,
demonstrating potential
application beyond waste
into primary mineral
processing.
ELEMENTUSA
STRATEGIC
COLLABORATION
Significance: Expanded the
platform into gallium and
scandium recovery from red
mud, with a potential
licensing, processing-fee and
revenue-share model.
JUL 2025 AUG 2025
AUG 2025 SEP 2025
SEP 2025 OCT 2025
OCT 2025 NOV 2025 DEC 2025
10
Page
BINDING GLENCORE E-
SCRAP SUPPLY
AGREEMENT
Significance: Secured up to
2,400 tpa of e-scrap, moving
the relationship from MOU to
binding commercial feedstock
supply.
FIRST CHLORINE FLASH
AT GATOR POINT —
COMMISSIONING
COMMENCED
Significance: First integrated
operation of FJH-chlorination
at the Texas campus; three-
crucible demonstration line
also operational.
SPONSORED ADR
PROGRAM
ESTABLISHED
Significance: Increased direct
accessibility to Metallium for
U.S. investors under MTLMY.
GATOR POINT SCALE-
UP AND ORGANISATION
EXPANDED
Significance: Continued site
development alongside
significant investment in
engineering, technology,
laboratory,
construction/project delivery
& broader organisational
capability.
A$75M STRATEGIC
CAPITAL RAISING
Significance: Led by U.S.-
based institutional investors,
materially strengthening the
balance sheet for U.S.
commissioning and scale-up.
12-HOUR CONTINUOUS
COMMERCIAL-SCALE
FJH CAMPAIGN
Significance: Demonstrated
stable extended-duration
operation, automation and
supporting systems — an
important reduction in scale-
up risk.
~4,000 TPA PCB
FEEDSTOCK
CONTRACTED
Significance: Took contracted
feedstock to approximately
50% of the targeted 8,000
tpa Stage 1 requirement.
10-YEAR INDIUM
CORPORATION
OFFTAKE
Significance: Established a
long-term downstream
pathway for gallium,
germanium and other critical
metals recovered from
secondary materials.
U.S. DOW PHASE II
AWARD — UP TO
US$1M
Significance: Progression
from Phase I into pilot-scale
development and scale-up of
gallium and germanium
recovery using FJH.
3 COMMERCIAL-SCALE
FJH UNITS OPERATED
SIMULTANEOUSLY FOR
12H
Significance: 18 batches,
~0.3 tonnes processed, 83%
availability and ~100%
utilisation during active
operation — direct operating
evidence supporting the
modular scale-up model.
DEC 2025 JAN 2026
JAN 2026 MAR 2026 MAY 2026
MAY 2026
JUNE 2026
11
Page
FY26 Highlights
FROM LABORATORY SCIENCE
TO INDUSTRIAL PLATFORM
Metallium Ltd
2026 Annual Report
Since acquiring the rights to commercialise Flash Joule Heating for critical-
metal recovery, Metallium has invested substantially in transforming
breakthrough science developed at Rice University into an engineered
industrial processing platform.
The scale of this development has been significant. Across the program,
FJH reactor capacity has increased approximately 400,000-fold, from early
50 mg laboratory experiments to 20 kg commercial-scale systems,
supported by more than 100 FJH campaigns. This progression has required
development well beyond the reactor itself, encompassing automation,
materials handling, gas management, environmental controls, analytical
capability and integrated process engineering.
During FY2026, this work progressed into extended-duration and multi-
reactor operation at Gator Point. Metallium successfully completed a 12-
hour continuous reactor campaign, followed by the simultaneous operation
of three commercial-scale FJH units for 12 hours.
These milestones represent important steps in progressively de-risking
FJH from laboratory-scale science toward repeatable industrial operation.
Reactor scale increase
50 mg →20 kg
400,000×
100+
FJH campaigns
completed
12
Page
3 reactors
Operated
simultaneously
Extended-duration
operation demonstrated
12 hours
ESTABLISHING THE
COMMERCIAL CHAIN
During FY2026, the Company secured binding arrangements for electronic-
scrap feedstock and progressed relationships with established industry
participants. By May 2026, contracts covered approximately 4,000 tonnes
per annum of PCB feedstock, representing 50% of the Company's Stage 1
target of 8,000 tonnes per annum. This included the previously announced
agreement with Glencore for up to 2,400 tonnes per annum of e-scrap
feedstock.
13
Page
On the customer side, Flash Metals USA entered into a 10-year initial-
term offtake agreement with Indium Corporation covering gallium,
germanium and other critical metals recovered from secondary raw
materials and electronic scrap.
Together, these arrangements represent important building blocks in
Metallium's commercial model: securing suitable feedstock, processing
material through FJH and establishing downstream pathways for recovered
metals. The next phase is to integrate these elements through
progressively larger-scale operations at Gator Point.
While e-waste and PCB processing remained the Company's primary initial
commercial application, FY2026 also demonstrated the broader
addressable market for FJH.
Metallium advanced technology programs across rare earths, gallium,
germanium, indium and other strategic metals, using feedstocks such as
electronic waste, semiconductor residues, mineral concentrates, tailings
and industrial waste.
The Company broadened its rare earth pathway through collaboration with
Rice University and entered into a binding collaboration with Ucore to
assess combining Metallium’s FJH upgrading technology with Ucore’s
RapidSX separation technology.
Metallium also advanced the Harts Range heavy rare earth opportunity.
FJH testwork upgraded raw ore from approximately 1.7% TREO to
approximately 35% TREO in a single step, highlighting the platform’s
potential beyond secondary materials and into primary mineral processing.
At the same time, the Company expanded its work on recovering gallium
and scandium from red mud and other industrial residues, opening
potential pathways through licensing, processing fees, revenue sharing and
strategic partnerships.
These programs are important because they test the same core FJH
platform against multiple high-value feedstocks and potential commercial
models, extending the opportunity beyond Metallium-owned recycling
operations
BEYOND E-WASTE
Metallium Ltd
2026 Annual Report 14
Page
15
Page
DIRECTORS’ REPORT
Metallium Ltd
2026 Annual Report 16
Page
Directors’ Report
17
The Directors of Metallium Limited present their report on the consolidated entity consisting of Metallium Limited
(“Company” or “Metallium”) and the entities it controlled at the end of, or during, the year ended 30 June 2026
(“Consolidated Entity” or “Group”).
DIRECTORS & OFFICERS
The names and details of the Group’s directors in office at any time during the financial year or since the end of the
financial year are set out below. Unless otherwise stated, Directors held their office from 1 July 2025 until the date of
this report.
Michael Walshe – Managing Director & CEO
Appointed CEO 9 August 2024; Managing Director 22 November 2024
Mr Walshe has over 15 years of international experience in engineering, operations,
technology commercialisation and project development roles across the minerals,
chemicals and renewable energy sectors. He brings over a decade of experience with
industry leader Metso, covering all major commodities including lithium, rare earths, gold,
and base metals. Michael holds a Bachelor of Chemical and Process Engineering (Hons.)
from University College Dublin and a Master of Business Administration (Finance) from the
Australian Institute of Business. He is a chartered engineer with both Engineers Australia &
the Institution of Chemical Engineers (IChemE) and is a member of the Australasian Institute
of Mining & Metallurgy (AusIMM).
Other current public directorships Voltaic Strategic Resources Ltd (ASX: VSR): Appointed 9
August 2024
Critical Minerals Limited (ASX: T92): Appointed 22 April
2026
Former public directorships in the last 3 years Nil
John Hannaford – Non-Executive Chairman
Appointed 13 November 2020
Mr Hannaford is an experienced company director and executive with extensive experience
as a director of ASX listed companies. A qualified Chartered Accountant and Fellow of the
Securities Institute of Australia, he has founded and listed several public companies. He
has also advised numerous companies through the ASX listing process in his corporate
advisory career.
Other current public directorships Nil
Former public directorships in the last 3 years Kula Gold Ltd (ASX: KGD): Resigned 18 Oct 2023
Forrestania Resources Ltd (ASX:FRS): Resigned 24 Jul 2025
Voltaic Strategic Resources Ltd (ASX:VSR): Resigned 10 Sep
2025
Anthony Hadley – Independent Non-Executive Director
Appointed 20 July 2023
Mr Hadley is a metallurgist, a rare earth element (REE) technical expert and a senior manager
with more than 30 years’ experience in the mining industry. He spent 11 years at Lynas
Corporation, where he was the GM for the Mount Weld Rare Earth Mine during construction
and commissioning. He has designed process flowsheets for all the major primary rare earth
minerals, including monazite, bastnaesite, xenotime and rare earth ionic clays. Mr Hadley
holds a BSc in Extractive Metallurgy and Chemistry from Murdoch University.
Other current public directorships Nil
Former public directorships in the last 3 years Nil
Directors’ Report cont.
18
Paul Niardone – Independent Non-Executive Director
Appointed 15 April 2024
Mr Niardone is a highly qualified company director with more than 30 years’ experience in
managerial and executive roles for ASX-listed companies, private entities and not-for-profit
organisations. His equity capital markets expertise includes more than 50 IPOs and capital
raisings totalling more than $360m. Paul specialises in building and executing growth
initiatives and utilising his wide network of contacts while working with government. Paul
was Founder and Executive Director of Professional Public Relations, the largest PR and
communications firm in Western Australia.
Other current public directorships The Agency Group Australia Ltd (ASX: AU1): Appointed 19
December 2016
Pathkey.AI Limited (ASX: PKY): Appointed 21 October 2025
Australian Critical Minerals Ltd (ASX: ACM): Appointed 22
October 2025
Former public directorships in the last 3 years Nil
Kellie Benda – Independent Non-Executive Director
Appointed 10 August 2026
Ms Benda is an experienced Non-Executive Director, former investment banker and lawyer
with extensive expertise in capital markets, investment, strategy, governance, risk and
business transformation. Kellie brings significant experience in capital allocation, strategic
growth, government and regulatory engagement, and the commercialisation of complex
industrial businesses. She holds a Master of Finance, is a graduate of the Harvard Advanced
Management Program, and is a Fellow of the Australian Institute of Company Directors
(AICD) and member of Chief Executive Women (CEW).
Other current public directorships Nil
Former public directorships in the last 3 years Midway Limited (ASX: MWY): Resigned 18 February 2025
Josh Hawes – Independent Non-Executive Director Elect
Appointed 10 August 2026
Mr Hawes has over 15 years’ experience across financial investment, commodities, and
advanced technologies, having served in executive roles at Delta1X, Hawking Alpha, and USA
Rare Earth. During his tenure at USA Rare Earth, he served as Chief Strategy Officer and Chief
of Staff. He holds a degree in Wireless Software Engineering from Auburn University along
with multiple financial designations and licenses
Other current public directorships American Resources Corporation (NASDQ: AREC): Appointed 6
September 2023
Former public directorships in the last 3 years Nil
Dennis Wilkins – Company Secretary
Appointed 2 October 2025
Mr Wilkins is the founder and Principal of DWCorporate Pty Ltd (DWCorporate), a corporate
advisory firm located in Perth, Australia, that has been providing commercial, strategic, and
corporate governance services to domestic and international exchange-listed entities for
over 20 years. Dennis is supported by a team at DWCorporate, drawing on comprehensive
knowledge of all aspects of company secretarial and governance matters, including the
Corporations Act and Australian Stock Exchange (ASX) Listing Rules.
Directors’ Report cont.
19
PRINCIPAL ACTIVITIES
During the year, Metallium Ltd’s principal activities were the development and commercialisation of Flash Joule
Heating (FJH) technology for the recovery of critical and precious metals from end-of-life electronics, industrial residue,
and mineral ore-based feedstocks.
Through its U.S. subsidiary, Flash Metals USA Inc., the Company advanced plans for a commercial-scale demonstration
plant in Texas and executed strategic feedstock and collaboration agreements with recyclers, industrial groups and
critical minerals developers. The FJH technology is a transformative process that enables selective recovery of critical
and precious metals which supports national-security aligned supply chains and monetizes e-waste in an economic
and sustainable way.
The Group entered into several agreements to divest its mineral exploration projects in Australia and Canada, while
focusing its primary efforts on establishing a U.S.-centric clean-metals technology business.
REVIEW OF OPERATIONS
FROM BREAKTHROUGH SCIENCE TO AN INDUSTRIAL PLATFORM
FY2026 marked a defining transition for Metallium - from demonstrating the potential of Flash Joule Heating
(“FJH”) at laboratory scale to engineering, commissioning and operating the technology as an industrial
processing platform.
Over the year, Metallium progressed the FJH platform through successive stages of scale-up, integration and
operational validation, while simultaneously building the infrastructure, engineering capability, commercial
relationships and capital base required for deployment at scale.
The magnitude of this progression is reflected in the approximately 400,000-fold increase in reactor scale, from
early 50 mg laboratory experiments to approximately 20 kg commercial-scale reactor systems, supported by
more than 100 FJH campaigns. This scale-up has required substantially more than enlargement of the reactor
itself, encompassing automation, materials handling, gas management, environmental controls, analytical
capability and integrated process engineering.
The Company believes this represents a significant reduction in technology scale-up risk and provides an
engineering foundation for the deployment of modular FJH processing systems across multiple feedstocks and
locations.
COMMERCIAL-SCALE REACTOR VALIDATION
A major focus of FY2026 was demonstrating that FJH could move beyond short-duration laboratory and pilot
campaigns into stable, repeatable and increasingly automated commercial-scale operation.
In May 2026, Metallium completed a 12-hour continuous commercial-scale FJH reactor campaign at its Gator
Point Technology Campus in Texas. The campaign validated reactor integrity, automation systems, operating
procedures and supporting systems over an extended operating period, with initial results indicating potential
throughput above the Group's original internal design assumptions.
This was followed in June 2026 by Metallium's first multi-reactor operating campaign, with three FJH reactors
operating simultaneously for 12 hours. The campaign achieved:
• Processing of 18 batches;
• Approximately 0.3 tonnes of material processed;
• 83% reactor availability; and
• Approximately 100% utilisation during active operation.
The campaign was completed with zero safety incidents and zero lost-time injuries and generated critical
operating, instrumentation, controls and engineering data to inform subsequent scale-up and commercial
deployment.
Directors’ Report cont.
20
Importantly, the campaign demonstrated that Metallium's modular reactor architecture can operate multiple
units in parallel, providing the basis for increasing throughput through replication rather than relying solely on
increasingly large individual reactors.
The technology development program therefore progressed during FY2026 from the question of “can FJH process
these materials?” toward the more commercially important questions of reliability, repeatability, throughput,
utilisation, operating cost and scale.
GATOR POINT – FROM SITE ACQUISITION TO US INDUSTRIAL BASE
The Group's Gator Point Technology Campus in Chambers County, Texas became the centre of Metallium's U.S.
technology development, commissioning and commercialisation activities during FY2026.
Acquired in 2025, the site underwent extensive rehabilitation and infrastructure development, including
electrical systems, water infrastructure, processing areas, laboratory capability and installation of FJH and
supporting equipment. By March 2026, Metallium had transformed the site from a previously underutilised
industrial facility into its primary U.S. technology demonstration and early commercial processing hub.
The campus was progressively configured around an integrated processing flowsheet incorporating:
• Feedstock receiving and pre-processing;
• FJH reactor systems;
• Post-processing and product recovery;
• Laboratory and analytical capability; and
• Utilities and supporting infrastructure.
The development philosophy was deliberately modular, allowing capacity to be increased through additional
reactor and processing modules as technology performance and commercial demand are demonstrated.
STAGE 1 COMMERCIAL CAPACITY EXPANDED MATERIALLY
During FY2026, Metallium materially increased the scale of its planned first-stage U.S. proc