First Commercial FJH Technology Services Agreement
Released
Released
Announcement PDF
Australia: Perth, Western Australia
USA: Houston, Texas
METALLIUM LIMITED
ASX: MTM | OTCQX: MTMCF | OTCQX ADR: MTLMY
ENGAGE WITH THIS ANNOUNCEMENT ON INVESTORHUB: HERE
ASX Release 4 August 2026
Metallium Signs First Technology Services Agreement Advancing
Processing-as-a-Service Strategy
▪ Metallium signs its first commercial monetisation deal for the Flash Joule Heating (FJH) platform: a 12-month
technology services agreement with Environmental Clean Technologies (ASX: ECT) to evaluate FJH — using rapid
heating with chlorine — as a faster, more scalable alternative to conventional HF-based processing for producing
‘MXenes’, using Metallium's Gator Point reactor systems and engineering support.
▪ Total ‘Phase-1’ consideration up to US$1.4m (~A$2.0m): US$500,000 payable unconditionally on execution,
remaining US$900,000 in four quarterly instalments of US$225,000 from 1 November 2026, plus 20 million ECT
options at A$0.18/share (12-month expiry) — the options subject to ECT shareholder approval1
.
▪ Represents Metallium’s first commercial validation of strategy to monetise expanding FJH intellectual property
portfolio through technology services, commercial licensing, royalty streams and strategic partnerships.
▪ Provides a framework under which the parties may negotiate in good faith a potential long-term commercial
licence and royalty agreement (‘Phase-2’) following successful completion of the R&D programme.
▪ ECT holds the exclusive licence to commercialise FJH for MXene production, but lack a working reactor platform
— rather than build from scratch, ECT is leveraging Metallium's already-developed, scaled reactor systems and
Gator Point Technology Campus to accelerate its MXene programme
▪ Establishes a template for Metallium's "Processing-as-a-Service" model — engineering/licensing revenue
alongside its core Build-Own-Operate metals recovery business
▪ MXenes are ultrathin 2D materials prized for conductivity, EMI shielding and energy-storage applications across
defence, electronics and batteries, but commercial production has been constrained by slow, hazardous, hard-
to-scale HF-based methods — the gap FJH is being evaluated to address.
▪ Metallium retains ownership of its proprietary FJH reactor technology and all future technology improvements.
Metallium Limited (“Metallium” or the “Company”) (ASX: MTM; OTCQX: MTMCF; OTCQX ADR: MTLMY) is pleased to
announce that via its wholly owned subsidiary Flash Metals USA, it has entered into a 12-month Research & Development
and Engineering Support Services Agreement with Environmental Clean Technologies Limited (ASX: ECT) ("ECT").
This agreement represents the first commercial monetisation of Metallium's proprietary Flash Joule Heating platform and
the first commercial implementation of the Company's ‘Processing-as-a-Service’ strategy. The agreement demonstrates
how Metallium's proprietary FJH platform can be commercialised through engineering services, technology access,
licensing and, where appropriate, royalty arrangements alongside its core ‘Build, Own & Operate’ processing operations.
Under the agreement, ECT will undertake an agreed research and development programme at Metallium's Gator Point
Technology Campus in Chambers County, Texas, focused on applying FJH technology to the production of MXenes and
related advanced materials. Metallium will provide engineering support services, reactor access and technical expertise
throughout the programme.
Managing Director & CEO Michael Walshe commented: "This agreement represents an important milestone in Metallium's
commercial evolution. While our primary focus remains building a leading U.S. critical metals processing business, we have
always believed Flash Joule Heating is a platform technology capable of creating value well beyond metals extraction. This
agreement represents the first commercial monetisation of that broader platform strategy and validates the significant
investment we have made in developing our proprietary reactor technology, engineering capability and Gator Point
Technology Campus."
1
Based on total contracted cash payments of US$1.4 million over the initial 12-month term (approximately A$2.0 million based on prevailing exchange rates), excluding the value of the ECT options. The
agreement remains subject to its terms and conditions, including shareholder approvals required by ECT for the issue of options and certain fee arrangements.
2
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
"MXenes represent one of the most exciting emerging classes of advanced materials, with potential applications across
defence, advanced electronics, next-generation batteries, sensors and water treatment. Their combination of high value and
constrained global supply has created a compelling commercial opportunity, however conventional manufacturing methods
remain slow, hazardous and difficult to scale. We believe our proprietary Flash Joule Heating platform has the potential to
deliver a step-change in manufacturing efficiency, scalability and production economics, and we look forward to working
closely with ECT as it progresses the commercial development of this exciting technology."
"Importantly, this agreement demonstrates how Metallium can commercialise its proprietary Flash Joule Heating platform
while retaining ownership of the underlying intellectual property. We believe it establishes a repeatable commercial pathway
through engineering services, technology access, commercial licensing and, where appropriate, long-term royalty
arrangements, complementing our core Build, Own & Operate strategy. The inclusion of an equity component also aligns
Metallium's interests with ECT's long-term success and provides potential additional upside as ECT advances the commercial
development of its MXene programme."
ECT Chairman Faldi Ismail commented: "Metallium's significant investment in developing a proprietary, scalable Flash Joule
Heating reactor platform, together with its engineering expertise and established Gator Point Technology Campus, provides
ECT with an accelerated and capital-efficient pathway to advance our MXene programme. We believe Flash Joule Heating
has the potential to overcome the manufacturing constraints that have historically limited commercial MXene production,
and we look forward to working closely with Metallium as we progress the technology toward commercialisation."
STRATEGIC SIGNIFICANCE
This agreement demonstrates several important milestones for Metallium:
• First commercial revenue generated directly from monetising Metallium's proprietary Flash Joule Heating platform.
• Independent 3rd
-party validation of the commercial value of Metallium's reactor technology & engineering expertise.
• Establishes Gator Point as a commercial technology campus capable of supporting strategic industry partners.
• Represents the first commercial implementation of Metallium's Processing-as-a-Service strategy.
• Creates a commercial template for future services, technology access, licensing & potential royalty arrangements.
COMMERCIAL TERMS
Under the agreement, Metallium will receive (Phase-1):
• US$500,000 upfront cash payment;
• US$225,000 quarterly engineering support and facility service fees during the 12-month term;
• 20 million ECT options, exercisable at A$0.18 per share and expiring 12 months from issue (subject to ECT
shareholder approval). ECT shares last traded at A$0.135 on 23 July 2026, prior to the suspension of trading
pending the announcement of the proposed MXene transaction. No value has been attributed to the options for
the purpose of calculating the consideration figures set out above.
Total cash consideration over the initial 12-month term is up to US$1.4 million (approximately A$2.0 million based on an
AUD/USD exchange rate of 0.7 as at 3 August 2026), excluding the value of the ECT options. Of this amount, US$500,000
is payable unconditionally on execution and the remaining US$900,000 is payable in quarterly payments of US $225,000
commencing 1 November 2026.
Under the agreement, Metallium retains ownership of all existing and future intellectual property relating to its reactor
systems, engineering improvements, process developments and technology enhancements, while ECT will own MXene
product produced during the agreed research programme. The agreement also includes comprehensive protections
preventing reverse engineering, replication and unauthorised use of Metallium's proprietary technology. The parties have
also agreed to negotiate in good faith a potential longer-term commercial licence and royalty agreement (Phase-2)
following completion of the initial programme. The agreement does not oblige either party to enter into such a licence. The
agreement is legally binding on the parties. It has an initial term of 12 months and may be terminated by either party for
material breach or on insolvency of the other party, and by either party on 90 days' written notice. ECT is not a related party
of MTM.
3
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
ABOUT MXENES: TWO-DIMENSIONAL TRANSITION METAL CARBIDES AND NITRIDES WITH EXCEPTIONAL PROPERTIES
FOR A WIDE RANGE OF HIGH-PERFORMANCE APPLICATIONS
MXenes are an emerging family of advanced two-dimensional (2D) transition metal carbides and nitrides, most commonly
based on titanium, produced from precursor feedstock materials known as ‘MAX phases’. MAX phases are layered ceramic
materials comprising alternating atomic layers of a transition metal (such as titanium), carbon and a relatively weakly bonded
"A" element (typically aluminium). Selectively removing the "A" layer produces atomically thin MXene sheets, typically only
one to two nanometres thick. These ultrathin materials combine exceptional electrical conductivity, high surface area,
tunable surface chemistry, mechanical flexibility and hydrophilic characteristics, giving rise to a unique combination of
properties that has attracted significant global research and commercial interest.
These exceptional characteristics position MXenes as a potential enabling material across a broad range of high-
performance applications, including advanced defence materials, electromagnetic interference (EMI) shielding, high-
performance electronics, thermal management, sensors, catalysis, water treatment, and next-generation energy
storage technologies such as batteries and supercapacitors.
Figure 1: Overview of MXenes, illustrating their atomically layered structure, representative morphology and key functional properties
(Source: Pogorielov, M. et al., 2021; ECT (2026)).
Figure 2: Conceptual illustration of the proposed and potential FJH production pathway for MXenes. Layered MAX phase precursor
materials are subjected to rapid FJH in the presence of chlorine to selectively remove the "A" layer as volatile metal chlorides,
producing atomically thin two-dimensional MXene sheets with surface terminations (Tₓ) for subsequent delamination and downstream
applications. Illustration is conceptual and not intended to represent an actual process flow or operating conditions. Conceptual
illustration developed by Metallium. Scientific concepts adapted from Pogorielov, M. et al., 2021.
4
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Despite this significant potential, commercial adoption has remained limited because conventional manufacturing methods
typically rely on hazardous hydrofluoric acid (HF)-based chemical etching to selectively remove the "A" layer from MAX
phase precursors. These processes are generally slow, difficult to scale, environmentally challenging and relatively
expensive, resulting in constrained commercial production despite rapidly growing industrial demand.
ECT believes Metallium's proprietary Flash Joule Heating platform has the potential to provide a faster, more scalable and
more energy-efficient production pathway for MXenes. Rather than relying on conventional HF-based chemical etching, the
process will be evaluated as an alternative approach for selectively removing the "A" layer from MAX phase precursors
using rapid Flash Joule Heating in the presence of chlorine. Under the agreement, ECT will utilise Metallium's Gator Point
Technology Campus, proprietary FJH reactor systems and engineering expertise to evaluate and optimise the application of
FJH technology for commercial MXene production.
ABOUT ECT
Environmental Clean Technologies Limited (ASX: ECT) is an Australian technology company focused on the development
and commercialisation of innovative environmental and advanced materials technologies. The Company's technology
portfolio includes Rapid Electrothermal Mineralisation (REM), which applies Flash Joule Heating technology under an
exclusive Rice University licence for the remediation of PFAS-contaminated soils and activated carbon, together with its
proprietary COLDry drying technology. ECT has expanded its Flash Joule Heating technology portfolio via an exclusive
licence to commercialise Flash Joule Heating technology for the production of MXenes.
The Engineering Agreement combines ECT's exclusive commercial rights for MXene production using FJH with Metallium's
proprietary Flash Joule Heating reactor platform, engineering capability and Gator Point Technology Campus, providing an
accelerated and capital-efficient pathway to evaluate and commercialise scalable MXene production. For more information,
see https://ectltd.com.au/about/
METALLIUM’S COMMERCIALISATION STRATEGY
While Metallium's immediate commercial priority remains deploying its FJH technology through Build, Own & Operate
facilities recovering critical and precious metals from electronic waste and other strategic feedstocks, the Company has
consistently viewed FJH as a platform technology with applications extending well beyond critical minerals processing.
The agreement demonstrates that Metallium's proprietary reactor technology, engineering capability and operational know-
how have commercial value across adjacent advanced manufacturing sectors. Importantly, the agreement also validates the
Company's investment in its Gator Point Technology Campus, which has evolved beyond an internal development facility
into a commercial technology centre capable of supporting strategic partners seeking to accelerate the commercialisation
of FJH-enabled applications.
The Company intends to commercialise its proprietary FJH platform through complementary business models depending
on the application and customer requirements:
• Build, Own & Operate (Core Strategy)
Metallium owns and operates FJH processing facilities, generating revenue through the recovery and sale of critical
and precious metals.
• Processing-as-a-Service
For selected applications and strategic partners, Metallium intends to provide access to its proprietary FJH platform
through commercial arrangements that may include reactor deployment, equipment supply, operator support,
technology licences and, where appropriate, ongoing processing fees and royalty arrangements.
Typical commercial pathway:
Technology Services
Pilot & Demonstration
Commercial Deployment
Long-term Processing-as-a-Service Agreement
5
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
Potential revenue streams include:
Engineering services
Technology licences
Reactor & equipment supply
Operator support
Services and spare parts
Processing fees
Royalties
The ECT agreement represents the first commercial implementation of this Processing-as-a-Service pathway,
commencing as a Technology Services engagement with the potential to progress, subject to successful outcomes and
future agreement between the parties, toward a longer-term Processing-as-a-Service commercial arrangement.
Figure 3: Metallium is commercialising its proprietary Flash Joule Heating platform through complementary Build, Own & Operate and
Processing-as-a-Service strategies, enabling both owned operations and capital-light third-party growth opportunities.
This announcement has been authorised for release by the Board of Directors of Metallium Limited.
For further information, please contact:
Michael Walshe
Managing Director & CEO
Metallium Ltd
info@MetalliumInc.com | +61 8 6391 0112
Andrew Keys
Investor Relations & Corporate Communications
Keys Thomas Associates
Andrew.keys@keysthomas.com | +61 400 400 380
6
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
ABOUT METALLIUM LIMITED
Metallium Ltd (ABN 27 645 885 463), is pioneering a low-carbon, high-efficiency approach to recovering critical and precious metals
from mineral concentrates and high-grade waste streams. The company’s patented Flash Joule Heating (FJH) technology enables the
extraction of high-value materials, including gallium, germanium, antimony, rare earth elements, and gold — from feedstocks such as
refinery scrap, e-waste, and monazite.
Aligned with U.S. strategic supply chain objectives, Metallium has recently secured its first commercial site in Texas via its wholly owned
subsidiary, Flash Metals USA Inc., marking a major step toward near-term production and revenue generation.
To learn more, visit:
Website: metalliuminc.com
Contact: info@metalliuminc.com | +61 8 6391 0112
Investor Hub: investorhub.metalliuminc.com
𝕏 x.com/Metallium_MTM
www.linkedin.com/company/metalliumltd
USA Office: 12 Greenway Plaza, Suite 1100, Houston, Texas USA 77046
Australia Office: Unit 4, 22 Railway Road, Subiaco, Western Australia
REFERENCE:
Pogorielov, M. et al. (2021). MXenes—A New Class of Two-Dimensional Materials: Structure, Properties and Potential Applications.
Nanomaterials, 11(12), 3412, LINK).
7
ASX: MTM | OTCQX: MTMCF and MTLMY (ADR)
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements concerning Metallium Limited (Metallium or the Company), including
statements regarding the performance and outcome of the research and development programme to be undertaken under the
agreement, the potential application and scalability of FJH technology for commercial MXene production, the possible negotiation of
a longer-term commercial licence and royalty agreement, the potential to establish a repeatable technology-monetisation model,
anticipated commercial deployment activities, and the Company's future plans, strategy and objectives.
Forward-looking statements can generally be identified by the use of words such as “may”, “will”, “expect”, “intend”, “plan”,
“estimate”, “anticipate”, “believe”, “target”, “forecast”, “project”, “potential”, “continue”, “should”, “seek”, and similar expressions.
These statements are based on information available to Metallium as at the date of this announcement and on assumptions and
expectations that the Company considers to be reasonable as at that date, including assumptions regarding: continued successful
operation and reliability of the FJH reactor platform; the availability and characteristics of suitable feedstock; the timing and outcome
of ongoing commissioning and optimisation activities; the availability of capital, equipment, personnel, services, regulatory approvals
and site access required to perform the Company's obligations under the agreement; ECT obtaining the shareholder approvals
required for certain fee payments and for the issue of the options; the absence of material adverse changes in commodity prices,
exchange rates, input costs and general economic and market conditions; and continued progress of customer, partner and offtake
discussions.
Forward-looking statements are not guarantees or predictions of future performance and involve known and unknown risks,
uncertainties and other factors, many of which are beyond the Company's control. Actual results, performance or achievements may
differ materially from those expressed or implied by the forward-looking statements. Such risks and uncertainties include, but are
not limited to: technology scale-up and commissioning risk; feedstock supply, grade and recovery variability; processing throughput
and yield variability; capital and operating cost variability; financing risk; regulatory, permitting and environmental risk; intellectual
property risk; reliance on key personnel, contractors and partners; competition; and broader macroeconomic, market and geopolitical
conditions.
Anticipated commercial outcomes, potential licensing or royalty arrangements and timelines referred to in this announcement are
indicative only. They are not forecasts and are subject to the assumptions, risks and uncertainties described above. There is no
guarantee that these targets will be achieved, in the timeframes indicated or at all.
Investors should not place undue reliance on forward-looking statements. Except as required by the ASX Listing Rules, the
Corporations Act 2001 (Cth) and applicable law, Metallium does not undertake any obligation to update or revise any forward-looking
statement, whether as a result of new information, future events or otherwise.
Share your feedback
Discover